Curriculum Vitae
FIRST: GUADALUPE MIDDLE: ALFREDO
Name:
SURNAME: GONZALES
Home Address: *** ******* ** ******** ** 77905
Discipline: TOOL PUSHER
D.O.B: 01/05/1974
Nationality: UNITED STATES
Years Exp: 19
Contact Telephone
361-***-**** cell
Numbers:
Contact email
abnpag@r.postjobfree.com
addresses:
INGLISH AND SPANISH
Languages:
Education: 9TH
Industry IWCF, First Line BOP Supervisor Training, Confined
Training/Certificates: Space Entry, High Angle Rescue, Fall Protection, Forklift
safety training. H2S Alive Training, decision point
training, shell yellow book training,basic rig training,
Man Lift, Bob Cat, first Aid & U.S Safety, Environmental
& Medical Training
na
Other Training/
Certificates:
Onshore Experience
Rig Types / Horse 1400 hp 210 national Draworks, 900 hp can rig Top
Power / Topdrives Drive. Dreco Sling Shot Sub. Cantilever Triple. 2 - F
1600 Mud Pumps, 5 Bay Allen Bradley SCR System
1200 hp Cabot 1200, Kelly Drive, Telescoping Triple, 2-
PZ9 Mud Pumps. Mechanical Rig
1000 hp Cantilever Triple, Diesel Electric, 3 Bay Allen
Bradley SCR, Unit 36 Draworks, 2 – Oil well A-1100 Mud
Pumps, Can rig Top Drive
800 hp Telescoping Double, Mechanical Rig with TSM
Draworks, PZ8 Mud Pump
2000 hp, had three 398 motors on the floor for the draw
works, diesel electric, Kelly rig, B.A.B SCR, 2 GD, PZ10
Page 1 of 3
Offshore Experience
na
RigTypes / Horse
Power / Topdrives
Personal Profile: I have been working on Small and Large Land Drilling
Rigs for 19 years, starting on a Work Over Rig to a Floor
Hand to Derricks to Driller and to Rig Manager. The
bulk of my experience has been with Diesel Electric and
some Power Rigs I have worked with Tesco and Can rig
Top Drives. Team player works well in simultaneous
operation to maximize results for client, I speak Spanish
as well as mother English
Work History:
Jun 24- Nabors Wyoming / Casper
07 – July
11-09
.
Position Monitor Drilling operations, Supervise rig crew, provide training to new
– Night employees. Call and Chair pre job safety meetings and rsmt’s, ensure company
Rig procedure and policies are followed. Operate hoisting controls and Top Drive.
Manager Communicate with Rig Manager and Company Man
Maintain and keeping up with equipment hrs, Making sure all daily and monthly
inspection is done, fire ex., pipe slings, and oil samples. Keeping up with all
documentations on confine space entry, buffer zone entry, hot work permits,
JSA”S, HSC, fluid transfers
Aug 05 – April-07 Pattman Drilling co. Cleavern Tx
Position – Rig Supervise Drilling operations. Ensure company policy and
Manager procedures are followed during daily operations. Over see
rig maintenance and ensure preventive maintenance
program is followed. Ensure Warehouse stock is
replenished and accounted for. Mentor and train new
workers. Support HSE Hand during Pre-job safety
meetings. Communicate with Oil Company Rep
concerning Daily operations
March 99 – Aug 05 Patterson UTI Drilling
Position – Driller Monitor Drilling operations, Supervise rig crew, provide
training to new employees. Call and Chair pre job safety
meetings, ensure company procedure and policies are
2
followed. Operate hoisting controls and Top Drive.
Communicate with Rig Manager and Company Man
Feb 95 – March 99 Southland UTI, Victoria Texas
Position – derricks Monitor Drilling operations, Supervise rig crew, provide
training to new employees. Call and Chair Mud wt. To
driller and company man, Mix and add chemicals when
need to drilling fluid. INSPECT DERRICK for missing
pin and keepers, and also for wear and tear on equipment.
Ensure company procedure and policies are followed.
Operate hoisting controls, Communicate with Rig
Manager, Company Man, Mud engineer, driller
94 – Nov 95 Nabors Drilling South Texas
Position - floors Making connection, tripping in and out of the hole,
scrubbing, painting, helping others when needed.
Ensuring company policies and procedures are followed
90 – Nov 94 Caspian Work over South Texas
Position - floors Wrenching rods, pulling out to change pumps. On pump
jacks, stripping jobs, that’s when you can’t pull the rods
out of the hole alone, so you have to pull rods with tubing
out in order to replace what needed, also did some
gagging when rig was down and out of service
Page 3 of 3