Post Job Free
Sign in

Manager Power Plant

Location:
Adana, 01170, Taiwan
Posted:
January 16, 2013

Contact this candidate

Resume:

CURRICULUM VITAE

SURNAME : SIVEREKLIOGLU

NAME : TEKIN

PLACE & DATE OF BIRTH : 20.10.1954

NATIONALITY : TURKISH

LOCATION : TURKEY

EDUCATION : Mech. Eng. Department of Engineering Faculty of Çukurova University, Adana City of TURKEY.

Mechanical Engineer (BSC), 1981

WORK EXPERIENCE & REFERENCES :

ELECTRO- MECHANICAL WORKS MANAGER :

01.06.2012 – Continue

Iraq / Erbil City

Ilci Company as Contractor for Road Tunnels . 146.000.000.- USD total costs

I work as Manager for Electro-Mechanical works of Road Tunnels 5 Km. Ventilation Systems, Fire Fighting System, Electrical Control Systems, Automatic Control System ( SCADA ), Tunnels Ligthing System, Earting System and etc …

MECHANICAL WORKS MANAGER :

September 2010 – 07.05.2012.

In Iraq / Shaqlawa city 5 Stars Hotel …. 62.000.000.- USD total costs

ALMER Construction as Contractor for 5 stars Hotel Project, we have received all the mechanical plumbing, air conditioning / cooling and heating ( HVAC System ) with CHILLERS, installation projects - implementation and testing / commissioning work as a manager in charge of affairs. Works finished and delivered on 07 May 2012.

MECHANICAL WORKS MANAGER:

January 2009 - August 2010

Libya / Benghazi / Al Marge … 330.000.000.-USD total costs

Undertake the construction of 1336 apartments by ARSEL Construction Contractor Construction jobs, Housing Mechanical and HVAC systems installation and implementation work group worked as manager.

ELECTRO - MECHANICAL DEPARTMENT MANAGER :

03.01.2008 - 01.12.2008

TYUMEN CITY OF RUSSIAN Federation …. 150.000.000.- USD total costs

As Contractor we're given Subcontracting Theatre Building Project supervision and coordination of the electrical and mechanical divisions for Construction Electro-Mechanical. Mobilization, Infrastructure and environmental lighting, automatic garage doors, installation of domestic water, rain water and sewerage infrastructure works, HVAC systems ( AHU - CHILLERS - FCU - Radiator Systems ) ...

The Theatre project completed and delivered on dated 14 Dec. 2008.

ELECTRO - MECHANICAL WORKS MANAGER FOR BRANCH OF RUSSIA:

September 2006 to December 2007

Employment Nova Constr. And Palmira Group - Russia … 7.500.000 and 45.000.000.- USD total costs .

All Electro-mechanical works for Industrial Buildings in Lipetsk and Chelyabinsk Cities of Russia .

Prepared industrial building with electro mechanical works, installed which special machines .

Installed Fire Fighting systems, High Pressure Air Compressors and piping system, HVAC system with Chillers and AHU systems etc…

SITE CHIEF FOR OIL PLATFORM AND DISTRUBUTOR PUMPING STATION :

Dec.2004 - Sept.. 2006

ENKA – BECHTEL JV as Contractor at the Sakhalin Island of Russia … 1.500.000.000 USD

Product and Installed Oil Platform with pumping and piping systems for Storage all oil wich taken from sea and carriage to south side of Sakhalin Island by pipes .

Installed Oil Tanks, LPG Tanks, Pump Stations with Piping system .

WASTE WATER TREATMENT AREA REHABILITATE TECHNICAL MANAGER

February 2004 – Nov. 2004

Employment with MPE Engineering in Baghdad City of Irak …. 5.000.000.- USD total costs

Rehabilitate and repairing of Waste Water Treatment Plant of Baghdad city .

MANAGER FOR PRODUCT PETROLEUM ( OIL ) TANKS ;

June 2002 – February 2004

In Mersin City of Turkey

Product and installed miscellaneous Oil tanks wich capacity 5.000 – 10.000 – 20.000 – 30.000 and 35.000 M3 each one for oil storage areas

ELECTRO – MECHANICAL INSPECTOR MANAGER ;

March1999 – May. 2002 335.000.000.- USD total costs

Employment with Kentkur & Kennedy Donkin Engineering Consultant Consortium for Adana Greater City Municipality LRV (Light Rail Vehicle ) project .

Alarko, Adtranz & ABB Electrik Consortium as contractor

At supplier Greater City Municipality –Adana, the inspection of Light Rail Vehicle System project . ( 4 years total )

HVAC systems, water line systems, rail systems, workshop area, sewer line systems, rail route system, railway trains, stations building system of trains, water pumps areas, car wash system, car repair and periodical maintenance area, all maintenance equipment, fire alarm system and fire equipment, smoke detector system, fire water system and water lines, crane system with electrical, welding system of trains, rail welding system, rail fittings system, rail installations system, management buildings system, control system and guard buildings . ( Total 13 stations and one depot area .)

Testing all equipment at origins ; Sweden, Belgium, South Korea, Germany, Netherland and others…

PURCHASING CHIEF ;

Jan.1994 – August.1998

Employment PILSA PLASTIC SAN. A.S. Adana City in Turkey

Purchasing all materials from Turkey and from other countries for fabricating PVC and PPR pipes at this factory .

INSTALLATION PETROLUM TANKS AND PUMP STATION MANAGER :

June 1992 – Dec.1993

Contractor Mechanical System Co. – Turkey ….

We prepared and installed 25.000, 30.000 and 40.000 M3 capacity Oil Tanks with Pumps and Piping system for Oil Tanks Station of Mersin Refinery in Mersin city in Turkey .

OPERATING MANAGER ;

Jan.1990 -- April 1992

Employment with BINLADEN Construction Corporation / Saudi Arabia .. 2.500.000.000.- USD total costs

Trane Make Chiller System and pipe line, Nitrogen Gas pipe line with high pressure, water supply unit and pipe lines systems for drinking water, water treatment system and pipe line, rail system for railway car, water pipe line for buildings, pipe line system for camping area, air handling unit system, housing clean system, clean system for chemical, general maintenance and periodical and preventive maintenance of power plant ( diesel electrical generators ) .

The Railway Systems operation and maintenance which complete inside of tunnel buildings

THE GROUP MANAGER FOR HVAC SYSTEM, POWER PLANT, WATER SYSTEM AND NITROGEN SYSTEM INSTALLATION AND MAINTENANCE ;

Jan.1988 -- Jan.1990

Employmen with BINLADEN Const. Co. / Saudi Arabia

Workshop for work machines, power plant installation and working, Trane make chiller plant installation, water pipe line installation, supplier water tunnel pipe line installation, water treatment system installation and start up, diesel electrical generators installation and start up of power plant, concrete plant installation, telecomunication building installation, tunnels fire water pipe line and fire alarm system installation, tunnels drinking water pipe line installation, Nitrogen line with high pressure installation, air handling units ( for chiller plant) installation, blast door installation ( for tunnels ), water pipe line system installation for building, water plant pipe lines testing with high pressure, liquit nitrogen tanks installation, drain system for chemical with chrome pipe line, stainless steel tank installations for chemical system .

Installation two way Railway system for carriage passenger and materials ( 20 Km total ) . Install 10 stations and 2 maintenance workshop . The railway system was running by electrical

OTHER SKILLS / TRAININGS :

Steel Construction installations, pipe lines ( LNG, Oil, Water, Natural Gas, Air etc.), pipe fitters construction machinery & concrete plant installations, operation & maintenance, elevator design and installation, All machines periodical and preventive maintenance and installation works .

COMPUTER LITERACY : PC programs ( MS office –Word, Excel ), AUTOCAD

LANGUAGE :

Turkish ; Main Language

English both technical (translation) and daily ( Good )

Russian : Speaking, writing and reading ( Good )

Arabic : Speaking ( Middle )

COURSES / SEMINAERES / CERTIFICATES :

* Deutz Diesel Electrical Generators Maintenance and Start-Up Training in German DEUTZ Firm on 1990 .

*ISO 9000 Quality System Training in Turkey T.S.E Government Company on 1996 .

*Elevator and Hydraulics Lifting System Designing and Applications System Engineering in Turkey Chamber of Mechanical Engineering .

*Natural Gas System Application Engineering in Turkey Chamber of Mechanical Engineering .

*Expert of Construction Control Engineering from Ministry of Public Works of Turkish Republic .

TELEPHONES :

IRAQ : ( +964 ) 750-***-**-**

e-Mail : ***************@*****.***

NOTE: As indicated above ; my engineering career in 32 years :

SUPPLY MACHINE, MACHINE MAINTENANCE, MECHANICAL INSTALLATION, PUMP STATIONS, MACHINE INSTALLATION, OPERATION, INSTALLATION HIGH PRESSURE PIPE SYSTEM, (HVAC) VENTILATION SYSTEMS, TECHNICAL SUPERVISION, RAIL SYSTEMS, PLUMBING WORKS, WASTE WATER TREATMENT AND DRINKING WATER TREATMENT PLANTS AND TECHNICAL EXPERTS . BUILDING CONTROL, PROCUREMENT AND TECHNICAL TEACHING, METAL MANUFACTURING POWER SYSTEMS, NATURAL GAS EQUIPMENT AND STEEL CONSTRUCTION departments such as elevators, construction site as well as site supervisor responsible for the application to work as engineering …. I worked for many years.

I know just about every topic relating to my profession. mechanical systems can solve all my savings information applications, a good application engineer.

I started the profession of engineering in the first years of the study, such as with still full of excitement and as a profession. I have good experience which I worked 18 different countries on the world has ever seen under control of the application techniques.

Dear Sirs,

I work in Iraq country as manager of electro mechanical works for road tunnels .

I want to work any country on the world as my career ( Senior Mech. Eng., Construction Manager or Project Manager ) for Oil / Gas or Building Projects .

Kindly please check my CV and send me invitation by e-mail .

With Best Regards

Mech. Eng. Tekin

+964-***-***-** 04



Contact this candidate