DONAL J. DOHERTY
***** ******** *****, ******, ** 35613
Home: 256-***-****; Cell: 256-***-****
Email: *****.*******@***********-***********.***; ******@*****.*** [pic]
PROFESSIONAL OBJECTIVE
To obtain a senior level project, research or engineering position
utilizing communication, analytical, problem resolution and planning
skills to improve process efficiency to increase program
implementation, test, and evaluation; accuracy and quality for an
engineering company.
PROFESSIONAL EXPERIENCE
Continental Corporation, Huntsville, AL 2006- Present
Project Manager: Responsible for New Product Launch within Siemens and
Continental. Managed design and implementation team for Telematics
programs within the company. Integral part of the R&D Program team to
transfer Design for Manufacturing/Design for Quality/Design for Cost
philosophies into the Project Life cycle facilitating a Lean
manufacturing with minimal R&D budget spend process. Proven ability to
prepare and coordinate technical portions of Requests for Proposal,
including source selection evaluation criteria. Proven ability to
translate user requirements into technical objectives pursuant to the
design, development, qualification and field support. Prepared
solicitation requests for major system and sub-system requirements.
Facilitated contract negotiations. Proven experience performing
engineering project task management functions such as providing cost
estimate, in developing project/program plans, tracking project status,
and providing technical reports/presentations in adherence with CMMI and
EVMS. Experience with manufacturing configuration control, engineering
change control, capacity planning, metrics creation and Statistical
process controls. Advanced knowledge of SAP, Lean Concepts, Continuous
Improvement.
Launched a ~$700M Siemens/Chrysler Telematics project in 2008, which
came in 35% under launch capital & cost budget and manufacturing cost
was ~40% less than its predecessors, while beating its quality targets
in 1st year by 81%.
Launched a ~$350M Continental/Chrysler Telematics project in 2009, which
came in 60% under launch capital & cost budget, while also being at
targeted manufacturing cost and launch quality targets.
Wright-K Technology, Huntsville, AL 2004- 2006
Project Manager: - for special projects in Automotive, Aerospace,
Appliance & Pharmaceutical industries in the South West. Quoted new
capital equipment projects for industries in the Southwest. Managed the
R&D, Design, development, fabrication, assembly, debug, validation,
installation, acceptance and sign-off of projects to our customers.
Quoted ~$20M in jobs and delivered ~$5M in jobs between 2004 & 2006.
Negotiated contracts with sub-suppliers, responsible for acquisition of
systems, prepared solicitation requests, instrumental in web-based
contract awarding system for company and customers. Instrumental in
technical systems performance parameters, contract scopes of work, work
breakdown structures, subsystem technical specifications & contract
milestones. Conducted in-depth Cost Analysis studies, Economic Analysis
studies & Design to Cost studies involving research & methodology,
studies & estimates, data base, verification & validation control.
Experience with aviation and missile systems as applied to life cycle
quality engineering programs. Provided quality oversight for the
establishment and implementation of flight safety parts/critical safety
item (CSI) program including identification of CSIs, processes and
control requirements, test and inspection requirements and verification
of frozen processes and planning.
Broad knowledge and experience in science and engineering associated
with design, development, test and evaluation of space and missile
defense systems. Knowledge and application of methods and practices
used in strategic planning, business strategies, performance measures
and statistical analysis.
Celtic Transcripts Ltd, Tullahoma, Tn & Ireland 2002- 2004
Operations Manager: - Founded and developed an IT business. Secured $2M
in venture capital. Specified and built a custom building for
IT/Telecoms business. Worked with local authorities to implement
strategy for rural broadband service and realized a cost competitive
broadband solution that worked for our business model. Developed
unique integrated system to system software packages to resolve broad-
spectrum incompatibilities and deliver cost effective and efficient
business solutions. Delivered audio-to-written and proofed transcripts
for Medical, Legal and Financial companies throughout the U.S. and U.K.
Employed 46 people and generated $6M in turnover by year 3. Sold
company to Telecommunications company in Europe (2004).
Donegal HealthCare, Ltd., Letterkenny, Co. Donegal 2001-2002
Principle Engineer: - Responsible for engineering projects and new
product launches. Developed new IV Bag production Line for Fresenius
Kabi. Re-Engineered two (2) $3M production lines that were operating
at 60% of cycle time. Introduced Lean Cell concepts and SMED
philosophies that brought the lines to 160% of designed cycle time,
increasing output from 17K units/week to 75K units/week. Conducted in-
depth Cost Analysis studies, Economic Analysis studies & Design to Cost
studies involving research & methodology, studies & estimates, data
base, verification & validation control in accordance with FDA and
Healthcare protocol. Implemented a production and scrap monitoring
system that reduced the scrap levels from 12% to 1%. Process
improvement projects were implemented in a 5 month timeframe without
capital equipment expenditure.
Intel Corporation, Ireland & US 2000-2001
Lithography Manufacturing Engineer Team Lead: - Responsible for new
product introduction in the Lithography department, where the highest
cost core technology machines reside. Responsible for capacity
planning and new equipment purchasing and installation. Responsible
for impact mitigation of production facility while removing obsolete
equipment and installing new generation $10M+ equipment units.
Consulted on specific technical aspects of the systems, construction,
and concept development of portions of New Product launches. Installed
~$300M of equipment in 12 months. Resolved the long-standing
transition problem between P856 and P858/9 technologies.
Wright-K Technology, Huntsville, AL 1997-2000
Project Manager: - for special projects in Automotive, Aerospace,
Appliance & Pharmaceutical industries in the South West. Quoted new
capital equipment projects for industries in the Southwest. Managed
the R&D, Design, development, fabrication, assembly, debug, validation,
installation, acceptance and sign-off of projects to our customers.
Quoted ~$80M in jobs and delivered ~$15M in jobs between 1997 & 2000.
Focused on problem resolution skills with teams to facilitate unique
methods of achieving project objectives for customers. Point of
contact for planning, coordinating & directing the analysis of Cost
Analysis Requirements Document (CARD), considering technical systems
performance parameters, contract scopes of work, work breakdown
structures, subsystem technical specifications & contract milestones.
Conducted in-depth Cost Analysis studies, Economic Analysis studies &
Design to Cost studies involving research & methodology, studies &
estimates, data base & validation control.
T&N Group, Rugby, U.K 1994-1997
Project Engineer: - Responsible for new product introduction and
production technology roll-out amongst 400+ companies throughout the
T&N Group. Companies were located throughout all European countries,
Asia, Africa, Australia, Far East & North America. Spent 6 months to 1
year in selected facilities, identifying production improvements and
implementing new process technologies and targeting new products in
strategic areas.
Implemented advanced technology projects such as "Elliptical piston
machining", Development of 10 micron coating processes for "Multi-
layered steel gaskets, design and development of topographical FTIR
laser measurement system. Subsequently found that the FTIR system that
we developed in 9 months had the same characteristics and results as
the Materials analyzer aboard the Mars Pathfinder robot.
EDUCATION
Bachelor of Science - Mechanical & Electrical Engineering, University of
Ulster at Jordanstown, Belfast, BT370QB, N. Ireland, U.K. - Graduated top
of class with 1st Class Honors (Summa cum laude), Project Management
Professional (PMP)