Post Job Free
Sign in

Plant Management

Location:
East Liberty, OH, 43319
Posted:
March 09, 2010

Contact this candidate

Resume:

David A. Brenek

**** **. **. ***

East Liberty, Ohio 43319

Phone: 614-***-****

Email: **************@*****.***

QUALIFICATIONS

An accomplished manufacturing professional with over seventeen years experience with a world-class manufacturer.

Background includes designing, creating and implementing process management systems and administrative management

systems which had an emphasis on manufacturing efficiencies which were adopted company wide. Highly skilled in

business and project management with an emphasis on continuous process improvement resulting in significant cost

reduction and improved efficiency.

PROFESSIONAL EXPERIENCE

YUSA CORPORATION WASHINGTON COURT HOUSE, OH 04/2009 ~ 10/2009

Production Control Manager

- Responsible for all production planning and scheduling

- Managed Inventory control

- Responsible for all manpower and resource planning

- Responsible to develop and execute the departmental business plan

- Responsible to create and maintain the departmental budget

Accomplishments:

- Redesigned the manufacturing philosophy to improve product through-put

- improved internal production planning spreadsheets

- implemented new business division – (pass-through parts)

- assisted with economic downturn adjustments to maintain company profitability / viability

- identified non-profit workstation and currently preparing corrective action

- Developed and implemented “plant process engineering”

- Improving the accuracy of BOM (bill of materials) and MRP data (material requirements planning)

HONDA OF AMERICA MFG., INC. EAST LIBERTY, OH 10/1990 ~ 11/2008

Plant and Department Project Engineer/Leader/Bumper Paint Department, East Liberty Plant (07/2008 – 11/2008)

- Project Engineer for new business ventures

- Supported Honda’s Indiana plant start up efforts by conducting a new instrument panel paint line study

- Managed department’s labor account and manpower control

- Served as training and development facilitator for team leader and team coordinator development

- Department project leader for service parts including managing the manufacturing, shipping, and receiving of

parts for distribution to Honda’s motorcycle plant as well as American Honda

- Served as the lead for all departmental communication efforts

Accomplishments:

- Created a database program to automate department’s injection production data to more effectively evaluate

and track processes

Plant and Department Project Leader/Bumper Paint Department, East Liberty Plant (05/2007 – 07/2008)

- Plant project leader of Element Cladding in sourcing of plastic parts from a local supplier Conceptualized the

project’s SA (situational analysis), defined project’s organizational structure and established milestone

events to support the project’s critical path

- Revitalized department’s New Model training program and lead the team’s skill development

- Overhauled the department’s administrative functions to better support Honda of America customers while

providing accurate performance metrics to aid in problem solving and direction aimed at continuous

improvement

- Department administrative lead for manufacturing production, safety, environmental, cost, manpower

allocation, team morale and business planning

Accomplishments:

- Sourcing of plastic parts saved nearly two million dollars over a twelve-month period.

- The revitalized New Model training program was featured in an article in Honda’s “Wing” internal magazine

in May, 2007.

Dept. Manpower Controller/Process Engineering Advisor/Paint Dept., East Liberty Plant (04/2002 –05/2007)

- Department business planning, resource lead / process engineering advisor

- Established tracking, process engineering standards and management systems

- Supervised the utilization of PDCA (Plan, Do, Check, Action), MOST, time and motion studies, and

instability support methods to direct resource base determination consistency

- Advisor to the Assistant Vice President leader of Body Manufacturing Group (BMG) [4/2002 – /2006]

BMG = Stamping, Weld, Paint, Bumper Paint, Facilities)

- Lead BMG coordination efforts through business planning preparedness – long-term strategies

- Performed Critical analysis of BMG department monthly business planning scorecards to suggest corrective

action and track pending items to completion

- Responsible for creating operating expense, investment and New Model budgeting analysis, breakdown and

summarization for senior management review

- Compiled and composed group presentation for General Manager Reviews

- Collaborated with BMG group with In-direct efficiencies studies, EHR, Production Engineering Strategy

Committee, succession planning and recession toughness strategies

Accomplishments:

- Created an all inclusive management model that integrated corporate, plant specific direction into department

goals for investment, labor and expense planning strategies which helped clarify the business planning

process

- Customized PeopleSoft financial input to more accurately reflect daily department business

Plant manpower controller / ELP Manufacturing Planning Group, East Liberty Plant (02/1995 –04/2002)

- Facilitated business planning by developing and implementing resource controls through out each business

team.

- Defined / communicated manpower controller role and responsibilities

Accomplishments:

- Developed manpower and leave-tracking databases (Access)

- Designed, created and implemented (DPC) direct process coverage mainframe and management system

(adopted company wide)

- Established New Model-specific manpower tracking to improve model-specific costing

- Systematized strategic resource assignment tracking / reporting systems

Safety/Environmental Leader/ELP Manufacturing Planning Group, East Liberty Plant (06/1994 –02/1995)

- Facilitated company-wide cross-functional management structure / system

- Created and implemented development of plant safety and environmental compliance task management

through business planning objectives

- Established management triggers for regulatory understanding and compliance

Maintenance Staff Technician / ELP Facilities, East Liberty Plant (10/1990-06/1994)

- Operated and reported plant water/waste treatment systems in ordinance with state and federal regulations

- Treated and conducted testing as needed for: potable water, industrial water, waste water, steam boilers and

other systems

- Supported other maintenance systems, which required a complete understanding of plant physical

management and supply systems

EDUCATION

University of Findlay, Findlay, OH 09/1982 - 12/1987

- Bachelor of Arts degree / Individualized Major

PROFESSIONAL DEVELOPMENT/CONTINUING EDUCATION

- PSDM Problem Solving and Decision Making

- 7 Quality Control Tools

- 7 Management Tools

- TQM: Total Quality Management

- TQM II Workshop

- TQM Follow-Up

- 5P: 5 Principles for Problem Solving

REFERENCES

References are available on request.



Contact this candidate