DAVID WAUGH
Edinburgh EH* 7RP
Mobile +447********* Home 013********
D.O.B 24/09/1957
************@**********.***
Profile
• Over 20 years experience as an Approved Electrician,Electrical
Technician,Eex.Inspector,Chargehand,Supervisor
• Good comunication skills,able to liaise with clients,proven ability to organise materials
and labour
• Worked overseas in places such as Canada,Netherlands,Croatia,Abu Dhabi,Norway
• Very strong team player,also very good working solo
• Proven ability on the inspection of Eex kit,diagnose and high light for replacement or
remidial work
• Good experience red lining drawings,walk downs,reading and interpreting drawings
electrical regulations
• I am dependable,hard working,and very motivated
• Demonstrated knowledge in maintaining testing electrical systems and i enjoy hands on
technical challenges,project and problem solving of all kinds.
Also commissioning, and pre- commissioning
Qualifications and Certificates
J.I.B Approved Electrician
•
2391 Testing and Inspection Certificate
•
R.G.I.T Offshore Training Certificate
•
UK Offshore Oil and Gas Medical Certificate
•
CompEx Hazardous Areas Certificate
•
Talisman P.T.W Permit to Work course safe isolation and lock off
•
17th Edition Regulations Level 3
•
Norwegian Offshore Basic Training Saftey Certificate
•
M.I.S.T
•
D ron and Dickson
Jasmine Gas T reatment Module
Rosetti M a r ino Yard
R avenna
I taly
Q/C Atex E & I I nspections
Doing a detailed Atex inspection on F i re and Gas,
T race Heating etc.. to compile an Atex Register for the
i nitial history for all the Atex kit on this Gas T reatment
M odule which is pa rt of the Jasmine / Judy P roject
D ron and Dickson
Voyageur-Spirit F.P.S.O
I n i tial detailed inspections
Sept 2012 to present
Working to a close inspection survey and initial detailed inspections on new gas
separation skid, red – lining where needed and giving weekly reports on system
s tatus.
HESS South Arne Project
D ragados Offshore
Working as QC E& I Atex Inspector
Reporting on defects on two well heads the North Well Head,and the
East Well Head, making good priority issues, working in tandem with
D ragados Electrical personal, and South Arne commissioning team. Also
supervising the taking out of 67 barrier glands that were put together in
an unacceptable manner, changing glanding and making all enclosures
f it for purpose in the tight schedule given to me.
CADIZ
SPAIN – From June 21st t ill August 15th
Dunbar Platform [ Total ]
Working for Rockwell Automation
Deconstruct H.V.A.C systems
Install new system test and inspect as
Job card dictates
From 20th March till June 19th
Claymore Tallisman
Working for N.R.L Woodgroup
Scope of work involved, modifications on the fire and gas
Systems
From Dec 16 –Till 17th March
Electrical technician
Balmoral oil rig- Premier Oil
Working for M.C.I
Scope of work involved, working with the vendor replacing navigation lights
From Dec 2 till Dec 13
Electrical technician
St Fergus -working for the agency N.R.L on the National Grid Stations as a CompEx
Electrician, mainly working on single core 300mm cables from sub -stations to
transformers, containment, dressing, cleating,and getting them
ready for terminating.
From October till Dec 2011
Norway Stavanger SBM MOPU Stor [norway]
working as an Electrical Inspector carrying out Eex inspections,associated
repairs,updateing hazardous area equipment register,teaching and supervising the
remidial work,doing pre-commisioning walk downs,red lining drawings when
required.also doing commissioning on the platform Working for S.P.I.E,-S.B.M,-Talisman
From September 2010 till July 2011.
Abu Dhabi S.P.I.E-SBM -Talisman on the Jack-Up MOPU Stor
Working as an Electrical Technician/Electrical Inspector carrying out remidal work on
Eex kit and making it fit for purpose,supervising local Elects on terminating makeing off
the correct glands for the correct kit,and starting to compile Eex register
From May 2010 till July 2010
Woodgroup Sollum Voe Shetland Islands
Working as an Electrical Technician on the Shell Arora Project,installing and terminating
associated cableing and containment for the new project.
From May 2010 till June 2010
Eurotech Ltd Croatia Transoceans Manhatton Project
Working as an Electrical Technician overseeing the up grade of the galley and
accomodation areas.
From January 2010 till April 2010
Burntisland Bi- Fab yard, Judy Accomodation Rig
Working as an Electrical Technician carrying out full Eex Atex Inspections to bring the
project up to current standards,also remidial work.
From September 2009 till December 2009
Plenary Project Solutions Bluewater Aoka Mizu F.P.S.O Vessel Rotterdam
Working as an Atex Inspector carrying out a full Eex inspection and remidial works.
From Feb 2009 till June 2009
Balfour Kilpatrick Sellafield British Nuclear Fuels
Working as an Approved Electrician on a project designed to re-cycle waste from the
plant.
From July 2008 till Feb 2009
Watson+Norrie L+G Project C.B.I, Isle of Grain Kent
Working as an Approved Electrician on new and up-grade of L+G project mainly
containment,and glanding and terminating
From March 2008 till July 2008
E.I.W.H.S new airport terminal 5 at Heathrow
working as an Approved Electrician,then chargehand,also health and safety
duties,mainly working in cohesion with Vander Lande who were the conveyor installers
and automated baggage systems,following drawings and layouts.
From August 2005 till March 2008
B.M.S Wembely Stadium London
Working as an Approved Electrician-chargehand on new build stadium in charge of level
5 delegating,dealing with materials labour and testing and good comunications with the
other trades.
From Feb 2003 till August 2005
Nala Engineering B+Q Superstore Edinburgh
Working as an Approved Electrician on a new build store,fire alarms,lighting,small
power,audio and camara systems C.C.T.V,IPAF and testing.
From July 2002 till Feb 2003
ABC Corries Haifax Nova Scotia Canada
Working as an Electrical Technician,up-grading and making good systems such as trace
heating PA systems,installation of JBs for lighting,terminating and testing and inspection
of fire and gas.
From Jan 2002 till May 2002
Watson+Norrie Golden Eye Terminal St Fergus
Working as an Approved Electrician on the new terminal working with ladder rack,cable
tray,generaly fitting the containment running the cables etc..
From March 2001 till Dec 2001
Watson+Norrie Merk Sharp and Dhome pharmacuticals
Working as an Approved Electrician working mainly in the H.V.A.C cabinets
From July 2000 till Jan 2001
Balfour Kilpatrick New Royal Infirmary Edinburgh
Working as an Approved Electrician on the new build hospital.
From Dec 1998 till Feb 20000
Kvaerner Engineering Methil Fife Oil Rig the Captain
From August 1998 till Dec 1998
Balfour Kilpatrick Marks and Spencer Edinburgh
Working as an Approved Electrician
From Dec 1997 till July 1998
B.M.S -H.Q.2 Canary Wharf London
Working as an Approved Electrician
From Nov 1996 till August 1997
Kvaerner Engineering Methil Fife Oil Rig The Mungo
Working as an Approved Electrician
From April 1996 till October 1996
N.G Bailleys South Gyle Edinburgh
Working as an Approved Electrician
From Jan 1993 till Jan 1996
Lummus Crest -Mossmorran Fife
Working as an Approved Electrician, it was the very first big project i was on, how
things change
From August 1982 till Jan 1984
My Apprentice was served with,
John G MacIntosh Engineering
3a Dundas Street
Edinburgh
REFERENCES
Stephen Costigan-Atex Manager with S.P.I.E
*************@*******.**.**
Steven Dotchin-Atex Supervisor with Aker
*********@*******.**.**
James Wishart -SKN
********@***.**.**