Doug Pelton
Ashland, Ohio
419-***-**** cell
abnri3@r.postjobfree.com
Background:
New Model, & product launch
Quality -- Engineer - Manager – Supervisor
Supplier quality engineer
Control plans, PFMEA's, CPK’S
PPAP's - PSO's - APQP's – OP Standards
Responses
7-D, 5-Y, CAR, PRR, Ecimm, TR
Deep dive root cause analysis, Kaizen Discipline
Customers
onda, TS Tech, Chrysler, Lear, Lear Trade Sales
Delphi, Dana, JCI, Ford, GM
Commodities
Assembly -Plastic - Painting - Machining - Metals
Automotive, interior/exterior, high volume to R & D
Light and Heavy truck - Rail Road - Aerospace
Tier one and tier two
Office
Windows - Excel - W ord - Power Point
M-Pact, Covisint, Power Way.
Education:
University of South Alabama, BA 1994 Business Management (net)
Tiffin University, Associate 1978 Business Management
Vanguard Technical College- Supervision, Geo. D. & T.,
Stark Technical College-SPC, Juran Studies,
QS, ISO - TS Auditor - Kaizen Studies
Doug Pelton
New Model Quality IB Tech (520 employees) Assembly, paint 02/07 to 12/08 slow
New model customer quality window, control plans, PFMEA, Deep dive root cause
Analysis, CPK’s. working very closely with our customers.
Quality Engineer Assembly plant & manufacturing plant 06/06 to 02/07 temp, contract
Quality Engineer Blackhawk Automotive Plastic (560 employees) 11/04 to 04/06 plant closed
Injection molding, interior automotive trim, combined with paint and assembly
New launches, control plans, process flow, PFMEA, PSO, and PPAP's.
Deep dives for root cause analysis, & supplier approvals, while reducing scrap
using SPC, GD&T, and quality reports. Most important working teams including,
engineers, supervisors and machines operators in conjunction with the customer.
Maintenance City of Ashland 08/03 to 11/04 Interim only
Quality Manager Crestline Paint (380 employees) 01/02 to 08/03 plant slow down
Interior & exterior automotive trim, with a combination of paint and assembly.
Completing root cause analysis, to reduce scrap using SPC along with many other
tools in the quality area. I would drive reduction of PPM's using Kaizen projects and
working with suppliers and customers.
Process-Quality Engineer Citation, Mansfield (450 employees) 9/96 to 01/02 plant closed
Iron production. Mold and process I would lead the APQP with cross functional
teams for new launches & quality problems, I reduced scrap and resolved customer
complaints by close customer liaison relations.
Quality & Tooling Manager Ashland Castings (150 employees) 07/94 to 9/96 buy out/closed
Disamatic molding with iron production. Mold and process
Design and purchase all tooling. I was responsible for pattern shop and layout
department. As a team I worked with customers to lower PPM.
Tooling Engineer, Columbus Foundry (400 employees) 4/87 to 5/94 plant slow down/closed
Disamatic molding with iron production. Mold and process
W ith a high % of automotive business I was the control for tooling gating designs,
and new Launches. Implementing plans to improve yield was very important.
Initiate action from customer concerns.
Pre-production Supervisor, Hayes-Albion Corp. (300 employees) 8/73 to 4/87 plant closed
Disamatic molding with iron & Perm mold with aluminum production. Mold,
process. Lead initial launches, supervise layout inspection departme nt. Complete
PPAP's, implement planned methods for scrap reduction and production increases.
and train personnel with S.P.C. Direct reports 6 - layout, supervisor & gage area.