Darren DeVriese
**** ******** ** ( Grand Rapids, Michigan 49546 616-***-**** (
abne8o@r.postjobfree.com
Lean Manufacturing Leader - Strategic Planning - Significant P&L results
SUMMARY OF QUALIFICATIONS:
Confident, results oriented manufacturing leader with demonstrated
abilities in implementing change management solutions to drive strategies
and profitability in challenging times. Strong technical background and
demonstrated capabilities in Lean manufacturing to motivate and influence
teams to achieve sustainable accomplishments. Proven ability to translate
strategic plans into attainable objectives and results. Key strengths
include: Versatile, decisive, determined, competitive, persistent, creative
problem solver who is not afraid to take a bold and progressive approach to
exceed goals.
Professional EXPERIENCE & accomplishments:
Factory Manager -Magna Mirrors, Holland, MI
Nov. 2006 to Present
Responsible for leading team covering manufacturing engineering,
production, new product introduction, maintenance, quality, cost,
developing supplier partnerships, and design engineering. Responsible for
developing strategic growth plan, new product launches, personnel
development, managing customer relationships, and leading the lean
manufacturing transformation.
. Led Magna task force to integrate Plastech acquisition to a Magna
facility.
. Developed and implemented world class lean process that reduced
manpower by 45% in the assembly operation.
. Employed six sigma techniques to improve outside mirror production by
75% in 4 months.
. Improved key customer quality performance from 1100 PPM to 9.
. Identified and developed team to build future state map for final
assembly resulting in 25% reduction in labor.
. Led growth of business by 100% in one year while reducing labor.
. Identified key issues in MRP system that improved Schedule Attainment
from 85% to 100%.
. Lean process benchmarked inside and outside of the industry.
Plant Manager - Johnson Controls Inc., Holland, MI
Sept. 2005 - May 2006
Launched new seat track business with sales of $120 million per year. Led
11 Managers in all areas of manufacturing and support staff. Created profit
plan for successful launch, designed Kanban system for material flow, and
capacity utilization plans. Instrumental in developing policies and
procedures needed to launch the plant best in class. Full P&L
responsibility for seat track business.
. Reduced cycle times by 150% in two weeks through Kaizen activities and
people movement techniques.
. Developed and validated vibration technology as alternative to sound
testing that resulted in cost avoidance of $4.3 million.
. Developed Lean manufacturing system utilizing Kanban.
. Mentored managers and team members in developing lean manufacturing
system.
. Developed employee handbook to retain non-union status.
Director of Engineering and Manufacturing, RH Sheppard Company, Hanover PA
Nov. 2004- Aug. 2005
Drove effort for 500 employees in five manufacturing sites, including 11
direct reports with responsibility for manufacturing, engineering, quality
and maintenance at this Tier one supplier to heavy truck industry in
steering gear. Led company in developing policies and procedures to
improve profitability and performance. Initiated Lean activities
companywide that developed outstanding results.
. Improved scrap from 18% to 5% in 5 months by training staff in basic
problem solving techniques, realizing a $300,000 savings.
. Improved uptime on key equipment by 11% by designing an effective
Preventative Maintenance program.
. Reduced turnover rate from 40% to 22% in 6 months by developing
comprehensive strategy for employee retention.
Ford/Visteon, Dearborn, MI
1993 to 2004
Product Stream Manager,
2001-2004
Engineering Manager, 1997-
2001
Facilities Engineering Manager,
1996-1997
Design Engineer, 1993-
1996
Responsible for developing the manufacturing strategy for continuous
improvement in process and design of manufacturing flow. Led development
and training of employees in lean manufacturing strategies.
. Coached team in developing new manufacturing process that reduced
operating costs $3 million annually.
. Improved parts per labor hour by 57% by aligning team to work on top
three issues.
. Developed strategic business plan that grew Injector business from two
million to seven million units in two years.
. Reduced injector PPM from 800 to five utilizing Kaizen activities and
design improvements.
. Reduced injector leakage fallout from 15% to .25 % by developing system
to react quickly to issues and eliminating root causes.
. Developed data base for tracking and solving worker suggestions that
resulted in $1million in savings in first year.
. Improved alternator scrap from 15% to 1% by energizing the team to
solve issues.
. Motivated workers through Kaizen activities to develop plan for
improving high failure mode from 3% to .1%.
. Member of divisional marketing board chartered with developing
divisional strategic plan.
. Member of R&D team for direct injection program.
Caterpillar Aurora, IL 1989 -
1993
Manufacturing Engineer,
1992-1993
Purchasing Engineer,
1991-1992
Production Supervisor, 1989-
1991
Responsible for improving manufacturing processes in wheel loader market
segment.
. Developed new process for low volume manufacturing resulting in
$200,000 in annual savings utilizing existing capital equipment
. Reduced cost in sheet metal sourcing by $100,000 through program to
maximize material utilization.
EDUCATION & TRAINING:
MS, Manufacturing Engineering, Northwestern University, Evanston, IL
MBA, Operations Management, Northern Illinois University, DeKalb, IL
BS, Physics, Eastern Illinois University, Charleston, IL
Certified Kaizen facilitator
Dale Carnegie
Numerous Quality Training programs including but not limited to: Six
Sigma, Lean manufacturing, andTS16949 and QS9000.
AWARDS & RECOGNITION:
Published Society of Engineers paper on Injector Performance.
Patent on fuel injector design.
Visteon Quality awards 2001 and 2002.