Resume:

Roger Dawkins

Sr. Designer

**** ****** ****** **********, ** 98229

Phone:360-***-**** Cell:360-***-****

E-mail: abnwwe@r.postjobfree.com

Professional Credentials

Over 16 years of designing/drafting experience including producing piping,structural and

mechanical drawings for multiple applications. Lead designer for several simultaneously running

small projects as part of Small Project Alliance w/ ConocoPhillips. Directed junior drafters and

assigned work for them. Involved with conceptual front-end design development. Numerous

field trips to client location for field measurements, verifications and walk-downs. Responsible

for checking P&ID’s, ISO’s, line lists, tie-in lists. Proven abilities in AutoCAD for various

engineering disciplines and applications including, but not limited to: Petro-Chemical Industry;

Plant Layout; Food Industry; Material Handling; Sheet metal fabrication. Possess above average

math skills as well as computer skills including; MS Windows; Word; Excel; access and

Microsoft Outlook. Also experienced with various AutoCAD compatible programs (Rebis

AutoPlant; Bentley2004; Isogen; NavisWorks CADworks etc). An excellent team worker with an

established record of quality performance.

Past/Present Employment

CH2MHill (VECO USA), Bellingham, WA.

03/2002–12/2002; 02/2003-06/2003; 07/2004 - 03/2009

Sr. Piping Designer; 3-D Modeler; Checker

Lead designer for several simultaneously running small projects as part of Small Project Alliance

w/ ConocoPhillips. Directed junior drafters and assigned work for them. Responsible for design

development, front-end design and detail design as well as estimating FEL-1, 2, 3 and Detail

Design Man Hours and MTO. Involved with conceptual front-end design development.

Numerous field trips to client location for field measurements, verifications and walk-downs.

Served as on-site project support liaison. Responsible for designing, modifying, checking and

finalizing piping drawings. Made extensive use of paperspace/modelspace working environment.

Prepared and modified project general arrangement drawings. Developed and maintained 3-D

models. Responsible for checking P&ID’s, ISO’s, line lists, tie-in lists, mark-ups and revisions.

Developed isometric drawings Performed all drafting with AutoCAD 2000 - 2008 as well Rebis

Autoplant97/Bentley 2004.

Golden Harvest, Inc., Burlington, WA.

02/2004 – 07/2004

Drafter/Designer; 3-D Modeler/Checker

Responsible for designing, modifying and finalizing water control gate drawings utilizing

AutoCAD. Updated and incorporated new software as well as drafting/design standards.

Instrumental in moving the drafting department forward concerning newer software/design

techniques. Performed basic design and checking of new/existing water control gates. Interfaced

with fabrication/construction managers to ensure quality and maintain delivery dates. Performed

all drafting with AutoCAD 2002 in WindowsXP Professional environment.

Chemithon Corporation, Seattle, WA.

07/2003-12/2003 (contract)

Drafter/Designer

Responsible for the designing, modifying, finalizing piping drawings, skid packages. Developed

and maintained 3-D models. Assisted with P&ID’s: mark-up and revisions Performed all drafting

with AutoCAD 2002 in Windows NT/XP Professional environment.

Bateman-Merrick Group, Merrick & Company, Aurora, CO.

04/2001-03/2002 (contract)

Drafter/Designer

Responsible for designing, modifying, finalizing equipment and piping drawings utilizing

AutoCAD 2000/Rebis Autoplant 97. Prepared and modified piping annotation drawings. Prepared

and modified project general arrangement drawings.Made numerous field trips to client location

for field measurements, verifications and walk-downs. Developed and maintained 3-D models.

P&ID’s: mark-up and revisions/development of isometric drawings.

Pro-Tech Fabricators, Inc., Fort Morgan, CO.

06/1998-04/2001

Lead CAD Technician/Designer

Responsible for all CAD related activities including design/modification of new equipment,

existing equipment, plant layouts, proto-types, communications and interpretations of drawing

related problems. Also responsible for the programming and operation of Laser cutting machine.

Prepared preliminary and detailed drawings/schematics from simple to complex; up to and

including multi view and 3-dimensional drawings/layouts as well as structural drawings.

Developed and implemented drawing file/numbering system to correspond to bid, quote, and

invoice numbers. Advised employer concerning software improvements/upgrades. Expanded

customer base and product lines in conjunction with laser operations. Handled and maintained

customer relations with vendors. Assisted in nearly all phases of fabrications and installations.

Designed a patent-applied-for conveyor system. Re-designed entire Excel Beef pack-off

conveyor system. Responsible for all aspects of Laser Operations: Quoting work; Drawing

conversions (CAD to Laser software); Programming, Operating; General maintenance/upkeep.

Leprino Foods, Ft. Morgan, CO.

01/1992-11/1998

CAD Operator

Responsible for all CAD related activities including design/modification of new processing

equipment; modifications to existing equipment; plant lay-outs; communications between

corporate office and local plant; upgrades and improvements to CAD software/hardware.

Prepared preliminary and detailed drawings for various stages of production processes from new

equipment to plant layout changes/modifications. Developed, implemented, and maintained

drawing file system for entire plant. Prepared cost analysis comparisons to facilitate purchases of

new equipment. Collaborated on the development of a Maintenance Excellence Program to

streamline trouble-shooting and reduce maintenance related downtime. Coordinated planning-to-

installation aspects of equipment modifications and upgrades. Instrumental in 5+ years of

ongoing/constant changes in plant layout; departmental expansions; equipment upgrades and

modifications as well as streamlining maintenance procedures for down-day priorities.

Instrumental in three (3) major expansions of plant including: preliminary lay-outs, detailed

drawings, P&ID drawings, coordinating start-to-finish problem solving, initial and modified lay-

out of new equipment, communications between contractors and on-site personal as well as

corporate engineering department. Developed several equipment design modifications that were

implemented in all Leprino Foods processing plants.

Selected Experience

Boiler feedwater Treatment Replacement Project,

ConocoPhillips, Ferndale, WA. (Sept. 2007 – Feb. 2009)

Lead Piping Designer/Checker

Responsible for design development, front-end design and detail design as well as estimating

FEL-1, 2, 3 and Detail Design Man Hours/MTO including, but not limited to, design of P&ID’s,

equipment layout/location, tie-in locations/list, line lists, inter-connecting pipe, and interface tie-

ins with ISBL contractors. Involved with conceptual front-end design development. Numerous

field trips to client location for field measurements, verifications and walk-downs. Responsible

for checking P&ID’s, ISO’s, line lists, tie-in lists.

PSV Mitigation Project Phase-I,

ConocoPhillips, Ferndale, WA. (Oct. 2007 – Jan 2009)

Lead Piping Designer/Checker

Responsible for design development, front-end design and detail design as well as estimating

FEL-1, 2, 3 and Detail Design Man Hours/MTO including, but not limited to, design of P&ID’s,

equipment layout/location, tie-in locations/list, line lists, inter-connecting pipe, and interface tie-

ins with ISBL contractors. Involved with conceptual front-end design development. Numerous

field trips to client location for field measurements, verifications and walk-downs. Responsible

for checking P&ID’s, ISO’s, line lists, tie-in lists.

Coker OSBL Project,

Sinclair Refining Company, Sinclair, WY. (Jan. 2005 – Sept. 2007)

Piping Designer/Checker

Responsible for design development, front-end design and detail design of P&ID’s, equipment

layout/location, tie-in locations/list, line lists, inter-connecting pipe, and interface tie-ins with

ISBL contractors. Involved with conceptual front-end design development. Numerous field

trips to client location for field measurements/walkdowns. Served as on-site project support

liaison. Responsible for checking P&ID’s, ISO’s, line lists, tie-in lists.

FCCU Heat Recovery,

ConocoPhillips, Borger, TX. (May 2004 – Jan 2005)

Piping Designer

Responsible for design development, front-end design and detail design of P&ID’s, equipment

layout/location, tie-in locations/list, line lists, inter-connecting pipe, interface tie-ins with other

units, extraction of ISO’s using Isogen.

DCU Blowdown,

Shell, Anacortes, WA. (Sept 2003 – May 2004)

Piping Designer

Responsible for the front-end design and detail design of P&ID’s, inter-connecting pipe, pipe

supports and extraction of ISO’s. Updated original piping plans/elevations and tracked documents

through checking/back-drafting/issue to client process.

SNG Plant Upgrade,

The Gas Company, Kalaeloa, HI. (Jan 2004-Mar 2004)

Piping Designer

Responsible for the front-end design of plant upgrade layout, equipment locations, preliminary

piping design, fire water layout proposal, flare location options and associated piping design

modifications for all.

CD3/CD4 Pigging Modules,

ConocoPhillips, AK.

Piping Designer

Responsible for the front-end design and detail design for P&ID’s, pipe support, extracting ISO’s

and field measurements.

MAC II Compliance,

Tesoro, Anacortes, WA.

Piping Designer Responsible for the front-end design and detail design for P&ID’s, pipe

support, extracting ISO’s and field measurements.

Education

AIMS Community College, Greeley, CO.

1- yrs. Completed toward 2-year A.S. degree in mechanical engineering

Completed all drafting requirements Dean’s list two quarters G.P.A. – 3.82.

1990-1992

CAD-1 Training Center 2000

Successfully completed training for upgrade in software (AutoCAD r13 to

AutoCAD 2000i)

Rebis Autoplant 97 Training

Bentley® AutoPLANT Piping 2004 Edition

Certified S.P.E.D. Piping Training Classes



Contact this candidate