BRYAN J. FAUVER
**** ******** ****** ******, **. 18507
Home Phone :570-***-****, Cell Phone 570-***-****
Email: abnqyb@r.postjobfree.com
OBJECTIVE: Seeking a Leadership position in a manufacturing organization where I can develop people to be
challenged, take action and be accountable for their work. To build successful people so they can build a
successful and sustaining organization. A Organization that will be a leader in Quality, Service, Delivery and
Cost to their customers.
QUALIFICATIONS
I have 31 years experience working in various manufacturing facilities producing Digital Audio and
Digital Video Discs, Packaging Food Products, manufacturing Antistatic and Antibacterial Fibers as well
as manufacturing Chocolate confectionaries. My duties and responsibilities over the past 31 years have
varied greatly. My experience includes working as a Process Operator, Process Technician, Department
Manager, Process Engineer, Process Coach, Trainer, Quality Developer and Shift Production Manager.
I am presently unemployed. I was last employed as a Powder Coating Dept. Manager at Trion
Industries. My acquired skills include:
ISO 9001 Quality System Auditor
•
Quality Inspection Tools; Microscopes, Thickness Gage, Micrometer, Volt-Meter etc.
•
Documentation Control, SOP, GMP’s
•
Nonconformance Tracking and Reporting
•
Project Management (Trainer)
•
Statistical Process Control (Trainer)
•
Design of Experiment
•
Measurement Process Statistical Studies
•
Facilitation, Accountability Based and Dynamic
•
Problem Solving and Decision Making
•
Quality Management Tools and Concepts (Trainer)
•
Quality Assessment and Auditing
•
Team Leader/Facilitator (Trainer)
•
W ritten and Oral Communications
•
Team Dynamics (Trainer)
•
Lean Production Systems
•
Cellular Manufacturing Theory
•
Presentation Skills
•
Hazardous Material Handling (certified)
•
Member of American Society for Quality since 1996 (Senior Member)
•
ACCOMPLISHMENTS
• Designed and implemented a Racking system for the Powder Coating Process.
Benefits; Improved powder transfer efficiency, reduced part painting cycle time, reduced
natural gas consumption.
• Implemented new chemical technology for cleaning parts before powder coating.
Benefits; Reduced maintenance cycles, reduced maintenance manpower, reduced
natural gas consumption. Resulted in $18,000.00 yearly cost savings.
• Member of a management leadership team that successfully implemented a total
quality/lean production system within a multiple plant organization. Benefits; Reduced
product delivery time by 4 days, Reduced manufacturing costs by a $1.00 per unit,
Trained over 3,000 employees in quality management skills and techniques.
Designed and implemented a Mastering Glass Reclaim process for the CD/DVD
•
Mastering processes. Benefits; Realized a yearly savings of $850,000.00 on the
purchase of new glass substrates.
EMPLOYMENT
07/31/06 to 06/08/09: Powder Coating Dept. Manager, Trion Industries
Lead a two - shift staff of 40 + employees in painting metal Display and Scan Hooks for the
retail industry. My responsibilities include overall dept. scheduling, quality, maintenance,
safety, waste water analysis monitoring, and manning, as well as raw materials and Labor
budget control. Performed maintenance tasks and analyzed equipment problems.
rd
09/01/05 to 07/29/06: 3 Shift Plant Production Manager, Gertrude Hawk
Chocolates
Lead and coach a staff of 119 employees in the manufacture of
chocolate confectionaries. My responsibilities include; Hiring/Firing, maintaining the
production schedule, Budget control, Safety program facilitation, Process and product
Quality maintenance and control, GMP’s & HACCP Programs, Performance Management,
Leadership, Training, Maintenance and Inventory Management. Lead the production staff in
implementing Lean Manufacturing Principles to target waste and remove non-value added
activities from the production processes.
nd
08/01/04 to 08/30/05: 2 Shift Plant Production Manager, Nobel Bio-Materials
My responsibilities were to lead and support all production processes and staff in the
manufacture of Metallized Fibers and substrates for sale in the Electrostatic and
Antibacterial markets. My duties included, maintaining the production schedule, training and
coaching the 2nd shift staff. My duties also include quality assurance, process monitoring
and control. I was also a member of the organizations ISO 9000 quality audit team
03/01/04 to 07/30/04: Packaging Manager, Kane Warehouse
Lead a two shift Production Staff in the packaging of goods for the
Quaker Oats customer account. Responsibilities include staffing, production goal setting,
inventory control, production planning / scheduling, Customer Service and all aspects of
Quality Planning and Control. Troubleshoot equipment problems.
1997-2004 WEA 10 Point Quality Program Developer, WEA Manufacturing
Lead and facilitate company quality program within the organization. Lead Project Teams,
Audit Plants, and Trained employees in Quality Tools and concepts. Developed courses for
Project Management, and Leader / Facilitator training. Prepared Semi – Annual Progress
Reports for Management Team. Perform statistical measurement studies. Additional
responsibilities included Manager of CD Screen and Stamper Support
Technical/Maintenance Staff. Additional duties included managing the Central Chemical
Staff and Processes.
1996-1997 Pre Press Support Dept. Manager, WEA Manufacturing
Lead and coached a staff of 50 employees that prepared and supplied Films, Proofs,
Printing Screens, Plates and Inks to the CD and DVD manufacturing Plants. Prepared
Manning, Operational and Capital Budgets. Evaluated area process segments for
improvement opportunities. Day-to-Day contact with customers to resolve issues
concerning their work requirements. Developed and implemented a process for cleaning
CD Screen Frames as well a process for washing out and drying exposed screens.
1996-1996 Process Quality Developer – CD ROM Plant, WEA Manufacturing
Evaluated Plant production processes for improvements in cycle time, yield, waste, uptime
and performance to schedule using statistical studies. Trained and mentored Plant Process
Coaches. Managed projects, evaluated and analyzed process problems to final resolution.
Implement Plant quality guidelines and necessary. Create and update Plant SOP’s and
GMP’s as required.
1995-1996 Process Coach – Quick Response CD Plant, WEA Manufacturing
Coached and supported cellular manufacturing production teams (Injection-Molding,
Printing & Packaging) towards accomplishing their performance measures and meeting
production demands. Managed projects and facilitated continuous improvement teams.
Implement Quality guidelines and resolve customer issues.
1988-1995 Manager – Optical Media Mastering, WEA Manufacturing
Lead and coached a staff of 45 production and technical operators. Prepared Manning,
Operational and Capital Budgets. Recommended and purchased capital equipment.
Reduced cost of each manufactured unit by 0.01 by developing and implementing a CD
Glass reclaim process. Evaluated mastering process for improvement opportunities.
Implemented Statistical Process Control in all mastering processes. Trained and facilitated
production improvement teams in WEA‘s first Continuous Improvement Program PDS.
Establish and implement Quality Guidelines and work closely with customers to coordinate
and resolve quality issues.
1986-1988 Mastering Technician – Optical Media Mastering, WEA Manufacturing
Operated and maintained CD Mastering production equipment. Hired and trained new
Operators. Assisted in planning and building of a Class 10,000 Clean room manufacturing
environment for production. Spent 1 month in the Netherlands to train on and commission
CD Mastering production equipment.
1977-1986 Plating Operator – Analog Record Plant, Specialty Records
Operated stamper electroforming and finishing equipment. Preformed specialized
troubleshooting work on Lacquers, Nickel Fathers and Mothers for Pre Production QC.
Metered and mixed chemical make ups for plating bath production stability.
Oracle, Word, Access, Excel, Visio, SPC IV, Power Point, Microsoft Project, Chart Runner,
COMPUTER:
Mintab, Lotus Notes, Web Browser Navigation & Inventory Management
EDUCATION and TRAINING
1977 Graduated, Riverside High School
1989 Zenger-Miller/Frontline Leadership
1992 University of Tennessee – Stokely Management Center / Productivity through Quality
1993 Kepner – Tregoe Project Management Leadership Development Institute
1994 University of Tennessee – Stokely Management Center /Lean Production Systems
2002 Eastern Michigan University / Mistake Proofing
2005 Business Fundamentals – Brain Bench Certified
2005 Managing People – Brain Bench Certified
2005 Inventory Management & Control – American Management Association
Salary History and References available upon request.