Post Job Free
Sign in

Project Manager Plant

Location:
Owasso, OK, 74055
Posted:
March 09, 2010

Contact this candidate

Resume:

DAVID G. HEARN

***** *. **** **. *****; Owasso, OK 74055

918-***-****

abnnll@r.postjobfree.com

SUMMARY

Seasoned professional with extensive experience in manufacturing, engineering,

and managerial roles. Strong leader with the experience and ability to manage

large groups of people from multiple disciplines. Student, instructor, and

practitioner of lean manufacturing techniques focused on increasing value and

decreasing waste in all aspects of the business.

EMPLOYMENT HISTORY

UMICORE AUTOCAT USA (formerly Delphi Corp.), Catoosa, OK 1979-2009

Belgium-based materials technology group that manufactures automotive

exhaust catalysts.

ACCOMPLISHMENTS

Management

• Managed a high volume manufacturing organization with an annual

operating budget of $15 million (excluding materials) and over 300 hourly

and professional personnel on a 24-hour/7-day schedule. Responsibilities

included safety performance, scheduling, throughput, machine efficiency,

scrap, and all matters related to human resources.

• Managed a group of five engineers and had global responsibility for

process development of new products. Supported sites in Oklahoma,

France, South Africa, Mexico, China, and Australia.

• Managed a group of six engineers responsible for continuous

improvement activities and facilities enhancements at the Catoosa plant.

• Supervised 25 hourly personnel on a 24-hour/7-day schedule in the Pilot

Plant area. Responsible for the manufacture of catalyst samples for

internal testing and shipment to customers and potential customers.

Engineering

• Successfully identified and reduced several sources of process variation,

resulting in savings of several million dollars in precious metals and other

materials.

• Served as Project Manager for a team that reduced the plant’s scrap rate

by over 50%.

• Responsible for resolving routine manufacturing issues on a 24-hour/7-

day basis.

• Participated in process development, machine design, installation, and

startup activities for a new catalyst manufacturing plant in France.

• Created bills of material for all commercial products to support the

introduction of an enterprise-wide business information system.

DAVID G. HEARN

Page 2 of 2

ACCOMPLISHMENTS (continued)

Lean Manufacturing

• Served as a principal member of a team that implemented the Delphi

Manufacturing System (DMS), a lean manufacturing structure modeled

after the Toyota Production System.

• Functioned as champion of Operational Availability, one of the six

elements of DMS.

• Developed an Operational Availability training plan and personally trained

all plant personnel.

• Served as the resident expert in the areas of machine efficiency,

preventive maintenance, and quick changeover.

• Initiated and presided over several Kaizen events aimed at maximizing

utilization of personnel, reducing material movement, and eliminating

unnecessary equipment.

• Led a team that used SMED and Value Stream Mapping techniques to

reduce changeover time in one area of the plant from six hours to 30

minutes.

Special Projects

• Performed a comprehensive technical and financial analysis related to the

potential movement of non-core business to a sister plant in Mexico.

• Worked with appropriate groups in both plants to facilitate the movement

of these products, resulting in a financial benefit to both plants.

EDUCATION

Bachelor of Science, Mechanical Engineering (Cum Laude), Tulsa University,

Tulsa, OK, 1989

CERTIFICATIONS

Shainin Problem Solving Methodology

Red X Journeyman

Green Y Journeyman



Contact this candidate