ERNEST HINEGARDNER
***** ****** **** ****: 540-***-****
Fredericksburg, VA 22408 ************@*******.***
QUALIFICATIONS SUMMARY
Organized, results-oriented VP/General Manager with experience and
responsibility for entire business delivery process including sales,
materials, manufacturing, distribution, and ultimately the P&L. Proven
ability to motivate teams and manage conflict. Leader in promoting and
supporting continuous improvement and LEAN initiatives (kaizen, poka-yoke,
5S, and visual factory). Strong team builder. Operated division with
little direction. Entrepreneurial approach to running an operation.
PROFESSIONAL HISTORY
TruTech Doors USA, Inc., Fredericksburg, VA 2009-Present
$50M multi-national manufacturer of exterior door systems.
General Manager
Responsible for start-up and continuing operations for Division including
sales, customer service, engineering, operations, EHS, materials, IT, and
HR.
. Started up operations from asset sale to financial breakeven status in
4 months.
. Established list and net pricing, terms and conditions, technical
manuals, and product samples for sales force.
. Initiated ERP system implementation.
. Developed complete start-up budget for US operation including sales
volume, direct material, direct labor, and variable as well as fixed
overhead.
. Achieved EPA approved operating permit in 5 weeks in contrast to State
of Virginia lead time of 14 weeks.
Therma-Tru Corporation, Fredericksburg, VA 2004-2009
$400M multi-national manufacturer of #1 consumer brand of steel and
fiberglass door systems.
Plant Manager (2007-2009)
Responsible for safety, quality, delivery, productivity, and P&L of non-
union 300 associate facility with 3 separate operations: steel edge doors
and frames, customer displays, and Lowe's products.
. Grew facility from $25M to $75M by consolidating 2 out-of-state plants
into existing plant in Virginia.
. Improved Lowe's COQ ~28% through analysis of customer return data
including Lowe's product specifications, BOM accuracy, raw material
accuracy, and inspection processes.
. Reduced primary plant foot print 32% by reducing raw, WIP, finished
goods, and leaning out operations. Utilized recovered space and
leased additional buildings for total footprint of 200k square feet.
This allowed for plant consolidation of 3 businesses into 1 facility.
. Volunteered to be first plant to implement Behavior-Based Safety
program. Improved recordable rate 42% and DART rate 60%.
. Closed entire operation down 3+ months ahead of schedule and $250K
below budget.
Operations Manager (2005-2007)
Responsible for LEAN initiatives, materials, manufacturing, quality, and
distribution operations in steel door and frame manufacturing plant.
Managed 135 associates on 2 shifts.
. Improved inventory turns ~35% by analyzing the supply chain process.
Developed visual pull system with suppliers, key raw materials, and
manufacturing work stations.
. Improved productivity 25%+ thru kaizen events focused on bottleneck
operations, implementing poka-yoke setup processes, automation, and
flexing labor between work stations as needed.
. Reduced cost of quality ~50% utilizing poka-yoke techniques to improve
setup speed and accuracy, focus on 1st piece changeovers, line
inspection processes, and packing changes.
. Increased on-time shipping performance to 99% while reducing lead
customer lead time from 15 to 10 days by improving material
availability, reducing equipment downtime, and flexing labor.
. Accepted 4 month assignment in UK plant to implement raw material
kanbans, WIP kanbans, and establish manufacturing metrics.
Ernest Hinegardner Page 2
Senior Material Analyst (2004-2005)
Implemented MRP and Scheduling modules for new ERP system.
. Debugged MRP issues for all plants.
. Initiated corporate S&OP process.
. Taught managers to use S&OP process to drive accurate manning and
material planning.
The Campbell Group, Leitchfield, KY 1994-2003
$500M multi-plant ISO 9000 world leader of #1 consumer brand of powered
equipment.
Distribution Manager (2002-2003)
Managed distribution operations of compressor business for power retail
customers. Responsibilities included 3 multi-site DC's, customer service,
operations, engineering, budgeting, and staffing. Managed 90 employees,
24/7 operation.
. Improved complete and on-time delivery to 98%+ by improving inventory
accuracy, performing kaizen events that led to rearranging the
warehouse picking operation to improve accuracy and speed, and
implemented an IBM warehouse bar code system that interfaced with the
new ERP system.
. Directly responsible for $4.5M annual operating budget.
. Evaluated potential for outsourcing West Coast DC to 3PL. Analysis
led to closing West Coast DC and opening 2 new local DCs.
Manufacturing Manager (1998-2002)
Responsible for assembly operations of compressor business including
production, quality, engineering, budgeting, and staffing. Managed 200
employees including team leaders, manufacturing engineers, quality, and
production.
. Improved efficiency and productivity >35% by implementing line
balances and rearranging assembly lines to focus on specific product
lines.
. Reduced line fallout 25% by using SPC techniques on assembly lines.
. Assisted in developing and implementing world-class powder paint
system.
. Key contributor maintaining non-union environment in year-long
campaign from card signing to vote.
Focused Factory Manager (1997-1999)
Charged with assembly, screw machine, and stamping operation for Powerwinch
business including production, quality, materials, budgeting, engineering,
and staffing. Managed 30 employees, including team leaders, quality,
schedulers, planners, manufacturing engineering, and production.
. Increased inventory turns 200% by vertically integrating materials
with operations.
. Improved throughput (cycle time) 33% by reducing changeover time.
. Utilized Sales and Operations Planning (S&OP) process to support
business objectives.
Purchasing Agent (1994-1997)
Purchased raw and component materials for Powerwinch business, plant MRO
supplies, and other commodities.
The Dometic Corporation, Elkhart, IN
1990-1993
$200M appliance and awning manufacturer for the RV industry.
Purchasing/Planning Manager
Responsible for $65M in raw, component, and MRO purchases, service parts
scheduling, raw material inventory, and coordination of material and
planning from concept through final production. Managed four
Buyer/Planners and an MRP Buyer.
Ernest Hinegardner
Page 3
Whirlpool Corporation, St Joseph, MI
1986-1990
$6.5B worldwide major appliance manufacturer.
Buyer
Responsible for supplier selection, purchase contracts, negotiations, and
design reviews for $45M in purchased commodities. Duties included
approving control plans, SPC charts, and X and R charts from suppliers.
Recruited buyers and served as an advisor for MBA students.
Schnippel Construction, Botlkins, OH
1984-1986
$6M commercial construction general contractor.
Purchasing Agent
Responsible for supplier selection of purchase components, supplies,
negotiations, and sub contractors within established budgets. Interpreted
project blueprints and project specifications to source work required.
EDUCATION & TRAINING
MBA, International Business
Indiana University, South Bend, IN
BS, Production & Inventory Management and Procurement and Materials
Management
Bowling Green State University, Bowling Green, OH
Leadership Essentials, Therma-Tru
LEAN Manufacturing Certificate Program, University of Michigan
APICS - Execution and Operations Control