Post Job Free
Sign in

Data Entry Engineering

Location:
Sharjah, SH, United Arab Emirates
Salary:
1000 USD
Posted:
January 18, 2013

Contact this candidate

Resume:

RESUME

Taimur Arshad Siddiq

Address: House No# 786/A Near Peshawar Model Girls School, Irshadabad Warsak Road

Peshawar, PAKISTAN.

Contact No: +92-321*******

abnzu5@r.postjobfree.com

OBJECTIVE:

To work in a dynamic & challenging environment where I can contribute constructively by employing my

leadership, managerial, analytical, technical, and interpersonal skills and also learn through practical

interactive experience.

ACADEMIC QUALIFICATION:

BSc Electrical Engineering (2007 - 2012)

• Majors: Power

• Minors: Communication

University of Engineering and Technology (U.E.T) Peshawar, PAKISTAN

TECHNICAL SKILLS:

Engineering Simulation Tools:

• Knowledge of PSPICE, MATLAB, Electronics Workbench, and Proteus.

Embedded Systems:

• Programming of 8051 family of Microcontrollers in Assembly and C languages.

Professional Engineering Courses:

• SCADA (Supervisory Control and Data Acquisition) using Winlog

• PLC (Programmable Logic Controller) - Siemens

• AutoCAD

COMPUTER SKILLS:

• Adept in Microsoft Visual C++

• Possess knowledge of web development using Microsoft FrontPage, Microsoft Publisher & FTP Protocol

• Have got hold on computer graphics softwares like Adobe Photoshop, Ulead etc.

• Got full command over MS Office programs such as Microsoft Word, Microsoft Excel, Microsoft PowerPoint

• Got profound knowledge of computers; including fixing of errors & viruses, repairing and maintenance of

computers, Windows installation, creating networks such as LAN, WAN & their troubleshooting.

INTERNSHIPS:

• 13-12-2011 to 13-2-2012: Internship at Protection & Instrumentation, Peshawar Electric Supply Company

PAKISTAN

• 1-7-2010 to 14-11-2010: Internship at 132KV Grid Station Peshawar, PAKISTAN

WORK EXPERIENCE:

• Admin & Managerial Assistant – Hotel River Star, Kalam, Swat PAKISTAN (June 2006 – August 2006):

Personally leased & managed the complete running of affairs, supervising a staff of five, while being

responsible for:

1. Customer dealing

2. Cash Handling

3. Revenue & Expenditure calculation

4. Book keeping

MAJOR ENGINEERING PROJECTS:

• Improving power factor of a reactive load:

By using a microprocessor and a combination of different relays; a practical model was implemented which

improved the power factor of a reactive load by showing the result on LCD.

• Designing a record based software for data entry:

Made and designed a program using Microsoft Visual C++ for data entry and record keeping.

• Implementing SAP computer:

A project was made using logical gates that could perform the basic operations of mathematics such as

Addition, Subtraction, Multiplication, and Division. SAP computer was the first computer made in the history

that we made as well.

• Power flow control in Smart Grid Station:

It was a fully automatic project in which there was no wastage of electricity. Electricity production was

dependent upon the requirement of load. The more load was put on the system; more electricity was

generated and vice versa. In case of extra energy generated, it was delivered to DC batteries serving backup

for consumers in case of maintenance of generators. A theft detection system was also installed that would

give an indication of theft of electricity.



Contact this candidate