Post Job Free
Sign in

Power Plant Engineer

Location:
Coraopolis, PA, 15108
Posted:
March 09, 2010

Contact this candidate

Resume:

James Keibler

** ******** ***** **********, ** **208

412-***-****

OBJECTIVE: Geotechnical construction manager or general superintendent.

WORK HISTORY:

Dec. 2008-Present, Operating Engineer, Local #66, Operating Engineers, Pittsburgh,

PA: On call for projects that come in.

2005 to 2008, Superintendent, DGI-Menard:

• Sept. to Nov. 2008, Nordstrom’s Department Store, Braintree, MA:

Oversaw two large drill rigs for the install of 1,950 CMCs (Controlled

Modules Columns). Assured the quality of the pr4 mixed grout that

was delivered to the site in contract truck that had to be tested. Stayed

on top of the owners’ testing agency to remind them the slump needed

to be able to pump the grout though the drill head.

Made sure the drills were on top of the locations that needed to be

drilled, and that the drill tooling was vertical while drilling and

completing the hole.

Worked with the surveying crew on the layout to keep the job on

schedule.

Made sure we where drilling deep enough to reach the needed to

torque to compete the needed spec for all the engineers involved.

Installed 3 test elements and ran the tests with the ASTM quick load

pile test for all engineers involved with the site to assure that the loads

designed for the building were met.

• May to July 2008: 212 unit apartment building 8 stories high with a

parking garage, Everitt, MA:

Feb. to April 2008: Military Medical Facility, Fort Belvedere, VA:

Jan 2008 to Feb 2008: LNG plant for CBI Corp., Savannah, GA

August 2005 to Dec.2007: Ran work and helped to bid jobs for the company. Also

worked in the wick side of the business, running the work and installing the wicks.

Superintendent, More Trench, Jan. 2005 to Aug. 2005:

Oversaw installation of Micro Piles in construction. Drilled and installed large caissons to

support large towers for high-tension electrical wires.

• June 2005 to Mid July 2005: 10 large driven caissons for National Grid

Power Company, Providence, RI.

Jan 2005 to April 2005: 180 pc 100-ton 9 5/8 inch micro piles for apartment building,

Brooklyn, NY:

Superintendent, Nicholson Construction Company, July 1999 to Nov. 2004.

• June 2003 to Dec. 2003: AEP Wind Mill Farm. Straightened 15 125-meter

tall wind turbines, Trent, TX.

Dec. 2001 to May 2002: LGE power plant. New SCR unit 400 100-ton micro piles in

large gravel or river rock, Louisville, KY.

July 2001 to Nov. 2001: District Gas: Installed 250 200-ton Micro piles using 7-inch

pipe, Everett, MA.

• Aug. 2000 to Nov. 2000: AEP power plant, 300 100-ton Micro piles for an

SCR unit inside the plant, Charlotte, NC.

Jan. 2000 to June 2000: New docking moor for a cruise ship: Installed 7804 strand

120 Kip anchors though steel sheets, Port of West Palm, FL.

• July 1999 to Nov. 1999: Bridge, Cape Gerardo, MO.

CERTIFICATIONS AND LICENSES:

10-Hour OSHA Certification

CPR First Aid Training

Certified Crane Operator

Forklift License

40-Hour Hazmat Training.



Contact this candidate