PROFESSIONAL RESUME
Of
Position Applied: CONSTRUCTION MANAGER
Tel. Number : Philippines: +63-919******* / +63-915*******
E-Mail Address : abnycm@r.postjobfree.com / abnycm@r.postjobfree.com
I. PROFESSIONAL QUALIFICATION :
Degreed Professional Engineer and over twenty eight (28) years broad - wide
experience in Engineering, Fabrication & Construction Industry which
covered all the stages as specified; 7 yrs in Project Management, 15 yrs in
Construction Management & over 6 yrs. in Site Supervisory in Managing,
Administering, Monitoring, Superintendence, Pre-com, Commissioning & Start-
up of EPC / EPIC / EPCC / EPCM Contracts, Project & Cost Management, Risk &
Safety and have a live Shutdown experience of Refinery (Brownfield -
SIMOPS). Has extensive employment in Project Management of Multi-discipline
& Multi-national Company in the field of Consulting & Construction in
various Electro-Mechanical and Underground Facility (Onshore / Offshore),
engaged and specialized in LNG, Oil & Gas, Crude, Pipeline, CPF Platform,
Well Drilling, Power Generation, Refining, Processing, Pulp & Paper, Mining
and Marine Jetty Terminal Projects, Worldwide. Has knowledge of Computer
(MS Office; Word, Excel, Access, Power Point & Outlook), can operate any
Office Equipment & Vehicle and with hands-on knowledge of Bar Chart / PERT
CPM Programs.
Projects completed in Middle East, Central Asia (Former USSR), North &
Central America, East Africa, North & South East Asia.
II. CAREER RESUME AND EMPLOYMENT HIGHLIGHTS:
January 2010 to December 2012 Client:
Zakum Development Co. (Subs. of Abu Dhabi National Oil Co.)
PENSPEN / ZADCO (Owner Representative - Project Management Consultancy) -
Zirkuh Island, Abu Dhabi, UAE
Produced Water Treatment Plant and Satah Full Filled Development Projects -
(Contract Valued $ 660 Million)
CONSTRUCTION MANAGER
Senior member of PMC in manage the overall brown-field construction of
Produced Water Treatment Plant & Satah Full Filled Development Projects.
Included Shutdown of 44 Tie-ins @ SFFD Project has completed on scheduled
May 2012. Oversee the fabrication, construction & commissioning carried-out
by FEED / EPC contractors to ensure scope of works is achieved in
accordance w/ contract time frames & in compliance w/ specification &
standards. Coordinates tasks to assigned supervisors ensure priority
disputes are resolved. Cooperate closely w/ Safety & QA/QC teams to ensure
standards are maintained & issues are monitored & address by site
supervision team. To verify proper PTW & interface system are well in
place. Reviewed & commented on documentation produced by contractor such
as: technical reports, specification procedures, drawings, etcetera.
September 2007 to September 2009 Client:
Ras Gas Co. Ltd. (Subs. of Exxon Mobil & Qatar Petroleum)
Ras Gas Company Ltd. (Owner Representative - Project Management Team) - Ras
Laffan Industrial City, Qatar
RGX II Onshore Expansion (LNG Train 6 & 7 and Al Khaleej Gas 2) Project -
(Contract Valued $3.2 Billion)
CONSTRUCTION SUPERINTENDENT
Mid member in PMT & assigned in none process area - brown-field such; Off-
sites, CCWP & Drilling 3-units Injection Well. Managed the construction &
pre-commissioning carried out by EPC contractor to ensure scope of work is
achieved in accordance w/ contract time frame & in compliance w/
specifications & standards. Coordinate tasks to assigned supervisors
ensuring priority disputes are resolved. Cooperate closely w/ safety &
QA/QC teams to ensure all standards are maintained & that issues are
closely monitored & addressed by site supervision team. To verify proper
PTW & interface system are in place. Reviewed & commented on documentation
produced by contractors such as: technical reports, specification
procedures, drawing, etc. Evaluate any change proposal/request to ensure
appropriate technical support is provided in decision making.
September 2006 to August 2007
Client: Vietnam Petroleum Co. Ltd. & Conoco Phillips
J Ray McDermott Indonesia (EPCM Contractor) - Batam, Indonesia
Su Tu Vang & North Belut Central Processing Facility and Heavy Skid-way &
Bulkhead Projects - (C. Value Lump Sum)
SENIOR CONSTRUCTION MANAGER
Manage the over-all fabrication & construction of 2 Heavy Skid-way &
Bulkhead and Su Tu Vang & North Belut Central Processing Facility. Oversee
2 CM & the contractor tasks encompasses of dredging, piling, civil, 265
bore drilling, bulkheads repair, marine & for CPF fabrication & erection
includes sandblasting, painting, structural, piping, electro-mechanical &
insulation. Set-up & organize all resources, parameters, check & monitor
progress, forecast, claims, interface yard operations, strict ruled of
QA/QC, EHS and lead meetings for tech. / safety / client / vendors/
contractor & pre-commissioning.
May 2006 to August 2006
CLIENT: PT Perusahaan Gas
Negara GEOCEAN INDONESIA (EPCC Contractor) - Maringgai, South Sumatra -
Cilegon, West Java, Indonesia
South Sumatra - West Java
Onshore - Offshore Gas Pipeline Project - (Contract Valued $42 Million)
LEAD PROJECT ENGINEER
Assist the Project Manager in managing the onshore-offshore contract
specifically in organizing, interfacing, pre-commissioning & sub-
contractors. Oversee & review the preparation of procedures, project cost,
engineering design, fabrication/erection, schedules, manpower, material
take-off, transporting, claims, parameters, meetings with strict ruled of
safety and QA/QC.
September 2004 to April 2006
CLIENT: PT Riau Andalan Pulp & Paper (RAPP)
PEC TECH INDONESIA (EPCM / EPIC / EPCC Contractor) - Kerinci, Riau,
Sumatera, Indonesia
332MW Coal-Fired Power Stationed; Pulp & Paper Machine - II & Converting
Plant; Dumai Fiber Mill Chip Plant & 320M Jetty Terminal; 355M Buton Jetty
Terminal and CAPEX Projects - (Contract Valued $650 Million)
SENIOR CONSTRUCTION MANAGER
Manage the over-all technical project management of all contractors for
onshore-offshore EPC projects includes refurbishment, interface with marine
& operations, set-up, organize, integration, commissioning, start-up &
final turn-over. Ensure achievement of project goals ahead / on-timely.
Oversee the preparation of procedures & total project cost of each
contracts, material take-off, forecast, schedule, parameters, invoices,
EHS, QA/QC & lead tech. / client / comm'l. / Vendor meetings. Evaluate
technical/commercial contractors bid to any CAPEX & S.M.B. Contracts &
award met standard requirement. Resolve problems arises with-in department,
operations & contractor's performance with efficient relation of the
Client.
January 2003 to June 2004
CLIENT: British Petroleum
SPIE CAPAG / PETROFAC J.V. (EPCM Contractor) - Republic of Georgia
Azerbaijan-Georgia-Turkey (BTC) Cross Country Pipeline Project - (Contract
Valued $2.95Billion - Project Cost $120Million)
CONSTRUCTION SUPERINTENDENT
Assist the CM in the construction of pump stationed Georgia II -
facilities, drilling of 3-units water wells & man-camp with complete
amenities. Oversee the piling, civil, structural, piping, equipment,
painting, insulation, Electro-mechanical, pre-com & commissioning. Closely
cooperate with Safety rule & QA/QC. Check & review the submittal of sub-
contractors progress, parameters, schedule, manpower, machinery, materials,
claims, and attend meetings for Client/Sub-con/Commissioning.
January 2002 to December 2002
CLIENT: Globelco Energy Corporation
INDUSMIN ENERGY (Owner Representative - Project Management Team) -
Lillooet, British Columbia, Canada
5MW Enterprise Hydro Power Plant (BOO / IPP) Project - (Cost is Under
Study)
PROJECT MANAGER
Run the project in gathering & collecting all pertinent data's for
feasibility study; Measure the flow of water, topographic & aerial survey,
environmental impact and geo-technical study. Leads development of project
with composed of multi-discipline team & effectively managed with-in
accordance of specific budget, schedule & safety.
January 2000 to November 2001
CLIENT: California Energy Corporation
CALIFORNIA ENERGY (Owner Representative - Project Management Team) -
Pantabangan, Nueva Ecija, Philippines
150MW Casecnan Hydro Electric Plant & Multi Purpose Dam (BOT / IPP) Project
- (Contract Valued $640 Million)
AREA CONSTRUCTION MANAGER
Senior member in PMT in managing & inspection of contractors task in
respect to heavy deep excavation (TBM / D&B Method), shot-creting,
grouting, civil, structural, piping, painting, electro-mechanical,
insulation, pre-com & commissioning of under-ground power stationed,
concrete dam, inlet/outlet intake, 132 KV switchyard, 2 shaft & 5 Adit in
27 km. tunnel length. Check & monitor the progress, claims, track
programmed, meetings, manpower, materials, equipment, QA/QC & rule of
safety, till completion.
January 1999 to December 1999
CLIENT: Coastal Petroleum
J.A. JONES CONSTRUCTION / ABB LUMMUS GLOBAL (EPCM Contractor) - Aruba,
Central America
Aruba Capacity Expansion Project (Oil & Crude Refinery) / Delayed Cocker II
Plant - (Contract Valued Cost Plus)
CIVIL / STRUCTURAL SUPERINTENDENT
Assign in Off-sites and Superintendence in respect to civil, structural,
piping, painting, insulation of onshore-offshore construction for the
refurbishment of coastal oil & crude refinery. Check & monitor site
progress, budget, track schedule, attend meetings & cooperate closely with
Safety & QA/QC for the live rehabilitation works of coastal Aruba capacity
expansion.
August 1997 to December 1998
CLIENT: Tanzania Power Limited
INDEPENDENT POWER TANZANIA LTD (Owner Representative - Project Management
Consultancy) - Tanzania, East Africa
100MW Tanzania Diesel Power Plant (BOT / IPP) Project - (Contract Valued
$160 Million)
SENIOR RESIDENT ENGINEER
Member in PMT in managing the contractor tasks in respect to 6km asphalt
road, man-camp, main plant & drilling of 2-units water wells. Supervise the
piling, excavation, civil, structural, piping, painting, electro-mechanical
& insulation. Review & check design of AFC drawings, preside meeting for
contractors & commissioning team. Monitor closely the progress, forecast,
schedule, manpower, equipment, material & claim. Oversee the QA/QC, safety,
commissioning, start-up & turn-over to Client.
May 1995 to April 1997 and April 1997 to July 1997
CLIENTS: Sarawak Electricity Corp./National Power Corp.
SIEMENS AG (EPCM Contractor) - Bintulo - Miri, East Malaysia and in
Masinloc - Labrador, Philippines
275 / 220 KV Overhead Power Transmission Line Project (220 & 95Km) -
(Contract Valued $50 & $35 Million)
PROJECT SITE MANAGER
Manage, administering & coordinating assigned project from conceptual
stages through planning, engineering, procurement, construction, start-up,
& close-out. Leads development of project, both design & construction
stages & ensure cost effective solution to technical issues. Manage &
supervise in planning the development of budget & schedule, forecast,
parameters, safety, QA/QC, invoice, monitor progress, etcetera & initiate
action assure the project objectives & schedule are met & work are
performed with-in the specific project budget. Resolve problem arises &
coordinate the final turnover of the project to the Client.
May 1994 to April 1995
CLIENT: YTL Power Generation Sdn. Bhd.
TENAGA EWBANK PREECE (Owner Representative - Project Management
Consultancy) - Johor, Malaysia
404MW YTL Combined Cycle Power Plant (BOO / IPP) Project - (Contract
Valued $420 Million)
SENIOR RESIDENT ENGINEER
Member in PMT in managing of all contractor works in respect to onshore-
offshore construction & completion of all aspects such piling, heavy
underground excavation, civil, structural, piping, equipment, painting,
electro-mechanical, insulation, pre-com & commissioning. Check & monitor
the forecast schedule, manpower, material, machinery, budget & invoices.
Oversee the QA/QC, Safety, pre-side meetings for contractors &
commissioning team, start up and assist final turn-over to the Client.
August 1992 to March 1994
CLIENT: China Power Corporation
PHILIPP HOLZMANN AG (EPC Contractor) - Panzhihua City, People's Republic of
China
3,300MW Ertan Hydro Electric Power Plant Project
SENIOR CIVIL ENGINEER
Assign at left & right diversion tunnels and report directly to the area
superintendent. Supervise the construction of the heavy underground
excavation (drill & blast), shot-creting, grouting, civil and structural
for the 3.7 km. total length (26M widthX24M height) left and right
diversion tunnels.
- Oct 1988 to July 1992
CLIENTS: NEA / San Miguel Corp / PPA / NPC / Surigao Nickel
Refinery
--Apr 1987 to Dec 1987; Dec 1987 to Mar 1988 and Mar 1988 to Sep 1988
=Nov 1981 to Apr 1983; May 1983 to Jun 1984 and Nov 1985 to Nov 1986
ATLANTIC GULF & PACIFIC COMPANY INC. (EPC / EPIC / EPCC / EPCM Contractor)
- Makati City, Philippines
- 5MW Janopol Mini-Hydro Power Plant Project
-- Pacific Star Building; Nasipit International Port and Monterey Slaughter
House & Meat Plant Projects
= Coal Mining Refinery & Jetty Terminal; 300MW Calaca Coal-Fired Power
Plant and Gaisano Metro Expansion Projects
PROJECT SUPERINTENDENT / OPERATION ENGINEER / CIVIL FIELD ENGINEER / CIVIL
FOREMAN- LEADMAN
- Report and assist the project manager in all aspect of construction,
testing / commissioning & field project management with encompasses of
heavy excavation, civil, structural, architectural, piping, painting,
insulation, electro-mechanical, rock fill dam, river training of
inlet/outlet & drilling of water well, strict rule of safety & QA/QC, start-
up and turn-over to the Client.
III. TRAINING AND SEMINARS:
1. TBOSIET & HUET Course - Emirates Technical & Safety Development
Center - Abu Dhabi, UAE
2. TAPROOT Seminar / Defensive Driving / Safety Observation &
Intervention Training - Ras Gas
3. Basic & Advance Learning of Computer - CAL Computer School
(Subsidiary of Informatics School)
4. Basic & Advanced First Aid Course - AG&P, ABB Lummus, BP/JV, J Ray
McDermott, Ras Gas & ZADCO
5. Basic & Advanced HSE Management Course - AG&P, ABB Lummus, BP/JV, J
Ray McDermott, Ras Gas & ZADCO
6. Basic & Advanced HSE Craft/Field Package -AG&P, ABB Lummus, BP/JV, J
Ray McDermott, Ras Gas & ZADCO
7. Basic & Advanced HSE Supv's./Security/HSE Personnel Package - ABB
Lummus, BP/JV, Ras Gas & ZADCO
8. Basic & Advanced Safety Course - AG&P, ABB Lummus, BP/JV, J Ray
McDermott, Ras Gas & ZADCO
IV. PERSONAL DATA :
USA ADDRESS : 635 Tuolumne Street,
Vallejo, California 94590, USA
PHILIPPINES ADDRESS : Pilar, Surigao Del Norte,
Philippines
NATIONALITY & PASSPORT # : Filipino & EB 6705981; Expired on
November 07, 2017
PLACE & DATE OF BIRTH : Pilar, Surigao Del Norte, Philippines &
November 06, 1961
HEIGHT & WEIGHT : 5' 6" & 85 kgs
CIVIL STATUS : Married and No Children
EDUC'L. ATTAINMENT : B.S. in Civil Engineering
NAME OF SCHOOL & ADDRESS : Cebu Institute of Technology - University
& Cebu City, Philippines
PROFESSION : Professional Civil Engineer (License
No. 77611 and Rating of 81.10%)
PROF'L. AFFILIATION : Member of Philippine Institute of
Civil Engineer
VALID TOURIST VISA : U.S.A. and Canada
Rex G. Espiel
Applicant
[pic]