1990
Master in Engineering -
Structural sq.m. CFA) Mall / Retail &
(Academic Requirements October 2003 - November Cinema Areas with
Completed) 2003 10-Levels BPO, 5-Levels
Pamantasan Ng Lungsod Ng Camp Maintenance Manager, (27,000 sq.m. CFA) Parking
Maynila Life Support Proj. Areas, provided with
Manila, Philippines Custer Battles LLC, Iraq Perimeter Service Road,
complete with Civil Site
Works, Architectural &
1978 March 1994 - October 2003 Landscape Works, MEPS
Bachelor of Science in Project Manager cum Works and provision for
Civil Engineering Resident Engineer, STP and Cistern.
(Graduated) Project Management Group,
Adamson University TCGI Engineers, Philippines
Manila, Philippines Asian Development Bank
Multistory Carpark
PROFESSIONAL AFFILIATIONS (Design & Construction
December 1989 - August 1993 Management Services)
Registered Civil Engineer, Manadaluyong City,
No. 22419 Resident Engineer cum Cost Philippines, Yr.2010
Professional Regulation Engineer, PHP 147 M
Commission, Philippines Project Management Group &
Cost Engineering Group, Brief Project Description
Member, Philippine TCGI Engineers, Philippines
Institute of Civil
Engineers The Project refers to the
Design conforming to LEED
Certified Construction January 1987 - December Certification Program and
Project Manager General 1989 Construction of Reinforced
Building Works, No. Project Engineer cum Concrete ADB Multistory
GBMO125R Construction Structural Engineer (6-Levels) Carpark with
Manpower Dev. Foundation, Build Erect Corporation, a
Philippines Philippines total floor area of about
12,150 sq. m. It includes
Architectural Works, Civil
PROFESSIONAL EXPERIENCE January 1986 - January 1987 Works, and MEPS Works with
12- Persons Capacity
Project Engr. cum Struct'l. Passenger Elevator,
August 2011 - January 2012 Engr., Eng'g. Dept. Toilets, Driver's Quarter,
Philippine Refining and SARS Office/Clinic.
Project-In-Charge, Corporation, Philippines
Construction Operations,
Makati Development Manila Water Company, Inc.
Corporation, Philippines January 1985 - December Siruna Site Development &
1985 Satellite Office/Warehouse
Project Engineer
September 2010 - May 2011 Integral Techno System (Design and Construction),
Construction Inc, Phil. Siruna, Antipolo,
Resident Engineer, Project Philippines, Yr. 2010, PHP
Management Group, TCGI 45 M
Engineers, Philippines December 1982 - January
1985 Brief Project Description
Project Engineer
January 2010 - July 2010 Manila Ceramics Mktg. &
Const. Corp., Phils. The Project refers to the
Project Manager, JACA Design and Construction
Construction and for 2-Hectares Civil
Management Corporation, August 1980 - March 1982 Works/Site Development and
Dasmarinas, Cavite Senior Project Inspector mixed Reinforced Concrete
Philippines Engineering & Const. Corp. and Structural Steel
of Asia,Philippines Framed Office/Warehouse
(804 Sq. M.) with
November 2005 - February Mezzanine Floor, to
2009 March 1979 - August 1980 include complete
Resident Engineer, Civil & Civil Engineer cum Architectural Works and
Structural Division Materials Engineers MEPS Works complete with
Meinhardt (Singapore) Pte. Industrial Inspection PCCP/Road Network,
Ltd., Dubai Branch International, Inc., Phils. Drainage System, Slope
Access Ramp / Road and Protection, Exterior Fire
provision of Protection System, Land
Ground Water Dewatering Scaping, and provision of
System. KEY PROJECTS Standard MWCI Perimeter
Fence.
Duties and
Responsibilities Fairview Terraces (Ayala
Mall Project) The Lagoons - Area 2
Tasked to provide (Construction Supervision Enabling Works (Civil
construction management & Management) Structural Works
and supervision work to Fairview, Quezon City, Construction Management
include review of Philippines, Yr. 2011 & Supervision
Contractor's Construction PHP 3.4 B Consultant)
Schedule, monitors Dubai, United Arab
Progress of Works, Brief Project Description Emirates, Yr. 2007,
Conducts Site Inspection, AED 100.6 M
Prepares Progress Report, The Project refers to the
Monitors Contractor's Construction of Mixed-use Brief Project Description
Quality Assurance and Reinforced Concrete
Control and Implementation Building Structures on 5.8
of Safety Program, Review Hectares Land Area The Project refers to the
Contractor's Shop Drawings Development consisting of construction of Shoring
and Technical Submittals, 5-Levels (98,000 Contiguous Bored Piles and
Issue Site Instructions, Duties and Responsibilities Main Building Bored Piles
Engineer's Instruction and for six (6) Plots to
Raise NCR's for include Bulk Excavation
Non-Complying Works, Tasked to closely monitor and Structural Pits
Evaluates Payments for and provide services & Excavation Works and
Progress Billings, Reports maintenance works to all construction of
to the CRE and performs camp facilities, equipment, Brief Project Description
other duties and functions sludge disposal, power,
as the need arises. water supply, client's
office supply, and manpower The Construction of
accommodation. high-end, reinforced
The Dubai Mall (Civil Evaluate actual condition concrete high-rise
Structural Works of and recommends residential building
Construction additional facilities to consisting of 185
Supervision augment existing ones. Residential Units. The
Consultant) Prepares schedules for all project includes complete
Dubai, United Arab maintenance works, manpower MEPS works, architectural
Emirates, Yr. 2005, requirement and materials. finishes such as exterior
AED 2.7 B Prepares monthly cladding and curtain wall
maintenance works budgetary with amenities such as
Brief Project Description expenditures. lagoon shaped swimming
Coordinates with and pool with added water
The Project refers to a 10 provide assistance to the features, high-speed
- Levels Commercial Construction Manager during lifts, sports facilities,
Building with complete construction of additional podium, helipad and
MEPS and Architectural camp facilities. basements parking areas.
Works. The building is a Reports to the
combination of reinforced Officer-in-Charge of Duties and
concrete, pre-stressed Security & Operations for Responsibilities
concrete and structural the implementation of Iraq
steel structures with the Currency Exchange Program. Supervises project
entire superstructures Reports directly to the Sr. construction, to include
resting on bored piles. Camp Manager review of Main
The Project is a portion Performs other duties as Contractor's Construction
of the One Square needed. Schedule, conduct
Kilometer Burj Dubai Meetings, evaluating
Development by Emaar Accomplishments, conduct
Properties. Moog Controls Inspection, Evaluating
Corporation Philippines proposed Change Orders and
Duties and Industrial Building claims for Time Extension
Responsibilities requests, Monitor Progress
(Construction Management of Works, Evaluates &
Tasked to conduct C & S Services) Recommends payment for
Works Inspection daily in Baguio City, Phils., Yr. Progress Billings, Quality
coordination with Main 2002, PHP 45 M Control and Assurance,
Contractor's (JV) QA/QC Safety, attending to
Engineer and/or Inspector Brief Project Description personnel matters.
to ensure compliance with Exercises supervision of
Contract Specifications, The Project refers to the the project including
approved Construction construction of a precision non-technical aspects of
and/or Shop Drawings, Industrial Building the project.
Review Shop Drawings designed as combination of Reports directly to the
submittals, Coordinates reinforced concrete and Project Manager.
with Designers regarding structural steel structures Performs other duties that
design issues and with its superstructures may be required to render
implementation, Monitor founded on Engineered Fill. as the need arises.
Contractor's concrete The project includes
casting activities, complete MEPS works and
Recommends issuance of architectural finishes. Jollibee Plaza
NCR's and/or SDR's due to Building ( 33 -
drawings and/or contract Duties and Responsibilities Storey,
specifications violations, 6 - Basement Levels
Inspect and monitors Offices Condo )
approved repair works and Contract Documentation, to (Construction Management
remedial measures, Assists include preparing Services)
and reports directly to Instruction to Bidders, Ortigas, Philippines, Yr.
the SRE in overseeing C & organizing Conditions of 1999, PHP 950 M
S Works construction Contracts, General
supervision, Performs Conditions, Special Brief Project Description
other related duties as Conditions and General
directed. Requirements. The Project refers to the
Conduct Biddings, to construction of Reinforced
include packaging Concrete Offices Condo
Iraq - Camp Fiji Construction Contracts, units. The project
Maintenance Work Project Pre-Qualification of includes complete MEPS
(Life Support), Mosul, Bidders, inviting works and Architectural
Iraq, Yr. 2003, Pre-Qualified Bidders, works to include Exterior
USD 0.75 M issuing Bid Documents, Granite & Aluminum
conduct Pre-Bid Conference, cladding, Curtain wall,
Brief Project Description receiving & evaluating high and low zone
Bids, recommending Awards. high-speed elevators,
Supervises project helipad and provision of 6
The Project aims to construction, to include Basement levels parking
provide management of preparing Construction areas.
maintenance works and Schedule, conduct Meetings,
requirements of camp Life evaluating accomplishments, Duties and
Support existing and conduct Inspection, Responsibilities
additional facilities to evaluating Change Orders &
support the entire Time Extension, monitor Supervises project
duration of Iraq Currency Progress of works, construction, to include
Exchange Program Evaluates & Recommends review of General
implementation. payment for Progress Contractor's Construction
Billings, Quality Control Schedule.
All Asia Capital Center and Assurance, Safety, Conducts Weekly
Building ( 17-Storey, attending to personnel Construction Coordination
1 - Basement Level matters. Meetings.
Offices Condo ) Performs other duties as Evaluates Accomplishments,
(Construction Management the need arises. conducts Inspection,
Services) evaluating Change Orders
Makati City, Philippines, and Time Extension
Yr. 1995, One Roxas Triangle ( Requests.
PHP 200 M 55 - Storey, Monitors Progress of
3 - Basement Levels Works, Evaluates &
Brief Project Description Residential Building ) recommends Payments for
(Construction Management Progress Billings.
Services) Quality Assurance and
The Project refers to Makati City, Control, Monitors
Construction of 17 floor Philippines., Yr. 2001, Contractor's
levels reinforced concrete PHP 3.6 B implementation of Safety
offices condo units. It Program.
includes complete MEPS Exercises supervision of
works, architectural Meetings and Pre-Bid the project including
finishes such as combined Conference. non-technical aspects of
exterior pre-cast concrete Advice the Resident the Project.
cladding and curtain wall. Engineer on site with Performs other duties and
The building is provided regards to the proper functions as the need
with passenger and construction supervision arises.
executive high-speed and quality control of the
lifts, helipad and Works in accordance with
basement parking areas. the Contract Documents. of the project including
Conducts Site Inspection non-technical aspects of
Duties and and prepare Reports, the project.
Responsibilities Evaluation and Reports directly to the
Recommendations. Project Manager.
Supervises project Performs other functions
construction, to include as the need arises.
review of General Garment Factory (
Contractor's Construction Civil-Structural-Arch'l. ) Thirty Units Mass
Schedule, conduct (Detailed Engineering & Housing Project
Meetings, evaluate Project Supervision) ( Civil-Structural
accomplishments, Manila, Philippines, Yr. Project Supervision )
conduct Inspection, 1987, PHP 10.50 M Bulacan, Philippines, Yr.
evaluating Change 1983, PHP 12 M
Orders and Time Extension Brief Project Description
Requests, monitor Progress Brief Project Description
of Works, evaluate &
recommend payment for The Project refers to the
Progress Billings, Quality design and construction of The project refers to the
Assurance and Control, reinforced concrete and construction of 30-Units
Monitor Contractor's structural steel structures Reinforced Concrete
implementation of Safety for 3,800 sq. m. floor area structure mass housing on
Program. Garment Factory to include rolling terrain. The
Exercises supervision of complete Architectural Project includes provision
the project including Works. for Civil Works,
non-technical aspects of Electrical and Mechanical
the project. Duties and Responsibilities Works, to include
Performs other duties and Architectural finishes.
functions as the need
arises. Provide Detailed Duties and
Engineering Design for Responsibilities
Civil & Structural Works of
U.S. Agency for the Project. Supervises overall
International Development Supervises project construction activities to
USAID - ESFS construction, to include ensure compliance with
Infra-Structures Project preparing Construction approved construction
(School Buildings, Public Schedule, Manpower, plans and specifications
Markets & Roads) Equipment and Materials in accordance with
(In-House Consultant Schedule, conduct Meetings, contract agreement.
Services) evaluating accomplishments, Prepare program of works,
Mindanao,Philippines,Yr. conduct Inspection, scheduling, planning and
1993, PHP 300 M prepares cost proposals for cost estimates.
potential Change Orders & Initiate claims to
Brief Project Description Time Extension, monitor include Time Extension
Progress of works, request and potential
prepare Monthly Progress Change Order proposals.
The Infra-Structures Billings, monitor Quality Conduct daily routine
Project refers to the Control and Assurance, inspection and monitor
construction of Public Safety, attending to progress of works
School Buildings, Public personnel matters. according to project
Markets and Roads as Exercise overall schedule.
funded by the U.S. Agency construction supervision of Prepare monthly Progress
for International the project including Billings, implement QA/QC
Development and non-technical aspects of program and Safety.
implemented by Government the project. Attend Pre-bid conference
of the Philippines. Performs other duties and representing the Company.
functions related to nature Prepare and submits
Duties and of works. Pre-qualification and Bid
Responsibilities Documents.
Performs other duties as
Provide advice, guidance Bureau of Telecoms needed.
and assistance in the Administration Bldg.
review of Construction ( Civil-Structural
Schedule and Cost Project Supervision ) Tongonan Geothermal
Estimates, and assists in San Fernando, La Union, Development Project
the Philippines Civil-Structural Works /
preparation of Approved Yr. 1985, PHP 5.5 M Pipeline Package
Agency Estimate and (Project Inspection
Approved Government Brief Project Description Services)
Estimates required in the Leyte, Philippines, Yr.
bidding of construction 1980, USD 64 M
Contracts. The Project refers to the
Assists in Contract construction of 1-Storey Brief Project Description
Administration to include reinforced concrete office
pre-qualification of building. It also includes
Contractors, Bidding and Civil works, complete MEPS The Project refers to
Evaluation of Bids and and Architectural works. Civil-Structural works and
Awards. Pipeline system of
Evaluates and recommends Duties and Responsibilities Tongonan Geothermal Power
Time Extension proposals, Development. It also
cost proposal for includes the Civil Works
Variation Orders in Supervises project component in the
accordance with the construction, to include construction of
provisions in P.D. 1594. preparing Construction Steam-Water Separator
Participate in the Schedule, Manpower, Plant.
Pre-Construction Equipment and Materials
Prepares Accomplishment Schedule, conduct Meetings, Duties and
Report and reports evaluating accomplishments, Responsibilities
directly to the Consultant conduct Inspection,
Supervision Project prepares cost proposals for Supervises, monitor and
Manager. potential Change Orders & conduct Civil-Structural
Performs other functions Time Extension, monitor works inspection of
as the need arises. Progress of works, prepare pipeline foundation
Monthly Progress Billings, excavation, rebar bending,
monitor Quality Control and cutting and installation
National Power Corporation Assurance, Safety, work, formwork, concrete
Transmission Line attending to personnel casting activities, to
Towers matters. ensure compliance to
(Sub-Surface Soil Exercise overall approved method
Investigation ), construction supervision statements, plans and
Bukidnon, Philippines, Yr. Contract Specifications.
1979, PHP 1.0 M Recommends various
Materials Testing
Brief Project Description requirements in accordance
with contract
specifications.
The project aims to Provide Non-Destructive
conduct Sub-Surface Soil Tests such as Radiographic
Investigation for 300 and Ultrasonic testing and
Transmission Line Steel Welding Inspection
Towers, representing services.
Bukidnon-Misamis Oriental
transmission grid.
Duties and
Responsibilities
Supervises overall
sub-surface soil
investigation by rotary
and/or manual drilling.
Prepares materials
sampling and field
materials description.
Prepares and submits
boring logs, materials
evaluation and testing.
Conducts laboratory
materials testing and
evaluation, and prepare
Test Results. .
Prepares and submit
Accomplishment Report and
perform other duties and
functions related to
nature of work.
Reports directly to the
Chief Materials Engineer.
OTHER PROJECTS
Redesign of Water Supply
System for Grand
Centennial Homes
(Detailed Engineering)
Kawit, Cavite,
Philippines, Yr. 2003
Nestle Philippines Loading
Bay Structural
Modification, Lightning
Protection System,
Comprehensive Short
Circuit Analysis
(Detailed Engineering)
Cabuyao, Laguna,
Philippines, Yr. 2002
Rehabilitation of 150-Ft.
Self Supporting
Communication Steel Tower
for First Philippine
Industrial Corporation
(Project Supervision)
Lipa City, Philippines,
Yr. 1981