Post Job Free

Resume

Sign in

Engineer Sales

Location:
Troy, MI, 48083
Posted:
March 09, 2010

Contact this candidate

Resume:

MARK TULCZYNSKI

**** ******** **, ****, ** *****

abnwq9@r.postjobfree.com

519-***-****, or 248-***-****

CAREER

CAREER SUMMARY

Process/Tooling

Process/Tooling Engineer/Cost Estimator with a long and successful career in metal

Process

stamping/assembly in the automotive industry. Demonstrated ability in metal stamping product

design, processes, manufacturing feasibility, cost estimating and Quality Assurance procedures.

Have a solid background in managing global automotive (and non-automotive) programs including

international tooling expertise and procurements. Strong interface and communication skills with

suppliers, design and manufacturing.

PROFESSIONAL

PROFESSIONAL EXPERIENCE

FAURECIA 2000

2000 - 2008

FAURECIA AUTOMOTIVE SEATING

Tier 1 and 2 automotive supplier of seating and mechanisms: $7 billion sales Troy, Michigan

Tooling Engineer/Cost Estimator:

Tooling Estimator:

Responsible for the definition of metal forming processes for all stampings and new tool

procurement: progressive, transfer methods, roll forming, fineblanking of mechanisms,

robotic welding,

Originated and developed piece price estimating model

Invented and advanced new die build cost model

Implemented Forming Suite to determine developed blanks – delivered over $240 K/year in

steel savings and Fastform Advanced to analyze formability – delivered Engineering

savings estimated at $70K/ year,

Recommendations to Product Engineering on Design for Manufacturability,

Implemented in die automated assembly processes to eliminate off line operations ( clinch

fasteners, in die bushings automated assembly ).

Reviewed supplier estimates for metal components and tooling and participated in supplier

selection.

2000

SKD SALES AND ENGINEERING 1998 – 2000

Tier 1 supplier – Automotive Metal Stampings and Welded Assemblies Troy, Michigan

Project Engineer:

Project Engineer:

Executed project management of major structural assemblies (GMX-radiator supports)

from prototypes to launch

Tool build follow-up, tool tryouts at tooling sources and in house

Promoted and implemented automated in die assembly of clinch fasteners eliminated off-

line operations and delivered savings of $136K annually.

NARM

THE NARMCO GROUP 1995 – 1998

Tier 1 & 2 supplier of automotive stampings and assemblies (2.4 billion sales) Windsor, Ontario

Tooling Engineer:

Tooling Engineer:

Co-ordinated new tool building follow-up, design reviews, tooling approvals and PPAP

submissions (wide range of components: B-pillars, inner doors, oil pans, cross members

etc.)

• Improved and troubleshoot of production dies (VA/VE program reduced cost by 16% but

maintained quality)

• Estimated piece price and new tool build costs

MARK TULCZYNSKI page

pa

page 2

PROFESSIONAL

PROFESSIONAL EXPERIENCE continued

ITT

ITT AUTOMTOIVE, NORTH AMERICA 1987 – 1995

“AIMCO” BRAKE DIVISION Mississauga, Ontario

OEM and aftermarket major supplier of brake shoes ( $1.5 billion in sales)

Tooling Co-ordinator:

Tooling Co-

Accountable for implementing engineering changes, tool modifications for very high volume

production of brake disc plates, webs and bands

Tool and Die vendors liaison

Reduced tool maintenance cost by average of 32% annually through long term agreements

and by reducing supplier base

Added value by developing tool data base and monitoring readiness with Production

Control

Responsible for tool crib with die supplies

1983

WCI Manufacturing Ltd. 1983 – 1987

Major home appliances manufacturing Cambridge, Ontario

Tool Engineer:

Tool Engineer:

gineer

Acquired new tooling from overseas toolmakers and realized savings of $326K in new

tooling (new program washer/dryer)

Accountable for new die build follow-up, tooling approvals and tryouts at toolmakers and in

house,

Experience with roll forming mill operation and roll from tooling (tubing for refrigeration)

Responsible for new automated resistance welding machine implementation (design,

fixturing, cycle times)

UNITRA POLCOLOUR 1976 – 1981

Colour Picture Tube Manufacturing Plant – RCA licensed Warsaw, Poland

Manufacturing Engineer:

Manufacturing

Responsible for the new production start up of colour picture tube manufacturing plant

New tooling reviews, approvals, tryouts and procurement from overseas toolmakers.

EDUCATION

EDUCATION

Master 1975

Master of Science in Mechanical Engineering

Major: Manufacturing Technologies Warsaw, Poland

CONTINUED EDUCATION

CONTINUED EDUCATION AND CERTIFICATIONS

Understanding 2005

Understanding Materials for Stamping

2005

Stamping Estimating

Basic 2006

Basic Formability

Taylor Welded Blanks

Welded lanks 2004

2004

Fastblank – Blank Prediction and Nesting Software

Die Design Certificate, Mohawk College (Hamilton, Ontario) 1992

Certified Quality Technician American Society of Quality Control

Technician, 1991



Contact this candidate