KYLE EDWARDS
CHARLOTTE, NC
Email: abnh6c@r.postjobfree.com Phone: 704-***-****
Project Management Professional
SUMMARY OF QUALIFICATIONS
Results-driven professional with exceptional leadership skills, an extensive background in program and project
management, and 12+ years of experience across broad-based competencies including the management of timing and
budgetary responsibilities for multiple complex and high impact concurrent projects. A demonstrated ability to lead cross-
functional teams to deliver projects on time and on budget. A track record for building and leading teams in a matrix
reporting structure – including hiring/staffing, setting team vision, and day to day management. Experience with:
Advanced Planning and Statistical Process Design Verification
Quality Process(APQP) Control (SPC) Plan and
Production Part Gage R&R Report(DVP&R)
Approval 8 Disciplines(8D)/7- Chrysler CN system
Process(PPAP)/ Process Step Process / 5-Why Powerway™ System
Sign-Off(PSO) Process Ford WERS
GD&T TS16949 Auditing
PROFESSIONAL EXPERIENCE
AEES (formerly Alcoa Electrical and Electronic Solutions) July 2008 – June 2009
Kirkland, Washington
Supplier of wire harnesses, electrical components, and electronic power distribution modules for the light vehicle and
heavy truck industries
Senior Program Engineering Manager
Managed customer interface for marketing, sales, engineering, and production for 4 major programs with
distinct budgets and timelines; led a co-located, cross-functional team including more than 10 development
engineers and 5 production engineers. Responsible for achieving PPAP approval of all new products.
Coordinated the supplier management process.
Drove new business opportunities which led to a projected $6M in revenue by influencing the customer’s
component selection process and meeting customer satisfaction requirements.
Developed a detailed timeline, budget of more than $1.2M, and a resource plan to meet both customer
milestones and government regulatory compliance, while maintaining the internal margin requirements.
Led revision efforts of the existing boilerplate RFQ and RFP processes. Incorporated evaluation of
financial assumptions, impact on business, and application of existing tools before compiling a response.
Increased likelihood of being awarded contact and ensuring project profitability.
Collaborated with the customers’ Engineering, Purchasing, Testing, and Supplier Quality departments to
eliminate $1M in recurring costs across all projects in its first year of implementation.
Improved the AEES engineering change process by strengthening communications with the customer’s
engineers and synchronizing the change process between the two organizations.
Implemented proven problem solving processes at the Mexican production facility, decreasing recurrence
of customer issues and quality costs.
Hella Lighting Corporation May 2002 – May 2008
York, South Carolina
Supplier of vehicle exterior lighting, working with OEM companies like BMW, Chrysler, Ford, GM, Mercedes, and
various heavy truck manufacturers
Project Manager Series July 2005 – May 2008
Led engineering effort to implement product improvement ideas, engineering changes, and quality issues for
Chrysler, Ford, and GM products; Developed detailed timelines for the customer APQP milestones
Hella Lighting Corporation
Project Manager Series (cont’d)
Boosted customer satisfaction through improved response time and implementation of corrective actions
for production quality issues.
Decreased the deviation between planned and actual Project Profit-Over-Life through product and process
improvements. Rethought financial assumptions, improved engineering change processes and component
sourcing, reduced final assembly scrap, and instituted changes to the assembly line process.
Reduced warranty costs. Led root cause analysis and implemented process changes.
Participated in Kaizen Improvement events to improve cycle times, decrease scrap, and reduce non-
conformities.
Completed training in Design and Manufacturing for Six Sigma.
Launch Manager July 2005 – May 2006
Balanced parallel duties of launching a new development project while performing PM role. Managed
advance prototype builds, production proof processes, and introduction of new products into the production
facility.
Met the internal Target Agreement for Profit-Over-Life assumptions despite the un-planned effort to
transfer production from Mexico to the USA.
Delivered $3M vehicle program to Start-of-Production ahead of schedule and on budget.
Interim Project Manager September 2004 – July 2005
Following notable successes in resolving customer interface issues, appointed to manage a project in the
quoting and early development phase. Led a development team of 4 engineers to review of customer pre-
source packages/project scope statements to access financial, manufacturing, and quality feasibility.
Developed business case to ensure project met or exceeded initial profitability assumptions.
Developed a plan to meet customer milestones for a program with compressed timing requirements.
Quality Assurance Engineer May 2002 – July 2005
Developed and organized the Design Verification Testing program. Evaluated specifications and verified the
program met the customer requirements. Coordinated with the Purchasing group to select, audit, and
management tiered suppliers.
Created/maintained Advance Product Quality Planning(APQP) documentation (PFMEA, Control Plan,
etc.),
Ensured approval of Process Sign-Off (PSO) and Production Part Approval Process (PPAP) submissions.
Created and managed the Statistical Process Control(SPC) strategy during development, including gage
development.
Created, reviewed, updated, and audited product Control Plans – both Prototype, and Production
Conducted TS16949 audits of supplier’s production and logistic operations
Ford Motor Company May 1997 – May 2002
Dearborn, MI
Original Equipment Manufacturer of automobiles
Design and Release Engineer February 2002 – May 2002
Program Management Analyst November 2000 – February 2002
Forward Models Engineer July 1998 – November 2000
Ford College Graduate Program May 1997 – July 1998
EDUCATION/TRAINING
Bachelor of Science in Mechanical Engineering, North Carolina A&T State University, Greensboro, NC 1997
ISO/TS16949 – Certified Internal Auditor
Trained in Six Sigma Methodologies; Trained in Kaizen Improvement Events
MS Office Suite of programs (Excel, Project, PowerPoint, Word, Outlook); SharePoint
Lotus Notes