Post Job Free
Sign in

Electrical Project

Location:
Blackpool, United Kingdom
Posted:
February 08, 2013

Contact this candidate

Resume:

DAVID WAUGH

**/* ********** *****

Edinburgh EH* 7RP

Mobile +447********* Home 013********

D.O.B 24/09/1957

************@**********.***

Profile

• Over 20 years experience as an Approved Electrician,Electrical

Technician,Eex.Inspector,Chargehand,Supervisor

• Good comunication skills,able to liaise with clients,proven ability to organise materials

and labour

• Worked overseas in places such as Canada,Netherlands,Croatia,Abu Dhabi,Norway

• Very strong team player,also very good working solo

• Proven ability on the inspection of Eex kit,diagnose and high light for replacement or

remidial work

• Good experience red lining drawings,walk downs,reading and interpreting drawings

electrical regulations

• I am dependable,hard working,and very motivated

• Demonstrated knowledge in maintaining testing electrical systems and i enjoy hands on

technical challenges,project and problem solving of all kinds.

Also commissioning, and pre- commissioning

Qualifications and Certificates

J.I.B Approved Electrician

2391 Testing and Inspection Certificate

R.G.I.T Offshore Training Certificate

UK Offshore Oil and Gas Medical Certificate

CompEx Hazardous Areas Certificate

Talisman P.T.W Permit to Work course safe isolation and lock off

17th Edition Regulations Level 3

Norwegian Offshore Basic Training Saftey Certificate

M.I.S.T

D ron and Dickson

Jasmine Gas T reatment Module

Rosetti M a r ino Yard

R avenna

I taly

Q/C Atex E & I I nspections

Doing a detailed Atex inspection on F i re and Gas,

T race Heating etc.. to compile an Atex Register for the

i nitial history for all the Atex kit on this Gas T reatment

M odule which is pa rt of the Jasmine / Judy P roject

D ron and Dickson

Voyageur-Spirit F.P.S.O

I n i tial detailed inspections

Sept 2012 to present

Working to a close inspection survey and initial detailed inspections on new gas

separation skid, red – lining where needed and giving weekly reports on system

s tatus.

HESS South Arne Project

D ragados Offshore

Working as QC E& I Atex Inspector

Reporting on defects on two well heads the North Well Head,and the

East Well Head, making good priority issues, working in tandem with

D ragados Electrical personal, and South Arne commissioning team. Also

supervising the taking out of 67 barrier glands that were put together in

an unacceptable manner, changing glanding and making all enclosures

f it for purpose in the tight schedule given to me.

CADIZ

SPAIN – From June 21st t ill August 15th

Dunbar Platform [ Total ]

Working for Rockwell Automation

Deconstruct H.V.A.C systems

Install new system test and inspect as

Job card dictates

From 20th March till June 19th

Claymore Tallisman

Working for N.R.L Woodgroup

Scope of work involved, modifications on the fire and gas

Systems

From Dec 16 –Till 17th March

Electrical technician

Balmoral oil rig- Premier Oil

Working for M.C.I

Scope of work involved, working with the vendor replacing navigation lights

From Dec 2 till Dec 13

Electrical technician

St Fergus -working for the agency N.R.L on the National Grid Stations as a CompEx

Electrician, mainly working on single core 300mm cables from sub -stations to

transformers, containment, dressing, cleating,and getting them

ready for terminating.

From October till Dec 2011

Norway Stavanger SBM MOPU Stor [norway]

working as an Electrical Inspector carrying out Eex inspections,associated

repairs,updateing hazardous area equipment register,teaching and supervising the

remidial work,doing pre-commisioning walk downs,red lining drawings when

required.also doing commissioning on the platform Working for S.P.I.E,-S.B.M,-Talisman

From September 2010 till July 2011.

Abu Dhabi S.P.I.E-SBM -Talisman on the Jack-Up MOPU Stor

Working as an Electrical Technician/Electrical Inspector carrying out remidal work on

Eex kit and making it fit for purpose,supervising local Elects on terminating makeing off

the correct glands for the correct kit,and starting to compile Eex register

From May 2010 till July 2010

Woodgroup Sollum Voe Shetland Islands

Working as an Electrical Technician on the Shell Arora Project,installing and terminating

associated cableing and containment for the new project.

From May 2010 till June 2010

Eurotech Ltd Croatia Transoceans Manhatton Project

Working as an Electrical Technician overseeing the up grade of the galley and

accomodation areas.

From January 2010 till April 2010

Burntisland Bi- Fab yard, Judy Accomodation Rig

Working as an Electrical Technician carrying out full Eex Atex Inspections to bring the

project up to current standards,also remidial work.

From September 2009 till December 2009

Plenary Project Solutions Bluewater Aoka Mizu F.P.S.O Vessel Rotterdam

Working as an Atex Inspector carrying out a full Eex inspection and remidial works.

From Feb 2009 till June 2009

Balfour Kilpatrick Sellafield British Nuclear Fuels

Working as an Approved Electrician on a project designed to re-cycle waste from the

plant.

From July 2008 till Feb 2009

Watson+Norrie L+G Project C.B.I, Isle of Grain Kent

Working as an Approved Electrician on new and up-grade of L+G project mainly

containment,and glanding and terminating

From March 2008 till July 2008

E.I.W.H.S new airport terminal 5 at Heathrow

working as an Approved Electrician,then chargehand,also health and safety

duties,mainly working in cohesion with Vander Lande who were the conveyor installers

and automated baggage systems,following drawings and layouts.

From August 2005 till March 2008

B.M.S Wembely Stadium London

Working as an Approved Electrician-chargehand on new build stadium in charge of level

5 delegating,dealing with materials labour and testing and good comunications with the

other trades.

From Feb 2003 till August 2005

Nala Engineering B+Q Superstore Edinburgh

Working as an Approved Electrician on a new build store,fire alarms,lighting,small

power,audio and camara systems C.C.T.V,IPAF and testing.

From July 2002 till Feb 2003

ABC Corries Haifax Nova Scotia Canada

Working as an Electrical Technician,up-grading and making good systems such as trace

heating PA systems,installation of JBs for lighting,terminating and testing and inspection

of fire and gas.

From Jan 2002 till May 2002

Watson+Norrie Golden Eye Terminal St Fergus

Working as an Approved Electrician on the new terminal working with ladder rack,cable

tray,generaly fitting the containment running the cables etc..

From March 2001 till Dec 2001

Watson+Norrie Merk Sharp and Dhome pharmacuticals

Working as an Approved Electrician working mainly in the H.V.A.C cabinets

From July 2000 till Jan 2001

Balfour Kilpatrick New Royal Infirmary Edinburgh

Working as an Approved Electrician on the new build hospital.

From Dec 1998 till Feb 20000

Kvaerner Engineering Methil Fife Oil Rig the Captain

From August 1998 till Dec 1998

Balfour Kilpatrick Marks and Spencer Edinburgh

Working as an Approved Electrician

From Dec 1997 till July 1998

B.M.S -H.Q.2 Canary Wharf London

Working as an Approved Electrician

From Nov 1996 till August 1997

Kvaerner Engineering Methil Fife Oil Rig The Mungo

Working as an Approved Electrician

From April 1996 till October 1996

N.G Bailleys South Gyle Edinburgh

Working as an Approved Electrician

From Jan 1993 till Jan 1996

Lummus Crest -Mossmorran Fife

Working as an Approved Electrician, it was the very first big project i was on, how

things change

From August 1982 till Jan 1984

My Apprentice was served with,

John G MacIntosh Engineering

3a Dundas Street

Edinburgh

REFERENCES

Stephen Costigan-Atex Manager with S.P.I.E

+447*********

*************@*******.**.**

Steven Dotchin-Atex Supervisor with Aker

+447*********

*********@*******.**.**

James Wishart -SKN

+447*********

********@***.**.**



Contact this candidate