Post Job Free
Sign in

Power Plant Mechanical Engineer

Location:
Park Forest, IL, 60466
Posted:
March 09, 2010

Contact this candidate

Resume:

Kenneth E. Griggs

***** ******* **** ***.

Park Forest, IL 60466

708-***-****

abnqpv@r.postjobfree.com

JOB OBJECTIVE: MECHANICAL ENGINEER

EDUCATION: B.S. in Mechanical Engineering

University of Illinois, Urbana, 1970

M.S. in Materials Engineering

University of Illinois, Chicago, 1976

REGISTRATION: Professional Engineer, IL No. 35676, 1977 (Not Active)

SUMMARY OF EXPERIENCE:

2006 – 2008 Orbital Engineering, Hammond, IN. Lead Mechanical Engineer on several waste

water projects for the BP Refinery in Whiting, IN. These included locating

a leak between two sewer systems and plugging it, developing covers and a

nitrogen purge system for several sumps, designing, supervising pipe layout

development and specifying equipment to pump treated waste water out into

Lake Michigan. Also walked down P&ID mark-ups and supervised CAD

corrections to them. Participated in the design and selection of new flow

meters and RV’s for one of the processing units.

2006 Bechtel Engineers, Frederick, MD. Sized sub-systems, developed drawings,

and specified equipment for an FGD retrofit to the Sammis power plant.

1996 - 2001 Sargent & Lundy Engineers, Chicago, IL. Reconstituted calculations for

piping, pumps, and relief valves for DC Cook Nuclear Power Plant. Reviewed

and checked P&Ids, isometric drawings, and calculations for Santee Cooper

Combined Cycle Plant. Five months field assignment to Paris, France to work

on Normandy IGCC project. Performed calculations, wrote design criteria

documents, wrote specifications, and expedited drawings for Redhawk Combined

Cycle project. Temporary assignment to S&L’s Houston office to perform

similar work on Tupelo Combined Cycle project. Responsible for engineering

analysis and preparation of specifications for several miscellaneous fossil

power plant upgrade projects including an ash storage system expansion, low

Nox conversion and soot blower upgrade. Responsible for expediting and

preparing contract documents and specifications for procurement actions for

two coal fired power plants in China and one DOE advanced coal technology

project.

1994 - 1996 GKC Engineers, Chicago, IL. Responsible for the analysis and design of all

major systems for a 40 MW, Steel Blast Furnace Gas fired cogeneration power

plant. Responsibilities included preparing equipment specifications and bid

packages.

1992 - 1993 Intercontinent Engineers, Downers Grove, IL. Performed engineering analysis

and equipment sizing for several landfill gas fired, electrical generation

projects. This included one Organic Rankine Cycle project. Other projects

included steam pipe stress analysis, power plant oil spill contingency

planning, and analysis of water sprinkler fire suppression system. Work

involved extensive use of computer including Autocad.

1983 - 1991 Army Corps of Engineers' Construction Engineering Research Laboratory (USA-

CERL), Champaign, IL. Performed research for the Energy Systems Division in

Heat Recovery Incineration of wastes and advanced coal technologies.

Developed standardized design for small incinerator plants. Used

microcomputers to organize and analyze data through data bases, spread

sheets, word processing and CAD.

1975 - 1982 Fluor Power Services, Chicago, IL. Performed engineering analysis of

electric utility power plant systems. Performed industrial cogeneration

studies and helped prepare proposals for Fluidized Bed Combustion and

industrial cogeneration projects. Assessed the work of other less

experienced engineers.

1979 - 1980 Argonne National Laboratory, Argonne, IL. (Temporarily assigned from Fluor

Power Services) Conducted Fluidized Bed Combustion research by surveying

almost all domestic and several foreign FBC projects.



Contact this candidate