Visvanathan Srinivasan
**** *. ****** *****, ********* Heights, Il-60005, Phone: 217-***-****
E-mail: abnw7u@r.postjobfree.com
Summary
Dynamic professional with 5 years of experience in manufacturing engineering field seeking a manufacturing engineer
position with a growing organization
Key Skills
Six-sigma green belt, Layout planning, Assembly process development, Injection molding, Statistical Analysis / DOE,
Plan For Every Part (PFEP), Pricing and Estimation, SAP PP implementation, Class 100 clean room experience, Semi-
conductor manufacturing, Team management
Education
M.S. (Manufacturing) 2006 North Dakota State University, Fargo (GPA: 3.50/4.00)
B.E. (Manufacturing) 2003 University of Pune, India (GPA: 3.33/4.00)
Software Skills
• ProE, Solid Works, Moldflow, AutoCAD
• UGS Teamcenter Vis-Mockup, Oracle MRP, IQMS, SAP PP, CAPP+, MCS
• MINITAB, MATLAB, MS Access, Excel programming
Experience
Manufacturing Engineer (Contract), Caterpillar Inc., Decatur IL, USA, January 2008 – February 2009
• Responsible for defining right process, part location, tools and appropriate material handling devices for assembling
existing and new mining machinery (NPI) on the floor
• Designed assembly line layout, supported line setup activities, re-sequenced processes, trained operators to assemble
multiple products on the line (lean tools used: spaghetti chart, line balancing, internal/external activities analysis)
• Facilitated Design for Manufacturability projects by simulating part dimension/clearance, hose/harness routing issues
• Worked on identifying and resolving potential failure modes in assembly processes using PFMEA’s
• Completed six-sigma green belt / supported black belt projects in work standardization, kanban system
implementation, engineering change management and material standardization
• Worked on line balancing and non value added (NVA) activities analysis after conducting floor time studies for
the large mining truck and wheel tractor scraper line (> $2 million in cost savings)
• Created / maintained VSM’s, 5S Audit Sheets, SOPs, and Continuous Improvement boards, participated in Kaizen
• Worked on programming, installation and testing of the control system for pressure testing finished products
• Led a 5 member team involved in documenting standard operating procedures, BOM, and visual work instructions
• Defined requirements and validation / qualification procedures for material handling equipment and torque tools
• Attained expertise with using UGS Team-center Vis-mockup, HVC, MCS and CAPP+ applications
Manufacturing Engineer, Plastic Products Co., Minneapolis MN, USA, December 2006 - January 2008
• Worked with tooling engineers / automation equipment engineers to design production cells for new molding
projects worth up to $8 million annually
• Prepared production plans and SOPs for injection molding projects and presented snapshots to VP Operations
• Responsible for collecting data and analyzing the Overall Equipment Efficiency (OEE), scrap, delivery
rating/performance to customer, manufacturing attendance / turnover, preventive maintenance log
• Installed an automated loading/unloading rotary indexing fixture for assembly of injection molded components
• Performed part producibility studies using Moldflow (Solidworks) to test tooling and processing configurations
• Conducted PPAP trials for qualifying the molding process and communicated trial documentation to customers
• Justified procurement of capital injection molding / decoration equipment by applying cost-benefit analysis
• Designed error-proof part mounting fixtures, supported TS16949 certification and IQMS ERP system
implementation activities
• Analyzed blueprints and RFQ’s to prepare cost, materials, time and labor estimates for plastic injection molding
• Worked with Purchasing to optimize plastic material / packaging procurement costs and inventory levels
• Worked on in-house machining of P20 steel molds using Haas, Mazak MC’s and documented process sheets / times
• Underwent Paulson Injection Molding Training
Quality Intern, Bobcat Co., Bismarck ND, USA, January 2006 – August 2006
Visvanathan Srinivasan
1807 S. Surrey Ridge, Arlington Heights, Il-60005, Phone: 217-***-****
E-mail: abnw7u@r.postjobfree.com
• Dealt with suppliers (tier 1 and key tier 2 and beyond suppliers) for resolution of non-conforming material
generated from line through the issuing, processing, and debiting of all supplier defects in Oracle MRP
• Ensuring suppliers meet customer requirements; using the supplier rating system to drive continuous improvement
• Background in corrective actions(8-D’s/ 7 steps/5 phase),GD&T, blueprint reading, ISO and SPC
• Standardized packaging for all supplied parts (>20,000) using PFEP to reduce transit shipping damage
• Worked on process sheets, PFMEA documentation and SPC for vertical CNC machining of valve cavities
• Conducted 24 full factorial Design of Experiments to optimize the air supply system (hose diameter / length / input
air pressure and hose shape) of all pneumatic torque tools used in the plant (Six Sigma project)
• Applied Gage R&R principles, used various measuring instruments to troubleshoot assembly fit/surface finish issues
• Worked on designing carts, workbenches, returnable storage / transit containers per Poka Yoke principles
• Performed internal ISO 9001:2000 audits for various departments
• Created a measurement device operating manual for using gauge blocks, profilometers, dimension measurement tools
• Developed an MS Access database system for storing and analyzing finished product audit information
HVAC Project Engineer, Stulz GmbH, Mumbai MH, India, September 2003 - June 2004
• Completed Precision HVAC projects (100 ton to 1000 ton) from concept to project signoff for large software firms
• Drafted duct layout and copper pipe routing drawings for precision air-conditioners and chilled water systems
• Programmed and installed advanced Humidity / Temperature control systems for precision air-conditioners
• Initiated contact with vendor for procuring condensers, evaluated and established benchmarks for supplier quality
• Supervised labor, procured components, managed project timelines and monitored project costs
Graduate Research Assistant, Center for Nano-scale Science & Eng., Fargo ND USA, August 2004 – December 2006
• Researched techniques to transform a laboratory scale self-assembly process for manufacturing RFID tags into mass
industrial scale
• Designed mechanical fixtures (using ProE 2001 and Solidworks 2003), programmed CNC machines for milling /
drilling / threading operations and ran fixture qualification trials
• Installed the computer interface for piezo-electric transducer control system and linear slide servo motor system
to control vibration frequency / slide speed and record experimental videos using high-speed vision system
• Used SPC charting / DOE / Gage R&R to optimize semi-conductor fabrication processes (trained to use precision
inspection equipment like optical / mechanical profilometers and measurement micro-scopes)
• Developed and validated a new silicon wafer fabrication process to manufacture micro-sensors
o Coordinated research tasks with undergraduate assistants, communicated with suppliers for procuring
required materials, worked on setup and operation of semi-conductor processing equipment
• Experienced with photolithographic, vapor deposition, ion implantation, dry and wet etching processes for semi-
conductor wafer fabrication (IC’s for the RFID tags and silicon mold wafers for plastic film embossing)
Special project
• In mold encasement of Radio Frequency ID tag in plastic material
Played a key role in mold design, development, process design and validation for encasing RFID tag in plastic
material. A Patent application has been filed for this process.
Publications
• Master’s Thesis: A Proposed Model for Predicting the Trajectory of a Micro-particle Falling Through a Fluid Medium
• ASME IMECE 2006 conference: Micro-embossing of polymeric substrates for Fluidic Self Assembly
References Available upon request