Post Job Free
Sign in

Engineer Project Manager

Location:
Crookston, MN, 56716
Posted:
March 09, 2010

Contact this candidate

Resume:

Peter J. Van Erem

*** ****** ***.

Crookston, MN 56716

701-***-****

********@***.***

CAREER GOAL

Senior Manufacturing/Lean Engineer

SUMMARY OF

QUALIFICATIONS

Highly energetic Manufacturing Engineer/Continuous Improvement Project Manager with excellent Lean

skills, team building background. More than 10 years combined manufacturing and culture changing

expertise. Facilitator of kaizen projects; introducing Production System, 5S, waste elimination, optimizing

assets, reducing labor 40% and other continuous improvement efforts throughout the organization.

Develop Lean training material for all Engineers, Managers, Supervisors and operators throughout global

operations.

EDUCATION

B.S. Manufacturing Engineer Lean Six Sigma Black-Belt 2007

Silver Lake College Manitowoc, WI ACMA Certified Composites Technician 2009

Graduated with honors (3.75 GPA) B&K Noise, Vibration Harshness Testing

Bruel & kjaer 2005

A.S. Civil Engineer Technology

Michigan Technological University

Houghton, MI

EXPERIENCE

8- 2005 to LM Glasfiber, Inc.

Present Grand Forks, ND

Duties Include(d) Engineering Manager (2005 - 2006) - Project Manager of Continuous Improvement

(2007 to current) – Wind Turbine Blade Manufacturing Plant. (CCT - Certified Composites Technician)

Facilitator of lean manufacturing, value stream analysis and overall continuous improvement initiatives for

world class leader of composites wind turbine manufacturing. Leader of several major kaizen events,

increasing productivity, decreasing cost, and improving quality. Develop current 5S, 6-Sigma, Lean and

Production System training programs, production support, Engineer Change Orders and deviations.

3- 2003 to Polaris Industries

8- 2005 Roseau, MN

Senior Manufacturing Engineer

“Ranger” all terrain vehicle Manufacturing Engineer and all brake/strut assembly components. New

product development for independent rear suspension and Ranger “RZR” for favorable introductions,

packaging methods. Conducted lean research allowing line capacity increases of 30 – 40%. Performed

Make vs. Buy investigation to realize above average cost reductions. Lean implementation and

automation justification/implementation, ECN’s, PFEMA, DFM and production support.

1999 to Ansul/Tyco International

2003 Marinette, WI

Manufacturing Engineer-Fire Suppression Equipment Assembly Plant

Production support; plastic injection, welding, machining, hot metal spinning, sheet-metal and painting

areas. Automation introduction, justification. Researched and implemented hose crimping assembly for

cost savings more than $600k/annually and reduced inventory cost, automated packaging development.

1997 to USSI (Utility Sales and Service) Inc

1999 Appleton, WI

Applications Engineer Internship - Utility truck assembly

Sales support, estimating/quoting all equipment exceeding $1,000/unit. Continuous improvement efforts

supporting supplier price negotiations, bidding process and sales efficiency. Increased sales from $7

million to $21 million dollars during two years of internship by improving quoting process.



Contact this candidate