Post Job Free
Sign in

Engineer Engineering

Location:
Lapeer, MI, 48446
Posted:
March 09, 2010

Contact this candidate

Resume:

Jeffrey R. Geske

*** **** *****

Lapeer, MI. ****6

810-***-**** or 810-***-****

abngjo@r.postjobfree.com

QUALIFICATIONS

Engineering Manager: Program Management, Sales, Budget, Estimating, R&D

Eng, Manufacturing Eng and Product Eng.

Project Engineer: Prepare manpower estimates, Project P&L, Design

Scheduling, Design Reviews, Failure Mode Analysis, Producibility and Test

Management

Design Engineer: Concept, Layout and Design of Castings, Weldments, Sheet

Metal, Mechanisms and Test Fixtures.

Quality Engineering : Conduct Failure Review Boards, Manage Test Site Data,

Corrective Actions, Root Cause Analysis, Issue resolution, Six Sigma principles

( Fishbone diagram, 5 Why’s, FMEA's, Pareto charts, Histograms), GM Red X

apprentice.

Manufacturing Engineer: Tooling fixtures, Fabrication, Develop Process and

tools for Assembly, IRT Co-Chairman, Lean Engineering, Vehicle Launch team

EDUCATION

B.S. Mechanical Engineering Technology

Lake Superior State University

Sault Ste. Marie, MI.

EXPERIENCE

September 2009 to Present D-M Fabrication, Sterling Heights, MI.

Manufacturing Project Engineer for build to print Automotive and Aircraft

fixturing.

Prepare material list, program water jet and plasma burn cutting, resolve build

issues with customer and plant and order material.

September 2008 to Present

Owner J&E Engineering ( Cage 582Y1) offering Design, Prototype design and

build, Testing, Build to print, Root Cause and Corrective action support.

July 2004 to August 2008 Champion Bus Inc., Imlay City, MI.

Manufacturer of mid size buses for retail and transit. Buses over 10,000 lb gvwr

Engineering Manager

Page1 of 3

Resume Jeff Geske cont

Nov. 1999 to July 2004 General Motors Truck Group, Pontiac MI. (Add Staff)

Manufacturing Engineer in General Assembly assigned to vehicle launches

Launch of Chevrolet Avalanche, Cadillac Escalade EXT, 560 Tilt cab heavy

duty truck.

Responsible for Coordination and implementation of Lean Manufacturing,

Assembly tools, Assembly Process, Assembly Process Validation in plant.

Areas of responsibility Final, Chassis, Radiator, Frame and Trim line.

Issue Resolution Team Co-Chairman

Dec. 1998 to Oct. 1999 A.V. Technology

Shelby Twp. MI.

World supplier of armored vehicles. 6x6 and 4x4

Mech.Engineer/ Manf. Engineering

Structural design, Basic stress analysis, provide tech. assistance to

Manufacturing during build of Prototype armored vehicle, Develop wood mock up

templates for ceramic armor. Develop assembly procedures for field retrofit kits.

Aug. 1994 to Dec. 1998 Livernois Engineering

Dearborn, MI.

Head of Engineering Dept. overseeing R&D Engineering, Product Design

Engineering and Manufacturing Engineering for Forward Industries supplying

nitrogen gas springs to the Automotive Industry.

Awarded patent for gas spring design

Organize and establish operational procedures

Lead, develop and generate procedures for ISO certification

Initiate, develop and execute MRPII software implementation for dept.

Head new product development team

Organize and develop standards and procedures for product and R&D testing

Develop and implement ISO 9001 and quality program.

Head and develop Engineering Dept. for Engineering Center providing

Engineering services for Program Management, FMEA's, FEA, Complete Design

Packages, Prototype, Fixtures, Producibilty, Component and System Testing and

Failure Mode Analysis.

Establish and maintain customer base (sales)

Identify and forecast Engineering resource requirements

Quote and schedule projects

Program manage projects to ensure completion with in schedule and budget

Responsible for project P & L

Types of projects: All projects automotive related; Bottle Jack, Seating production

assembly and check fixtures, Vibration fixtures and testing, Transmission

assembly tooling and fixtures.

Page 2 of 3

Resume Jeff Geske cont.

1988 to 1994 Southwest Mobile Systems, St. Louis, MO.

Senior Project Engineer

Heavy Equipment Transport: M-1000, 70 ton capacity Semi- Trailer:

This trailer was developed for the Army to transport the M-1 tank. The trailer has

10 axles 8 which are steerable and an independent hydraulic suspension.

* Prepare Eng. estimate for Israel Gov't program ($30 million contract)

* Responsible for Eng. budget on Israel Gov't program

* Saved 4 million dollars on an alternate bearing design.

* Direct incoming test data for reliability and maintainability evaluation.

* Coordinate corrective actions in response to equipment failures

* Develop and initiate corrective action reporting systems and Failure Review

Board

* Direct interface with the customer presenting corrective actions and explanation

of failures.

* Supervise assembly of first trailers to ensure proper fits, tooling and

dimensional integrity.

* Layout and design of trailer deck, steering and air brake system.

* Investigate and solve weld procedure problems

* Develop and supervise hydraulic test fixtures for life cycle testing

* Create tooling to solve close tolerance location problems

* Supervise 5 designers and 6 drafters

Aircraft Loaders: 25k Loader, Self propelled 25 thousand pound capacity with

variable height, roll and pitch features for the Air Force.

* Layout, design and installed cab control features electrical, pneumatic and

hydraulic

* Concept and design interface for hydraulics, pneumatic and electrical bundles

to articulated cab

* Generate test fixtures for palletized load simulation

1983 to 1988 Emerson Electric Co. Electronics and Space Div., St. Louis, MO.

Design Mechanical Engineer

M-109 Howitzer Improvement: An auto loading system for 155mm sh ells.

* Concept, layout and design hydraulic powered round guide extensions into the

cannon breech

25mm Naval Gun Mount (L-Cat 25): A single barreled bolt on gun mount for

small vessels.

* Layout and design full-scale wood mock up

* Concept, layout and design elevation and traverse gun stops

* Awarded for engineering contributions

TeamPack: A mobile communication shelter and antennas for the Army

* Layout and design mounting brackets for various electronic equipment.

* Generate top assembly drawings for fit, form and function

ASG-33: Rear gun mount for B-52 Four .50 cal. guns

* Design test fixtures for vibration testing and Radome testing

Page 3 of 3



Contact this candidate