Geoffrey P. Grace
Little Falls, NY 13365
Education
Cornell University
Johnson School of Management MBA 1988
Sibley School of Engineering/College of A&LS BS Mechanical Engineering 1986
Employment
2006 to current
Lapp USA
Engineering and Product Manager (Connector and Accessory Products)
- Coordinated all internal design activities for Rectangular and
Cylindrical connectors, Cable glands, and Specialty accessories
- Developed domestic vendor base to optimize sourcing opportunities
- Provided technical assistance to the Sales team and Customers for
combining Cable and Connector products
- Evaluated local inventory positions to optimize domestic and
international stock
- Developed marketing plans to increase Customer base and awareness
Amphenol Aerospace - Sidney, New York 1995 to 2006
Production Manager - Industrial products 2005-2006
- Responsible for all aspects of production for Commercial products
from Fraser, MI and Telecom products from Shenzhen, China
- Responsible for timely delivery of oil and gas cable assemblies from
Nogales Mexico
Product Manager - Industrial Connector products 2001-2005
- Provided product support for all core industrial products
- Responsible for launching new connector products in Medical,
Telecom, and Process Control markets for North America and China
- Established production facility for industrial products in Shenzhen,
China
- Supported China sales team with technical support, account visits, and
production
Process and Quality Engineer - Military/Aerospace products 1998-2001
- Responsible for the Quality performance of the machining
departments. Equipment included Gridley, Mori Seiki, Bechler, and
Esco machining centers. Products included copper contacts, as well as
Aluminum, Stainless and Carbon steel housings.
- Reorganized the die casting production area and added a Toshiba
robotic die casting unit.
- Coordinated Quality and Manufacturing teams to reduce root cause
machining defects that were effecting the plating and assembly
processes.
- Processed customer returns relating to all aspects of connector
production.
- Monitored monthly scrap and worked with department supervisors to
provide long term reduction from 4.5% to 2.4%
- Led Quality team to analyze engine harness failure for major engine
manufacturer
Process Engineer - Chatham, Virginia 1995-1998
- Worked with electricians to install both power and signal requirements
for welding and jacketing lines
- Designed production equipment for slitting, TIG welding, and
corrugating coaxial cables for cell towers
- Specified support systems for new facility in Liberty, North Carolina.
Systems included compressed air, natural gas, ventilation, and chilled
water
- Specified vacuum system and storage for compound handling from rail
car siding to storage silos to extrusion lines
- Specified electrical requirements including transformers, switchgear,
and subpanels for various production operations
- Responsible for timely delivery of oil and gas cable assemblies from
Nogales, Mexico
Four Suns Inc - Oneonta, NY 1988 to 1995
Production Supervisor
- Managed a staff of eight employees
- Maintained a two shift, seven day per week production schedule
- Achieved Quality and Production objectives