Mohammad Reza Sabouti
* **** ** ******** **** Ontario L4S 2E8 647-***-**** abn9fj@r.postjobfree.com
Construction Estimator
Professional Highlights:
Construction estimator with a 8 year record in reinforce concrete and steel structure construction projects
•
particularly in heavy industrial, from start to finish and being able to perform layout work efficiently
Ability to review proposal specifications, contracts, interpret blue prints and drawings as well as formulate
•
reports
Wide knowledge of estimate, cost control, purchasing, negotiations and safety in heavy excavation
•
specifically
Skilled in scheduling for estimates and projects, and perform complete estimates on projects consisting of
•
material take off, pricing, and presentation of the estimate for management review
Proficient in accumulates, evaluates, and documents historical cost data and construction procedures and
•
methods in order to maintain current estimating standards and databases
Excellent computer skills including Microsoft Office (Word, Excel, Outlook), trained and experienced in
•
Microsoft Project, Auto CAD 2D, 3D and Tekla Structure (X Steel)
Strong communication, team oriented, problem solving, analytic and time management skills
•
Willing to travel
•
Professional Experience
Construction Estimator Senior
Rasha Kamyar Construction Co., Iran 2010
2012
A contractor with a history of twenty years in oil/gas and petrochemical industry with the capability of managing
and implementing multidisciplinary engineering, procurement and construction projects
Project: Onshore Facilities Liquid Processing & Utilities (EPC2), 2011 2012
The largest gas field project shared between Iran and Qatar. The Iranian part of the field holds 14 trillion cubic
meters of in situ gas equivalent to 8 percent of the world’s total associated gas reserves. The company was civil
subcontractor and the project’s prime contractor was Dalim of Korea, Kayson, Sazeh and IIND of Iran (DSKI Joint
Venture) www.kayson.ir
• Provided bill of quantities preparation, tender documentation, tracking project progress, monthly reports
and invoices and various types of estimates in standard templates
• Analyzed cost reports and prepared cost comparisons for review or implementation by project manager
• Attended to weekly meetings with supervisors and/or representatives of Joint Venture for delivering work
progress reports, discussing problems and providing solutions
• Developed and coordinated a schedule of activities to meet timelines and deliverables outlined in the project
plan, resolve issues and recommended other action as necessary
• Negotiated a new working plan for 900 workforce based on the climate/season and achieved 10% saving in
budget and 5% on timeline
• Received a commendation award for investigating very effort in all engineering services from the company
Achieved to execute successful construction work including 858,000 cubic meters of excavation, 4000 cubic
•
meters of concrete placing, 9000 tons of steel structure’s erection and 18000 square meters of masonry
walls’ construction
Project: Oil Desalting Unit3, 2010 2011
The prime contractor in procurement and civil to build a process unit on oil refinery that will be able to process 120,000
barrels per day of crude oil
• Prepared material take offs from construction details, sketches and drawings in terms of the cost estimate’s
purpose
• Evaluated scope of work and other factors impacting cost of proposal from documents and contract.
• Produced comprehensive estimate review packages for project and client reviews
• Assisted project manager on all civil priorities, field inspection, procedure and budget
• Analyzed project and material requirements and managed purchase and lease of all equipment and prepared
all cost estimates for same
• Developed and implemented a successful plan for excavation of an industrial lagoon to achieved 20% saving
time on schedule
Construction Estimator 2008
2010
Behsakht Farzae Jonoub Co., Iran (www.behsakht.com)
A privately held engineering and construction company in heavy industrial civil projects providing world class
design, management, procurement and construction services to develop, engineer & build projects for clients
Project: a) Oxygen & Nitrogen Package Plant b) Earth Reservoir Rectification
The project's scope of work involved civil and structural works, employed over 600 workforce at 2 locations of
Maroun petrochemical site plan. The project foreign partner was Fortune Ltd, China
• Increased company profit up to 30% by recommending claim settlement based on the negotiations and
calculations on the scope changes of the project
• Reviewed contractual documents and contract modifications to determine scope of work and scope changes
• Prepared and summarizes task and subtask estimates, including rate and unit cost determination and
performing mathematical calculations by applying standard factors
• Provided leadership and direction in establishing the civil, structural specifications for new facilities
• Prepared detailed breakdown of components and elements of estimates for civil and structural works
• Supervised the activities of all subcontractors and ensured compliance to all project schedule and budgets
and evaluated all associated equipment and workforce to meet all design requirements
• Coordinated work with other disciplines, project management team and sub contractors
• Prepared cost control, cost estimates, monthly and final invoices, produced statements of quantities
• Reviewed EPC contracts and worked in an EPC environment
Construction Estimator 2005
2008
Arsa Int. Construction Co., Iran (www.arsa.ir)
The company is founded private as joint stock incorporating the most experienced staff in the fields of construction
especially hydro engineering, foundation engineering, energy, oil and gas, petrochemical and mining
Project: Wide Plate Mill
The wide plate mill project was built on a 150 hectare site and the project’s foreign consultant was Danieli Ltd,
Italy
Coordinated material delivery to the job site, following up on discrepancies or variances
•
Prepared material "take offs" and systematically estimate costs
•
Developed working drawings from sketches of structure layout, plans, sections and elevations
•
Designed all work plans and identified and resolved all installation issues for the project and coordinated
•
with procurement unit to ensure adherence to all construction schedule
Developed and maintained efficient communication with all sub contractors and clients
•
Reviewed civil and structural engineering and construction work packages, including drawings and
•
specifications
Performed civil engineering duties in the construction project including 1100 tons of reinforcement, 50000
•
cubic meters of concrete placing, rammed of 4000 fabricated piles and 18000 meter of transmission line
Education & Certifications
Bachelor of Science in Civil Engineering Islamic Azad University of Noshahr Chalous, Iran 2006
Field Survey Certification – Surveying College, Management & Planning Organization, Tehran, Iran 2006
Tekla Structure Software (Xsteel) Certification–Civil House College –Tehran, Iran 2012
Microsoft Project Software Certification –Tehran Technical Complex Rasht, Iran 2012
Registered as a Professional Engineer (P.Eng) by PEO 2013
Further information and all references available upon request