GARY WENDT **** N. Pine Shore Drive, Glendale, Wisconsin 53209
Home: 414-***-**** Email: abniom@r.postjobfree.com
PROFESSIONAL OBJECTIVE
Seeking a challenging career oriented position in CONSTRUCTION MANAGEMENT or related area.
PERSONAL PROFILE
Extensive experience in both ‘Design-Build’ and ‘GC’ methods of construction management for
commercial or residential. Very adaptable to a wide variety of project delivery methods. Extremely
competent, effective and well organized in managing, directing and supervising the development of
construction projects to achieve maximum results. A solid track record of maintaining an excellent
record of project completions on or before established deadlines within budgetary guidelines. Motivate
and inspire others to best efforts through quality leadership, proper utilization of personnel, and the
ability to resolve problems in an effective and proactive manner. An effective and productive
communicator, who readily establishes, gains and maintains cooperative rapport with owners, architects,
engineers, general/subcontractors, and corporate level personnel.
SUMMARY OF QUALIFICATIONS
Offering quality specialized practical experience in the following categories:
• Develop strong working relationships with Owners.
• Major emphasis on pre-construction services and value engineering strategies.
• Construction Management / Job Supervisory Skills.
• Design/Build Project Management Experience.
• Proactive Problem Solving Philosophy & Resolution.
• Construction Budget Analysis/Preparation & Monitoring.
• Project Proposals/Feasibility Reports & Presentations.
• Contract Preparation & Negotiation.
• Proficient in Microsoft Word and Excel; Primavera Expedition and SureTrack; Timberline
Precision Estimating; and F.W. Dodge Bidfax.
ACHIEVEMENTS
• Traditional ‘General Contractor’ experience with negotiated and hard bid delivery methods. Total
project management, including managing self-performed labor divisions such as concrete, masonry,
steel, carpentry, drywall, and precast.
• ‘Design-Build’ experience of medical facilities on a national basis. Direct responsibility for the
sales, development and project management of single source design/build medical facilities ensuring
company profit margins, project timetables for client satisfaction, future references, and repeat
business. Projects included both free standing outpatient facilities and hospital
renovations/additions.
LICENSES
Wisconsin Real Estate Brokers license.
Wisconsin Contractors License.
MBA Arbitrator / Mediator.
Page 1 of 3
PROFESSIONAL EXPERIENCE
2002 – DIVISION CONSTRUCTION MANAGER - Wisconsin: Homes by Towne of
Oct. 09 Wisconsin, Milwaukee, WI (Zilber Ltd. / Towne Group is a national developer and builder
for residential and commercial projects).
• Manage the design and construction operations for residential single family and
condominium homes in Southeastern Wisconsin. Average annual closings of
approximately 60 – 80 homes per year.
• Develop, train, manage, and motivate all construction department personnel in order to
achieve all corporate real estate development, construction, and sales goals.
• Develop and manage a Quality Assurance (QA) Program for the Wisconsin Division to
achieve the highest ratings possible from our liability insurance company.
• Develop, manage, and monitor a series of QA checklists for all field Superintendents.
• Establish and maintain strong subcontractor and supplier relationships.
• Ensure all homes are built in accordance with the established quality and building
standards, and built in accordance with established budgets and schedules.
• Manage, monitor, and ensure all warranty work is completed in accordance with the
established procedures and timeframes.
• Oversee the production of all plans and specifications, as well as their ongoing value
engineering and enhancement, while maintaining company high standards for quality and
“Best Practice”.
• Establish, implement, monitor and continually refine construction systems, procedures,
forms, and policies.
• Monitor and evaluate schedule systems, schedule effectiveness and cycle times.
• Monitor budgets to ensure adherence, while identifying areas for cost savings.
• Monitor customer satisfaction and assist in resolving customer complaints.
• Lead, mentor, provide direction and support, and monitor results.
• To provide construction support to sales in order to achieve company goals.
2000 – 2002 PROJECT MANAGER: J.P. Cullen & Sons, Inc., Brookfield, WI (General
Contractor).
- 2 yrs. - Traditional ‘GC’ project management of health care, educational, and commercial projects.
1997 – 2000 PROJECT MANAGER: J.H. Findorff & Son, Inc., Milwaukee, WI (General
Contractor).
- 3.5 yrs. - Excellent ‘GC’ project management track record in educational, commercial and retail
projects ranging from $1 to $25 million. Total responsibility from sales, estimating, bidding,
project management, budget, schedule control, quality, oversee self-perform labor trades, and
meeting contractual commitments and client satisfaction.
1993 - 1996 CUSTOM HOME BUILDER: Prestige Homes, Inc. (Self-employed small custom
- 4 yrs. - builder). Due to changes in the national healthcare marketplace in 1993, I incorporated
Prestige Homes as a single family custom home builder.
1984 - 1993 PROJECT DIRECTOR: PDC Facilities, Inc., Hartland, WI (Privately held
Page 2 of 3
design/builder
- 10 yrs. - of medical facilities). Responsible for the design/build development of medical facilities
serving the national health care and local commercial markets. Manage and direct all
functions of the design/build project from initial sales, preliminary owner contract, site
feasibility studies, A/E design services, estimating, governmental permit agencies, on-site
construction management, final owner contract, through completion, final acceptance and
close out. As the project team leader, act as the primary driving force with all intercompany
team members; top administration, accounting, contract administration, architectural,
engineering, estimating, construction management, manufactured products, cabinetry and
RF/Magnetic shielding. Prepare and present the project feasibility report/proposal which
identifies the project issues, solutions, schematic design, budget, timetable and
recommendations for owner approval to proceed into the final design/build contract.
1982 - 1984 ESTIMATOR: American Medical Buildings, Inc., Milwaukee, WI (Publicly held
- 3 yrs. - design/builder of medical buildings). Assistant to the pricing manager with responsibility
for the construction pricing of preliminary and final budgets for projects ranging from 20,000
to 80,000 square feet with budgets up to $6 million. Coordinated with the design and
construction management departments to accurately compile quantitative price analyses from
schematic designs or final construction drawings. Extensively utilized computer estimating
systems, internal/external construction data and various other factors to compile an estimate/
price to be utilized by the marketing and construction departments to sell the project.
1981 - 1982 CONSTRUCTION MANAGER: National Development & Investment, Inc., ( NDII )
- 1 yr. - Brookfield, WI (Publicly held real estate syndication company). Directed, managed and
supervised renovation and remodeling of residential multi-family projects.
1980 - 1981 DRAFTSMAN: INRYCO, Inc., Milwaukee, WI (INRYCO was a division of Inland Steel
- 1 yr. - Company). Architectural draftsman in the Building Panels Engineering Department.
1977 - 1980 PROJECT DEVELOPER: UniShelter, Inc., Greenfield, WI (Publicly held residential
- 3 yrs. - developer and builder). Developed residential subdivisions from initial feasibility studies,
schematic design and municipal approval to final acceptance by the municipality. (Note:
Company went bankrupt due to high interest rates in the late 70’s).
EDUCATION
University of Wisconsin – Milwaukee.
Post graduate studies in Masters degree program for Structural Engineering.
University of Wisconsin - Stout, Menomonie, Wisconsin.
Bachelor of Science degree in Industrial Technology majoring in Building Construction Management.
GPA: 3.2/4.0
Page 3 of 3