Thomas D. Shropshire
**** * ********* *** #* Milwaukee WI 53219
Phone: 414-***-**** email: abnfwa@r.postjobfree.com
Summary
Sr. Industrial Engineer
30+ Years of consistent and measurable achievements in Work Measurement, Assembly Process
Development, Work Station and Line Set Up, Line Balancing, Process Documentation, Written and Graphic
Work Instruction Programs, and Implementation of Lean Methodologies.
Work Measurement
Creation and application of fair and accurate work standards for accurate product costing, line balancing,
and scheduling via expert use of work measurement tools, including the following:
• MTM
• MSD
• MOST
Time Study
Creation and Implementation of work measurement system Standard Data.
Assembly Process Development
• Creation of Efficient and Cost Effective Assembly Sequence and Standardized Work
Assembly Line Set Up and Ergonomic Line and Work Station Layout
Development and Implementation of Error Proofing Methods and Quality Checks to maximize First Pass Yield
Creative Line Balance Solutions to maximize labor resource utilization and minimize Downtime
Expert use of Assembly Line Balancing Software: LeanLine ® and AssemblyLinePRO®
Process Documentation and Work Instructions
Development of Comprehensive Process Documentation and Assembly Instruction
•
Programs
Creation of Clear, Concise, and Easy to Understand Instruction Documents
• Author of AssemblyLinePRO® software incorporating Process Development, Line
Balancing, and Total Process Documentation
• Experienced in both On The Job Training and Classroom Instruction
Experience
Phoenix Products Milwaukee, WI Feb 2009 Apr 2009
Industrial Engineering Consultant
Organization of Florescent Lighting product lines. Development of standard work, and identification of material and
tooling requirements. Establishment of Process Documentation and Work Instruction program using AssemblyLinePRO ®
software.
Terex Cranes Waverly, IA Oct 2008 Jan 2009
Contract Industrial Engineer
Re Balance of mixed model Rough Terrain Crane assembly line with inclusion of new model. Update of
Standardized Work and Graphic Instructions.
Terex Comedil Milan, Italy April 2008 Sept 2008
Industrial Engineering Consultant
Assembly process documentation of Self Erecting Crane Lines for implementation of Toyota Production
System. Facility layout, design, and balance of mixed model assembly line. Development of Standardized
Work and Assembly Instructions.
Thomas D Shropshire
Page 2
Terex Cranes Waverly, IA Oct 2006 Sept 2007
Contract Industrial Engineer
Assembly process documentation – Standardized Work for 40, 60, & 75 Ton Truck Crane Lines.
Development of elemental times and total product cycle times via time study. Work cell development, process
development, written and graphic assembly instructions for new 120 Ton Rough Terrain Crane Vehicle.
Progressive Images, Inc. New Berlin, WI May 2006 Aug 2006
Industrial Engineering Consultant
Development of Process Documentation/Work Instruction program for Wire, Cable, and Harness assembly
operations using technical illustration tools, Photoshop, and AssemblyLinePRO ® software. Training of in
house associates in development and application of process documentation.
CNH America New Holland, PA Dec 2004 May 2006
Contract Industrial Engineer
Development of Assembly Standard Data using MOST ®. Documentation, measurement, and balancing of
Agricultural Equipment assembly lines using StandardsPro ® and LeanLine® software. Project leadership and
supervision of junior IE associates.
Yamaha Motor Manufacturing Newnan, GA
Co Oct 2003 Apr 2004
Contract Industrial Engineer
Re balancing of Water Vehicle and ATV assembly lines and Sub Assembly operations using
AssemblyLinePRO® and LeanLine® software. Development of operational time values with MOST and
StandardsPro® software.
Phoenix Products Co Milwaukee, WI Oct 2002 Jul 2003
Industrial Engineering Consultant
Re organization of assembly facility to Cellular Manufacturing. Incorporation of Lean principles. Cost reduction
inititives including methods, layout, and tooling improvements. Introduction of Assembly LinePRO ® software
for standardized work, line balancing, and assembly work instructions. Training of in house manufacturing
staff.
H.B. Manard & Co Pittsburgh, PA Sept 2001 May 2002
Industrial Engineering Consultant
Productivity improvements and downtime reduction through work measurement, methods improvement, and
balancing of florescent light fixture assembly lines at client location (Lithonia Lighting, Cochran, GA), using
Maynard software MOST for Windows®, StandardsPro®, and LeanLine®.
Rockwell Automation Mequon WI Jan 2001 Sept 2001
Contract Manufacturing Engineer
Evaluation and replacement of product routing/mfg cost system for standard & engineered drive units.
SPX Robinair Montpelier, OH Nov 1998 April 2000
Industrial Engineering Consultant
Re organization of assembly facility. Productivity improvements and cost reduction initiatives through
assembly line set up, methods, and line balancing. Development of standardized Work Instruction format and
work instructions for new products.
J. I. Case Racine WI Nov 1995 Nov 1998
Contract Industrial Engineer
Re organization and consolidation of main transmission assembly lines. Assembly line balancing. Work standards using
(Computer) MOST®. Implementation of computer aided process planning software (KAPES ®). Development of new
work standards database using MOST for Windows ®.
Thomas D Shropshire Page 3
Fleck Controls/Pentair Brookfield WI Jan 1996 Sept 1996
Contract Manufacturing Engineer
Development and installation Just In Time/DFT assembly process for water softener valves and valve control
units. Development of written and visual process instructions.
Allen Bradley Motion Control Division Mequon WI Jan 1995 Oct 1995
Contract Manufacturing Engineer Development and installation of Wire Assembly and Wire Harnessing
Cells for AC and DC motor drive assemblies, including material supply and replenishment Kan Ban systems.
Magnetek Drives & Systems New Berlin WI Jun 1993 Aug 1994
Contract Industrial Engineer
Evaluation and upgrading of electro mechanical assembly processes, methods, and documentation.
Assembly line balancing. Implementation of Demand Flow Technology ®. Development of written and
illustrated method instructions. Throughtput improvements and standard cost reduction.
Eaton Corp/Cutler Hammer Milwaukee WI Nov 1988 Jan 1992
Contract Industrial Engineer
Development of work standards data base and standards application system for electro mechanical
assembly, stockroom, and punch press operations, using (computer) MOST ®. Methods and assembly
instructions, including technical illustration for assembly and wiring operations.
Education/Certifications
Aurora College Aurora IL 1975
Certified in M.S.D. (Master Standard Data) Serge A. Birns Corporation 1970
Certified MOST® Applicator H. B. Maynard & Co 1979
Demand Flow Technology® JIT Institute of Technology 1996
Certified in MOST® for Windows H. B. Maynard & Co 1997
Certified in MOST® Data Manager H. B. Maynard & Co 1997
Certified in StandardsPro® H. B. Maynard & Co 2001/2005
Certified in LeanLine® H. B. Maynard & Co 2001/2005
Certified in AssemblyLinePRO® TSF Manufacturing Solutions 2002
Military Service Schools
US Navy Engineman Class "A" Great Lakes, IL
US Army LARC V Amphibious Vehicles Ft Eustus VA
US Navy Air Conditioning/Refrigeration San Diego CA
US Navy Instructor Training Great Lakes IL