Post Job Free

Resume

Sign in

Civil Engineer

Location:
Quezon City, NCR, Philippines
Posted:
January 14, 2013

Contact this candidate

Resume:

RUFINO B. RUALES, JR.

Civil Engineer E-MAIL ADDRESS :

abnx6x@r.postjobfree.com

MOBILE NOS. : +639*********

[pic] +632*******

LANDLINE NOS. :

PROFESSIONAL

QUALIFICATIONS

1990

Master in Engineering -

Structural sq.m. CFA) Mall / Retail &

(Academic Requirements October 2003 - November Cinema Areas with

Completed) 2003 10-Levels BPO, 5-Levels

Pamantasan Ng Lungsod Ng Camp Maintenance Manager, (27,000 sq.m. CFA) Parking

Maynila Life Support Proj. Areas, provided with

Manila, Philippines Custer Battles LLC, Iraq Perimeter Service Road,

complete with Civil Site

Works, Architectural &

1978 March 1994 - October 2003 Landscape Works, MEPS

Bachelor of Science in Project Manager cum Works and provision for

Civil Engineering Resident Engineer, STP and Cistern.

(Graduated) Project Management Group,

Adamson University TCGI Engineers, Philippines

Manila, Philippines Asian Development Bank

Multistory Carpark

PROFESSIONAL AFFILIATIONS (Design & Construction

December 1989 - August 1993 Management Services)

Registered Civil Engineer, Manadaluyong City,

No. 22419 Resident Engineer cum Cost Philippines, Yr.2010

Professional Regulation Engineer, PHP 147 M

Commission, Philippines Project Management Group &

Cost Engineering Group, Brief Project Description

Member, Philippine TCGI Engineers, Philippines

Institute of Civil

Engineers The Project refers to the

Design conforming to LEED

Certified Construction January 1987 - December Certification Program and

Project Manager General 1989 Construction of Reinforced

Building Works, No. Project Engineer cum Concrete ADB Multistory

GBMO125R Construction Structural Engineer (6-Levels) Carpark with

Manpower Dev. Foundation, Build Erect Corporation, a

Philippines Philippines total floor area of about

12,150 sq. m. It includes

Architectural Works, Civil

PROFESSIONAL EXPERIENCE January 1986 - January 1987 Works, and MEPS Works with

12- Persons Capacity

Project Engr. cum Struct'l. Passenger Elevator,

August 2011 - January 2012 Engr., Eng'g. Dept. Toilets, Driver's Quarter,

Philippine Refining and SARS Office/Clinic.

Project-In-Charge, Corporation, Philippines

Construction Operations,

Makati Development Manila Water Company, Inc.

Corporation, Philippines January 1985 - December Siruna Site Development &

1985 Satellite Office/Warehouse

Project Engineer

September 2010 - May 2011 Integral Techno System (Design and Construction),

Construction Inc, Phil. Siruna, Antipolo,

Resident Engineer, Project Philippines, Yr. 2010, PHP

Management Group, TCGI 45 M

Engineers, Philippines December 1982 - January

1985 Brief Project Description

Project Engineer

January 2010 - July 2010 Manila Ceramics Mktg. &

Const. Corp., Phils. The Project refers to the

Project Manager, JACA Design and Construction

Construction and for 2-Hectares Civil

Management Corporation, August 1980 - March 1982 Works/Site Development and

Dasmarinas, Cavite Senior Project Inspector mixed Reinforced Concrete

Philippines Engineering & Const. Corp. and Structural Steel

of Asia,Philippines Framed Office/Warehouse

(804 Sq. M.) with

November 2005 - February Mezzanine Floor, to

2009 March 1979 - August 1980 include complete

Resident Engineer, Civil & Civil Engineer cum Architectural Works and

Structural Division Materials Engineers MEPS Works complete with

Meinhardt (Singapore) Pte. Industrial Inspection PCCP/Road Network,

Ltd., Dubai Branch International, Inc., Phils. Drainage System, Slope

Access Ramp / Road and Protection, Exterior Fire

provision of Protection System, Land

Ground Water Dewatering Scaping, and provision of

System. KEY PROJECTS Standard MWCI Perimeter

Fence.

Duties and

Responsibilities Fairview Terraces (Ayala

Mall Project) The Lagoons - Area 2

Tasked to provide (Construction Supervision Enabling Works (Civil

construction management & Management) Structural Works

and supervision work to Fairview, Quezon City, Construction Management

include review of Philippines, Yr. 2011 & Supervision

Contractor's Construction PHP 3.4 B Consultant)

Schedule, monitors Dubai, United Arab

Progress of Works, Brief Project Description Emirates, Yr. 2007,

Conducts Site Inspection, AED 100.6 M

Prepares Progress Report, The Project refers to the

Monitors Contractor's Construction of Mixed-use Brief Project Description

Quality Assurance and Reinforced Concrete

Control and Implementation Building Structures on 5.8

of Safety Program, Review Hectares Land Area The Project refers to the

Contractor's Shop Drawings Development consisting of construction of Shoring

and Technical Submittals, 5-Levels (98,000 Contiguous Bored Piles and

Issue Site Instructions, Duties and Responsibilities Main Building Bored Piles

Engineer's Instruction and for six (6) Plots to

Raise NCR's for include Bulk Excavation

Non-Complying Works, Tasked to closely monitor and Structural Pits

Evaluates Payments for and provide services & Excavation Works and

Progress Billings, Reports maintenance works to all construction of

to the CRE and performs camp facilities, equipment, Brief Project Description

other duties and functions sludge disposal, power,

as the need arises. water supply, client's

office supply, and manpower The Construction of

accommodation. high-end, reinforced

The Dubai Mall (Civil Evaluate actual condition concrete high-rise

Structural Works of and recommends residential building

Construction additional facilities to consisting of 185

Supervision augment existing ones. Residential Units. The

Consultant) Prepares schedules for all project includes complete

Dubai, United Arab maintenance works, manpower MEPS works, architectural

Emirates, Yr. 2005, requirement and materials. finishes such as exterior

AED 2.7 B Prepares monthly cladding and curtain wall

maintenance works budgetary with amenities such as

Brief Project Description expenditures. lagoon shaped swimming

Coordinates with and pool with added water

The Project refers to a 10 provide assistance to the features, high-speed

- Levels Commercial Construction Manager during lifts, sports facilities,

Building with complete construction of additional podium, helipad and

MEPS and Architectural camp facilities. basements parking areas.

Works. The building is a Reports to the

combination of reinforced Officer-in-Charge of Duties and

concrete, pre-stressed Security & Operations for Responsibilities

concrete and structural the implementation of Iraq

steel structures with the Currency Exchange Program. Supervises project

entire superstructures Reports directly to the Sr. construction, to include

resting on bored piles. Camp Manager review of Main

The Project is a portion Performs other duties as Contractor's Construction

of the One Square needed. Schedule, conduct

Kilometer Burj Dubai Meetings, evaluating

Development by Emaar Accomplishments, conduct

Properties. Moog Controls Inspection, Evaluating

Corporation Philippines proposed Change Orders and

Duties and Industrial Building claims for Time Extension

Responsibilities requests, Monitor Progress

(Construction Management of Works, Evaluates &

Tasked to conduct C & S Services) Recommends payment for

Works Inspection daily in Baguio City, Phils., Yr. Progress Billings, Quality

coordination with Main 2002, PHP 45 M Control and Assurance,

Contractor's (JV) QA/QC Safety, attending to

Engineer and/or Inspector Brief Project Description personnel matters.

to ensure compliance with Exercises supervision of

Contract Specifications, The Project refers to the the project including

approved Construction construction of a precision non-technical aspects of

and/or Shop Drawings, Industrial Building the project.

Review Shop Drawings designed as combination of Reports directly to the

submittals, Coordinates reinforced concrete and Project Manager.

with Designers regarding structural steel structures Performs other duties that

design issues and with its superstructures may be required to render

implementation, Monitor founded on Engineered Fill. as the need arises.

Contractor's concrete The project includes

casting activities, complete MEPS works and

Recommends issuance of architectural finishes. Jollibee Plaza

NCR's and/or SDR's due to Building ( 33 -

drawings and/or contract Duties and Responsibilities Storey,

specifications violations, 6 - Basement Levels

Inspect and monitors Offices Condo )

approved repair works and Contract Documentation, to (Construction Management

remedial measures, Assists include preparing Services)

and reports directly to Instruction to Bidders, Ortigas, Philippines, Yr.

the SRE in overseeing C & organizing Conditions of 1999, PHP 950 M

S Works construction Contracts, General

supervision, Performs Conditions, Special Brief Project Description

other related duties as Conditions and General

directed. Requirements. The Project refers to the

Conduct Biddings, to construction of Reinforced

include packaging Concrete Offices Condo

Iraq - Camp Fiji Construction Contracts, units. The project

Maintenance Work Project Pre-Qualification of includes complete MEPS

(Life Support), Mosul, Bidders, inviting works and Architectural

Iraq, Yr. 2003, Pre-Qualified Bidders, works to include Exterior

USD 0.75 M issuing Bid Documents, Granite & Aluminum

conduct Pre-Bid Conference, cladding, Curtain wall,

Brief Project Description receiving & evaluating high and low zone

Bids, recommending Awards. high-speed elevators,

Supervises project helipad and provision of 6

The Project aims to construction, to include Basement levels parking

provide management of preparing Construction areas.

maintenance works and Schedule, conduct Meetings,

requirements of camp Life evaluating accomplishments, Duties and

Support existing and conduct Inspection, Responsibilities

additional facilities to evaluating Change Orders &

support the entire Time Extension, monitor Supervises project

duration of Iraq Currency Progress of works, construction, to include

Exchange Program Evaluates & Recommends review of General

implementation. payment for Progress Contractor's Construction

Billings, Quality Control Schedule.

All Asia Capital Center and Assurance, Safety, Conducts Weekly

Building ( 17-Storey, attending to personnel Construction Coordination

1 - Basement Level matters. Meetings.

Offices Condo ) Performs other duties as Evaluates Accomplishments,

(Construction Management the need arises. conducts Inspection,

Services) evaluating Change Orders

Makati City, Philippines, and Time Extension

Yr. 1995, One Roxas Triangle ( Requests.

PHP 200 M 55 - Storey, Monitors Progress of

3 - Basement Levels Works, Evaluates &

Brief Project Description Residential Building ) recommends Payments for

(Construction Management Progress Billings.

Services) Quality Assurance and

The Project refers to Makati City, Control, Monitors

Construction of 17 floor Philippines., Yr. 2001, Contractor's

levels reinforced concrete PHP 3.6 B implementation of Safety

offices condo units. It Program.

includes complete MEPS Exercises supervision of

works, architectural Meetings and Pre-Bid the project including

finishes such as combined Conference. non-technical aspects of

exterior pre-cast concrete Advice the Resident the Project.

cladding and curtain wall. Engineer on site with Performs other duties and

The building is provided regards to the proper functions as the need

with passenger and construction supervision arises.

executive high-speed and quality control of the

lifts, helipad and Works in accordance with

basement parking areas. the Contract Documents. of the project including

Conducts Site Inspection non-technical aspects of

Duties and and prepare Reports, the project.

Responsibilities Evaluation and Reports directly to the

Recommendations. Project Manager.

Supervises project Performs other functions

construction, to include as the need arises.

review of General Garment Factory (

Contractor's Construction Civil-Structural-Arch'l. ) Thirty Units Mass

Schedule, conduct (Detailed Engineering & Housing Project

Meetings, evaluate Project Supervision) ( Civil-Structural

accomplishments, Manila, Philippines, Yr. Project Supervision )

conduct Inspection, 1987, PHP 10.50 M Bulacan, Philippines, Yr.

evaluating Change 1983, PHP 12 M

Orders and Time Extension Brief Project Description

Requests, monitor Progress Brief Project Description

of Works, evaluate &

recommend payment for The Project refers to the

Progress Billings, Quality design and construction of The project refers to the

Assurance and Control, reinforced concrete and construction of 30-Units

Monitor Contractor's structural steel structures Reinforced Concrete

implementation of Safety for 3,800 sq. m. floor area structure mass housing on

Program. Garment Factory to include rolling terrain. The

Exercises supervision of complete Architectural Project includes provision

the project including Works. for Civil Works,

non-technical aspects of Electrical and Mechanical

the project. Duties and Responsibilities Works, to include

Performs other duties and Architectural finishes.

functions as the need

arises. Provide Detailed Duties and

Engineering Design for Responsibilities

Civil & Structural Works of

U.S. Agency for the Project. Supervises overall

International Development Supervises project construction activities to

USAID - ESFS construction, to include ensure compliance with

Infra-Structures Project preparing Construction approved construction

(School Buildings, Public Schedule, Manpower, plans and specifications

Markets & Roads) Equipment and Materials in accordance with

(In-House Consultant Schedule, conduct Meetings, contract agreement.

Services) evaluating accomplishments, Prepare program of works,

Mindanao,Philippines,Yr. conduct Inspection, scheduling, planning and

1993, PHP 300 M prepares cost proposals for cost estimates.

potential Change Orders & Initiate claims to

Brief Project Description Time Extension, monitor include Time Extension

Progress of works, request and potential

prepare Monthly Progress Change Order proposals.

The Infra-Structures Billings, monitor Quality Conduct daily routine

Project refers to the Control and Assurance, inspection and monitor

construction of Public Safety, attending to progress of works

School Buildings, Public personnel matters. according to project

Markets and Roads as Exercise overall schedule.

funded by the U.S. Agency construction supervision of Prepare monthly Progress

for International the project including Billings, implement QA/QC

Development and non-technical aspects of program and Safety.

implemented by Government the project. Attend Pre-bid conference

of the Philippines. Performs other duties and representing the Company.

functions related to nature Prepare and submits

Duties and of works. Pre-qualification and Bid

Responsibilities Documents.

Performs other duties as

Provide advice, guidance Bureau of Telecoms needed.

and assistance in the Administration Bldg.

review of Construction ( Civil-Structural

Schedule and Cost Project Supervision ) Tongonan Geothermal

Estimates, and assists in San Fernando, La Union, Development Project

the Philippines Civil-Structural Works /

preparation of Approved Yr. 1985, PHP 5.5 M Pipeline Package

Agency Estimate and (Project Inspection

Approved Government Brief Project Description Services)

Estimates required in the Leyte, Philippines, Yr.

bidding of construction 1980, USD 64 M

Contracts. The Project refers to the

Assists in Contract construction of 1-Storey Brief Project Description

Administration to include reinforced concrete office

pre-qualification of building. It also includes

Contractors, Bidding and Civil works, complete MEPS The Project refers to

Evaluation of Bids and and Architectural works. Civil-Structural works and

Awards. Pipeline system of

Evaluates and recommends Duties and Responsibilities Tongonan Geothermal Power

Time Extension proposals, Development. It also

cost proposal for includes the Civil Works

Variation Orders in Supervises project component in the

accordance with the construction, to include construction of

provisions in P.D. 1594. preparing Construction Steam-Water Separator

Participate in the Schedule, Manpower, Plant.

Pre-Construction Equipment and Materials

Prepares Accomplishment Schedule, conduct Meetings, Duties and

Report and reports evaluating accomplishments, Responsibilities

directly to the Consultant conduct Inspection,

Supervision Project prepares cost proposals for Supervises, monitor and

Manager. potential Change Orders & conduct Civil-Structural

Performs other functions Time Extension, monitor works inspection of

as the need arises. Progress of works, prepare pipeline foundation

Monthly Progress Billings, excavation, rebar bending,

monitor Quality Control and cutting and installation

National Power Corporation Assurance, Safety, work, formwork, concrete

Transmission Line attending to personnel casting activities, to

Towers matters. ensure compliance to

(Sub-Surface Soil Exercise overall approved method

Investigation ), construction supervision statements, plans and

Bukidnon, Philippines, Yr. Contract Specifications.

1979, PHP 1.0 M Recommends various

Materials Testing

Brief Project Description requirements in accordance

with contract

specifications.

The project aims to Provide Non-Destructive

conduct Sub-Surface Soil Tests such as Radiographic

Investigation for 300 and Ultrasonic testing and

Transmission Line Steel Welding Inspection

Towers, representing services.

Bukidnon-Misamis Oriental

transmission grid.

Duties and

Responsibilities

Supervises overall

sub-surface soil

investigation by rotary

and/or manual drilling.

Prepares materials

sampling and field

materials description.

Prepares and submits

boring logs, materials

evaluation and testing.

Conducts laboratory

materials testing and

evaluation, and prepare

Test Results. .

Prepares and submit

Accomplishment Report and

perform other duties and

functions related to

nature of work.

Reports directly to the

Chief Materials Engineer.

OTHER PROJECTS

Redesign of Water Supply

System for Grand

Centennial Homes

(Detailed Engineering)

Kawit, Cavite,

Philippines, Yr. 2003

Nestle Philippines Loading

Bay Structural

Modification, Lightning

Protection System,

Comprehensive Short

Circuit Analysis

(Detailed Engineering)

Cabuyao, Laguna,

Philippines, Yr. 2002

Rehabilitation of 150-Ft.

Self Supporting

Communication Steel Tower

for First Philippine

Industrial Corporation

(Project Supervision)

Lipa City, Philippines,

Yr. 1981



Contact this candidate