MAHESH DALVI
**** ****** ***** *****, ********, OH 43560
Home 419-***-**** Cell 586-***-**** abnwm3@r.postjobfree.com
SUMMARY
Over 10 years of manufacturing and process experience in production related industries.
Self-Motivated; able to work independently and in teams; handled multiple projects while paying
attention to details. Achieved organizational goals using leadership; project management and
supervisory skills.
Expertise in MODAPTS, AutoCAD 2008, Visio, Microsoft Office (Word, Excel, PowerPoint, Project
and Access).
Good communication and interpersonal skills.
EDUCATION
M.S., Industrial and Management Engineering with emphasis on Manufacturing Systems, and
Quality Control, GPA: 3.41/4.00, Montana State University, Bozeman, Montana, August 1998 – May
2000
B.S., Production Engineering, GPA: 3.5/4.00, University of Bombay, India, June 1989 – June 1993
CERTIFICATIONS
Certified in MODAPTS by International MODAPTS Association.
Certified in Six Sigma Green Belt.
Certified in Lean Manufacturing
Certified in VIA, Productivity Improvement Through Time Study® and VIA, World Class
Manufacturing®
PROFESSIONAL EXPERIENCE
Consultant at Production Modeling Corporation (PMC), Dearborn, MI [April 2009 – Present]
Client : Chrysler (JEEP) - Toledo Supplier Park, Toledo, OH
Role : Team Industrial Engineer / Production Supervisor
Team Size : 4
Description :
Provide production support in the form of Production Supervisor for Door Line Assembly
Assist in preparing for TUV audit by validating standardized work instructions at each job station
across all shifts
Validate sequence of elements in work instructions with actual sequence of work performed and
standardize sequence of operations across all shifts
Develop detailed plans for continuous improvement and validate plans with Team Leaders and
Area Managers
Lead Industrial Engineer at IET Inc., Toledo, Ohio [August 2000 – April 2009]
1. Client : Philip Morris, Richmond, VA
Role : Team Industrial Engineer
Team Size : 4
Description :
Conducted sequential work sampling of the KDF filter making operation to determine the feasibility of
one operator running three machines instead of two machines with new automatic testing equipment
in place
Conducted manning analysis of the KDF filter making operation to justify the purchase of new
automatic bobbin changer and determine the overall impact on productivity
2. Client : Tru Logistics, Fredericksburg, VA
Role : Supply Chain Analyst
Team Size : 2
Description :
Evaluated the existing supply chain network for ‘Therma-Tru’ brand packaged doors to minimize
customer returns, reduce inventory costs and minimize material costs
Worked across regional distribution centers with shipping companies in various locations in United
States to optimize the transportation system resulting in reduced handling of doors
MJD Page 1 of 4
Proposed and implemented new packaging solutions which reduced freight damage and improved
customer service for Tru Logistics and it’s suppliers
Developed and implemented Process FMEA to root cause and control customer returns due to
freight damage, design defects and manufacturing defects
3. Client : Dana Holding Corporation, Lugoff, SC
Role : Time Study Analyst / Lean Manufacturing Engineer
Team Size : 2
Description :
Conducted continuous time studies and analyzed results for final assembly of Traditional and
Hercules brand rear axles for off-highway products
Implemented 5S and lean manufacturing techniques to reduce waste and improved cycle time by
35%
4. Client : Chrysler (JEEP) - Toledo North Assembly Plant, Toledo, OH
Role : Team Industrial Engineer
Team Size : 5
Description :
Developed and implemented detailed productivity improvement plans. Worked closely with all
departments to implement the plans (Required to Run Task). Average productivity improvement
savings per year - $700,000
Performed line balancing and waste removal using current state line observations, moving line
charts, PDCA’s and Yamazumi (Chip) charts. Achieved line balancing target of 95% efficiency and
85% utilization.
Worked with the union to resolve any IE related and production floor issues
Lead team of maintenance, IT, safety, production control, ergonomics, production and union team
leaders / stewards in implementing Work Station Optimization improvements
Provided IE support during pilot run and new model launch for Dodge Nitro and Redesigned Jeep
Liberty
Participated in problem solving teams during launch to resolve part / build issues
Checked station readiness for new model launch
Conducted meetings with Plant Vehicle Engineering Group, Advanced Manufacturing Engineering
Group and Suppliers over Process / Product Changes
Updated Process Sheets and Parts Information in Automated Manufacturing Planning System
Converted all Chrysler Standard Times on man assignments to MODAPTS times. Utilized MODAPTS
studies to balance workstations
Worked with Production Advisors to meet weekly and monthly Station Direct Run Loss (SDRL) goals
Handled day-to-day IE issues on the floor – Responsible for Trim and Door Line
5. Client : GM Powertrain, Romulus, MI
Role : Process Engineer
Team Size : 3
Description :
Designed and implemented gauge tables with color coding resulting in standardized gauging process
for V6 and V8 Block Line machining
The standardized gauge table design was set as benchmark and implemented at other GM facilities
in North America
Updated Process FMEA for 2003 4.3 liter V6 Engine Assembly
Updated layouts using AutoCAD 2000 to accommodate new marine engine production for 2003 4.3
liter V6 Engine Assembly
Developed Job Instructions, Visual Aids and Error Proofing documents for 2003 4.3 liter V6 Engine
Assembly
Conducted Delay Studies and analyzed results in the form of Pareto Charts at V8 Engine Headline
Assembly
6. Client : Stageright Corporation, Clare, MI
Role : Lean Manufacturing Engineer
Team Size : 2
Description :
Provided objective engineering analysis of process and material flow, storage requirements and
lead-time reduction opportunities for the staging and football equipment manufacturer
Documented current and future state process flow using Value Stream Mapping
Proposed one-piece flow of material and Kan-Ban Pull System thereby reducing work-in-process
inventory by 50%
MJD Page 2 of 4
Proposed facility layouts that promoted smooth material flow and efficient space utilization in a Lean
Manufacturing Environment
7. Client : Chemical Specialties Inc., Harrisburg, NC
Role : Material Flow and Layout Engineer
Team Size : 1
Description :
Re-routed overall traffic flow, reviewed scheduling and traffic routes of tanker trailers in and out of
the facility for optimal flow
Designed tanker parking lot and plant layout including tank farm loading/unloading
Conducted material flow analysis to find out daily manning at 8 hours/shift/person
8. Client : Collins and Aikman, Williamston, MI
Role : Methods Engineer
Team Size : 3
Description :
Developed a strategic manufacturing plan for the automotive headrest and armrest supplier, by
analyzing data collected by conducting time studies, work sampling, storage and capacity
analysis
Proposed layouts for possible expansion scenarios using AutoCAD 2000
9. Client : Filcon, Clare, MI
Role : Project Engineer
Team Size : 4
Description :
Analyzed manufacturing operations and developed proposed layouts for the food products packaging
company
Designed manufacturing system to support the anticipated business volume with minimal labor cost
10. Client : American Axle and Manufacturing, Three Rivers, MI
Role : Facilities and Layout Engineer
Team Size : 2
Description :
Implemented Plant Layout Design Project using AutoCAD 2000 for complete manufacturing facility
of 11.5” Rear Axle Machining and Assembly for GM Trucks
Designed new layout considering manpower allocation for 3 shifts, provision for scrap and rework
disposal including chip collection system design, overhead bridge rails, raw materials and WIP space
allocation according to daily volume requirements and office space design
11. Client : Mannesmann VDO, Auburn, Indiana
Role : Time Study Analyst
Team Size : 4
Description :
Conducted Time Studies and Delay Studies and reduced the overall cycle time by 40% for Ford
Motor Company’s Airbag PCB manufacturing facility
Analyzed root cause of individual machine processing time delays and balanced the line thereby
reducing cycle time for bottleneck operation
12. Client : Kraft Foods, Kirksville, MO
Role : Project Engineer
Team Size : 4
Description :
Worked on Continuous Improvement Project involving employee training and tracking equipment
downtime to increase Overall Equipment Effectiveness (OEE)
Design Engineer at Graphic Angles, Mumbai, India [October, 1996-April, 1998]
Team Size : 10
Description :
Analyzed design failures using Design FMEA principles and recommended actions to improve safety
and reliability of HVAC system design for diamond trading facility
Interpreted layouts and superimposed ducting and piping layouts on basic drawing taking into
account all ceiling and floor obstructions involved
MJD Page 3 of 4
Trainee Engineer at Damodar’s El-Mech Services P. Ltd., Mumbai, India [July, 1994-September, 1996]
Team Size : 4
Description :
Supervised daily stores, inventory and production functions of Automotive Repairs Department.
Handled customer issues and actively involved in trouble shooting and implementing corrective
actions.
Process Trainee at The Tata Electric Companies, Mumbai, India [April, 1998–June, 1998]
Team Size : 6
Description :
Monitored fuel consumption patterns in Operations and Plant Betterment Department
Studied fuel consumption patterns for last 5 years and established knowledge base for forecasting
AWARDS AND RECOGNITION
Awarded “MOST DYNAMIC PROJECT TEAM”, IET INC, 2003
Awarded “MOST DYNAMIC PROJECT TEAM”, IET INC, 2006
MJD Page 4 of 4