EXPERIENCE
Test Engineer (2008– to 11 2009) UDS, Piketon OH and Paducah KY
• Wrote Conversion Unit Test Plan, 24 Conversion Unit Test Instructions, and performed Conversion Unit testing
for the UDF6 Conversion Systems
Program Manager (2004– 2008) Honeywell, Piketon OH / Oak Ridge TN
• Program management of final assembly and test of uranium gas centrifuges systems
• Generated proposals and plans, associated Task Orders (TOs), Basis of Estimates (BOEs), and schedules
required for completing Centrifuge Assembly efforts at Piketon
• Interviewed, hired, and trained the team of 30 personnel to fulfill requirements for completing Honeywell
Centrifuge Tasks at Piketon
• Managed teams that performed final assembly and test of uranium gas centrifuge program
• Managed program status, reported status to customer and Honeywell management the contract compliance
tracking, and project scheduling and tracking
• Defined and managed budget
• Set and managed schedule/scope
• Determined functional goals and metrics
• Managed teams to develop assembly and test procedures at USEC Oak Ridge and USEC Piketon facilities
• Arranged testing and training of Honeywell and contract personnel at Piketon
• Resolve engineering, scheduling, cost, quality, delivery, and customer issues
• Developed and maintained good working relationships with USEC in Oak Ridge and Piketon to negotiate and
meet program and customer requirements
Project Manager (2001– 2004) Waukesha Electric, Milpitas, CA
• Responsible for estimating, installation, and testing of power transformers.
• Negotiated projects through contract commitment stage.
• Developed overall project schedules and optimize resources to ensure criteria is met
• Wrote and reviewed procedures to meet customers’ requirements.
• Ensured projects were completed within all constraints including documentation and supplied appropriate test
data and certifications.
Owner / Project Manager (1998–2001) CED Inc. Construction Company Bay Area, Northern, CA
• Acquired four small construction companies, hired key personnel to raise the professionalism and insure
productive integration, and developed company into the preeminent remodeling company of the Bay Area in Northern
California. Then sold the company along with acquired Emporium Home Services construction service contract, four
(4) Four Seasons Franchises, window replacement procurement/installation contract, and contracts with various
solarium manufactures.
Sr. Project Manager (1994–1998) AlliedSignal Corp., Torrance, CA
• Evaluated and determined development/production testing using existing STE for the International Space
Station (ISS).
• Designed, documented, performed analysis, and met Sensor Performance Insitu Testing compliance criteria for
all flight hardware for ISS including JEM, and SECAN.
• Wrote Source Controlled Drawings (SoCD) and Statements of Work (SOW).
• Presented and exercised risk analysis of trade offs and successful work arounds to Boeing even with delays due
to component shipping damage.
• Promoted to Cost Account Manager (CAM) for $6M Space Station Crew Quarter’s Pressure
Control/Monitoring Assembly (PCA) project.
Tebelak
• Responsible for system engineering, successful design, fabrication, assembly, integration/test, and verification
of the PCA.
• Developed overall project schedules and optimized resources to ensure interface criteria met Envelope
Document (ED) requirements.
• Designed, documented, and met compliance criteria for flight PCA. Managed and development testing
requirements.
• Developed and presented technical briefings and PDR/CDR to NASA and Boeing.
• Presented risk analysis of trade offs and work arounds to Boeing.
Hardware Development / Systems Engineer (1992–1994) AlliedSignal Corp., Torrance, CA
• Managed Sensor Project for Space Station Program to successful completion.
• Responsible for integration/test and SoCDs of sensors for Space Station systems
• Selected sensors, associated calibration equipment, test stands, and instrumentation needed to meet system
requirements.
• Directed support engineers/designers and selected vendors and subcontractors.
• Evaluated Sensor Project and identified problems including noncompliance with specifications and contract
• Redesigned sensors and modified Boeing/AlliedSignal requirements to meet NASA overall Space Station
system requirements.
• Developed and presented technical briefings including PDR/CDR to NASA, and Boeing.
• Reviewed, evaluated, and wrote responses to compliance criteria documents.
Systems / Sr. Instrumentation Engineer (1983–1992) Garrett AiResearch, Torrance, CA
• Designed systems for instrumentation, control, and data acquisition of the following systems: centrifuge
balance stands, LH2 heat exchangers, actuator test stands for aircraft and missiles, test facilities for fuel controls,
turbines, fly wheels, and heat exchangers, electric trains, environmental test chambers, and physical property test
stands.
• Interviewed, selected, and mentored engineers and technicians.
• Developed problem statements and produced cost estimates, schedules, and staffing
• Designed unique test setups and optimized test equipment for specific applications such as: Space Plane,
centrifuges, magnetic coupling, NAK motor, non contact displacement measurements, chemical laser, and low noise
high speed data acquisition systems.
• Conducted development testing programs. Reviewed and interpreted test data. Made recommendations in case
of failures or unusual test developments. Conducted progress review meetings with customers. Consulted in the
preparation of specifications, reports, and proposals.
COMPUTER SKILLS
Microsoft Word, Excel, Power Point, and Project
SECURETY CLEARANCES
Department of Energy (DOE) Q with C24
PROFESSIONAL AFFILIATIONS
California Professional Control System Engineer, No. CS4711