Post Job Free
Sign in

Engineer Quality

Location:
Warren, OH, 44481
Posted:
March 09, 2010

Contact this candidate

Resume:

Lisa Modispaugh_______________________________________________________________

**** ****** **. ** 330-***-**** or 585-***-****

Warren, OH 44481 e-mail: abnkow@r.postjobfree.com

OBJECTIVE

Lean/Six-Sigma Quality Engineering position in a dynamic, team-based company, utilizing proven analysis,

development and implementation skills to improve quality, productivity and efficiency by:

- decreasing costs and increasing capacity

- eliminating redundancies and waste

- utilizing lean manufacturing principles and analysis tools

QUALIFICATIONS

Certified Quality Engineer

Lean/Six-Sigma Green Belt Certified

Performed audits and established quality criteria for supplier and customer products.

Led lean reduction projects to improve process flows, reduce redundancies and eliminate waste.

ACCOMPLISHMENTS

Developed new layouts for disassembly line and packaging area using AutoCAD R13. Result: Optimized area

layout decreasing initial space requirements by 43%.

Developed new Motion-Time-Measurement (MTM) time standards, layouts and workflow in machining area.

Result: Improved work balance reducing head count by 17% and increased capacity of workstations 20%.

Implemented improved training procedure for assembly operators utilizing digital picture processes. Result:

Consistent training method that decreased operator defects and training time by 30%.

Analyzed usage of new parts used in remanufacturing process. Result: Cost avoidance of $75,000/yr in

manufacturing process.

Led engineering team in a lean reduction project for the 5090 DocuTech Finisher line. Result: Reduced the layout

of the line by 27%, eliminated $200,000 in excess material and equipment and improved the flow of materials.

Analyzed statistical quality data daily for each manufacturing station. Defined any issues and determined the

corrective action. Result: Number of defects per machine dropped by average of 20%.

Analyzed manufacturing process of paper-feeder sub-assembly station. Result: Developed new tools and

equipment with design group that reduced manufacturing cycle time by 33%.

Led scrap reduction team to analyze the rubber door stopper molding and finishing processes. Result: Reduced

total scrap of product by 50%.

Performed a six-sigma green belt certification project to reduce scrap and lean the finishing process of rubber drain

component. Result: Reduced scrap by 70% and eliminated one operator.

Performed continuous improvement project in order entry group. Result: Reduced the time for parts orders from 5

to 2 days, and streamlined the modification process to eliminate lost orders.

EXPERIENCE

Cattron Group International

Quality Engineer (4/07 to 5/09)

Work on continuous improvement projects using Lean/Six-Sigma techniques. Coordinated quality audits in

accordance with ISO 9001. Improved new product development process and organized the global meetings to bring

products from concept to full production. Calculated and analyzed supplier delivery and quality rating monthly.

Conducted supplier audit visits and worked with suppliers on root cause analysis of part issues. Led monthly Quality

Review Board to identify issues, determine root cause and provide sustainable solutions.

Johnson Rubber Co.

Quality Engineer (9/04-3/07)

Responsible to meet all ISO 14001/QS 9001/TS 16949 standards. Managed and sustained improvement projects to

reduce scrap and increase productivity using Lean/Six-Sigma analysis tools. Created quality procedures and work

instructions to ensure smooth launch of new rubber molded products into production as well as existing products.

Prepared all PPAP documentation required for each customer including Ford and Honda. Audited suppliers to

ensure all materials and finished products met standards. Performed daily quality audits of WIP and finished goods.

Completed and presented at the customer site irreversible corrective actions.

Eastman Kodak Co. (Health Imaging Division)

System Configuration Specialist (3/03-9/04)

Worked with Kodak’s health imaging sales force in preparing equipment quotes for direct sales, distributors and

OEM’s. Coordinated with the field engineers to ensure correct equipment and accessories were delivered to the

customer to ensure a flawless install. Answered technical questions dealing with Kodak’s health imaging equipment

for all distributors, OEM’s and sales force. Used SAP system to enter orders for imaging equipment.

Xerox Corporation

Manufacturing/Final Run and Test Engineer (02/02-11/02)

Coordinated with Canadian vendor to develop and implement new test fixture for the testing and qualification of

pre-production machine module. Developed new processes, instructions and layouts for the different modules.

Performed quality audits on new parts from each supplier to ensure parts were to specification. Analyzed material

flow processes to increase efficiency, decrease waste and effectively utilize labor.

Supervisor/Manufacturing Engineer (08/00-02/02)

Managed 30+ union employees to meet delivery schedule 100% while performing my manufacturing engineering

responsibilities. Performed all supervisory responsibilities such as payroll, discipline reports, progress reports, etc.

Worked with dispatchers to ensure on-time delivery of parts.

Manufacturing Engineer (02/99-08/00)

Created new layouts and labor standards for the 5090 DocuTech Finisher manufacturing and packaging area.

Developed procedures and work instructions to improve the efficiency and quality of the Finisher line. Reduced

training time and performed ergonomic analysis of workstations. Let improvement teams to eliminate waste in

workstations, reduce the overall line layout size, and decrease manufacturing costs. Used lean manufacturing tools

to collect data, analyze and improve the quality and output of the Finisher machines.

Production Engineer Intern (05/98-08/98)

Develop facility layouts and material flow processes to reduce waste and increase productivity in machining area.

Performed MTM studies to evaluate setup/staffing alternatives. Conducted ergonomic analysis of workstations to

prevent injury.

EDUCATION

M.S., Manufacturing Management and Leadership, Rochester Institute of Technology

B.S., Industrial Engineering and Minor in Japanese Language, SUNY at Buffalo

Japanese Summer Exchange Program, Kanazawa Institute of Technology

Lean/Six-Sigma Green Belt Certified

COMPUTER SKILLS

Proficient with AutoCADR13, MS Word, Excel, PowerPoint, Internet Explorer, Visio, MiniTab and Outlook.

AFFILIATIONS: Member of ASQ



Contact this candidate