Post Job Free
Sign in

Engineer Supply Chain

Location:
Slatington, PA, 18080
Posted:
March 09, 2010

Contact this candidate

Resume:

Kevin R. Fisher

**** ***** ** *****: 330-***-****

Slatington PA, 18080 Email: abnuyw@r.postjobfree.com

OBJECTIVE To obtain a supply chain position of LEAN leadership, one that is challenging, a

position which will allow me to utilize my experience and knowledge of LEAN, Six

Sigma and management to facilitate increased productivity and better quality

within systems through teamwork, education, and innovation.

ACHIEVEMENTS

LEADERSHIP:

Design and deploy strategic corporate program reaching over 25,000

employees established to eliminate waste and provide value through

continuous improvement. Developed service based principle centered

LEAN systems model.

Transformed 80+ year old company built on batch methodology into a

flexible just-in-time network.

EDUCATOR/MENTOR:

Developed training curricula and materials; Mentored 60+ indirect

reports towards the implementation of a corporate model of LEAN

excellence.

Educated key supply chain leaders on effective LEAN deployment thru

tactical “hands-on” demonstrations of process dissection and effective

KPI integration.

RESULTS:

Implementation of LEAN value stream based approach which improved

operating income by 15% year over year ($31.7 million) through the

generation of more revenue, due to improved system velocity, while

minimizing variable cost through the elimination of non-value added

activities.

Utilized consolidation/simplification approach to turn $100 million dollar

business unit into companies top profit center.

EXPERIENCE

Zep Inc Aug 2007 – Present

Director of Supply Chain

Responsible for leading the organization thru a complete network redesign

utilizing a cross functional team focused on leveraging quantitative and

qualitative measurements in order to make fact based decisions.

(encompassed manufacturing and distribution)

Transformed Eastern Business unit into the flagship model for the

organization using LEAN tools focused on level loading and simplified

standardized processes.

Used Strategy Deployment to inject KPI’s within every operation of the

organization.

Served as plant manager in two distinctly different environments (one

location unionized/ one location nonunion)

DEALER TIRE May 2006 – Aug 2007

Supply Chain Manager

Using LEAN methodology to design and deploy inventory solutions focused

on improving facing customer fill rates

Developed LEAN implementation strategy across entire supply chain

Implement managed Min/Max system designed to improve inventory turns

and minimize delivery frequency

Improve overall customer satisfaction by using direct interaction to develop

custom inventory and replenishment systems

Utilize ERP systems to successfully meet customer demand

ROADWAY EXPRESS Jan 2000 – May 2006

Roadway LEAN System Engineering Manager Jan 2005 – May 2006

Hired, developed, and led the organizations team of 25 industrial engineers.

Led numerous Kaizen events in both operational (shop floor) and non-

operational areas (sales, pricing, project management) to define value,

create flow, establish customer pull, and overall to develop a better customer

focused system.

Developed/trained/coached 60 team leaders on proper kaizen

implementations

Introduced and trained 25,000+ employees on the concepts of the Roadway

LEAN System

Developed Roadway LEAN System Training and Reference manual

LEAN Coordinator Jun 2004 – Dec 2004

Led numerous Kaizen events to drive out waste and provide more customer

value

Solidified LEAN concepts that were introduced in manufacturing and

creatively developed ways to introduce them within a service/logistics based

industry.

Developed corporate vision for the Roadway LEAN System Strategy

Field Engineer Specialist Apr 2003 – Jun 2004

Deploy problem solving strategy to better facilitate change at Regional

Consolidation Centers

Used technical expertise to pinpoint system inefficiencies that were hindering

customer delivery service requirements

Developed ways to better utilize local facilities most constrained resources

Operations Engineer Specialist Jan 2002 – Mar 2003

Design and Deploy asset management and decision support systems

Manage development of Visual Basic Solutions in addition worked to take

successful Visual Basic prototypes to standardized platform

Manage projects involving both external software allocation for system

improvements as well as internal development

Operations Engineer Aug 2001 – Jan 2002

Managed the efforts of an engineering team in providing Ad-Hoc Visual Basic

Solutions to support both decision making and relevant data analysis

Responsible for the support and enhancement of the freight tracking

infrastructure

Design information systems and procedures that facilitate profitability

Senior Performance Engineer Dec 2000 – Aug 2001

Provide cost/benefit analysis on projects that facilitate support on

interventions and establish future forecasting information

Worked within a team to provide engineering insight on corporate wide

projects focused on increasing efficiency while reducing overall cost

Develop systems and procedures that help to increase the effectiveness of

front line supervision

Performance Engineer Jan 2000 – Dec 2000

Responsible for process flow analysis on various projects designed to

decrease clerical cost and increase thruput

Developed tracking and reporting tool that helped to point out strengths and

weaknesses within systems

Worked directly with customers in order to precisely meet their needs

CAROLINA POWER AND LIGHTING Aug 1999 – Dec 1999

Project Leader (Internship)

Responsible for controlling personnel flow within a major security project

Troubleshoot systems to find possible causes of delays utilizing statistical

analysis and simulation

Provide direction and leadership in order to attain peak efficiency

LIFESTYLE FURNISHINGS INTL May 1999 – Aug 1999

Engineer (Internship)

Solely responsible for product development project

Performed value engineering on entire product line in order to produce

standardization of parts using Oracle

Performed Kaizen events on Nautica and Timberlake lines to look for ways to

continuously improve the flow of the furniture through the plant

Utilized AutoCAD and Pro-Engineer in project completion

NORTH CAROLINA STATE UNIVERSITY

EDUCATION Raleigh, NC

Bachelors of Science - Industrial Engineering December 1999

Courses of Interest

Manufacturing Systems Facilities Design Inventory Control

AutoCAD/Pro-Engineer Design Quality Control Scheduling

Work/Time Study Analysis Cost Analysis LEAN Manufacturing

Software/Programming

Microsoft Office Suite AutoCAD Visual Basic (VBA)

Pro-Engineer C++ Fortran Arena

Certifications

Value Stream Mapping (Lean Enterprise Institute)

Creating Continuous Flow (Lean Enterprise Institute)

Developing Change Agents (Lean Enterprise Institute)

Proper Kaizen Techniques (Toyota Consultants TPS)

Kaizen Methodology (LeanWorks)

TPS training (Toyota Headquarters)

Six Sigma

References available upon request



Contact this candidate