Post Job Free
Sign in

Manager Project

Location:
Defiance, OH, 44844
Salary:
$85000
Posted:
February 07, 2013

Contact this candidate

Resume:

Charles F. Frankart

**** **** ***. **.**

McCutchenville, Ohio 44844

419-***-****

**/**/****

Objective; To obtain employment with a stable company, where utilization of

my thirty plus years of hands on experience in manufacturing, maintenance,

production, continuous improvement and cost down activity will benefit a

company and its team members and provide an opportunity to grow within the

company.

Experience;

Nov. 2002 - Oct. 2012 Bucyrus Precision Tech,Inc - Bucyrus, Ohio.

Supplier of transmission shafts for Honda.

Manufacturing 1 Manager - My responsibilities were to manage the

Safety, Quality, Cost, Machine downtime, Production and Efficiency of the

Cold forming, Heat treat, Countershaft, Oil hole, Induction tempering and

deburring areas. It was also my responsibility to schedule the delivery of

the raw material to the plant and the production plans for each department,

based on customer demands. I was Project Leader for three different Quality

Circle groups and also the Project Leader for the new counter shaft job

launch.

Nov. 1995 - Sept. 2001 Horizon Technology Group - Tiffin Division Tiffin,

Ohio. Supplier of wheel nuts, ATL nuts, sparkplug shells and various other

parts to GM, Chrysler and Ford, along with many other Tier 2 and Tier 3

suppliers.

Business Unit Manager / Maintenance Manager - My responsibilities

included overseeing the production of 40 different parts in all phases of

production, including cold forming, tapping, thread rolling and multi-

spindle chuckers, to meet customers demands. Along with the production

side, I was responsible with all the machine maintenance and tool room

support. I helped team members write and update level 2 and 3, QS-9000

documents, worked with and created teams for continuous improvement plans,

attended A.P.Q.P. meetings, performed capability studies on new job

launches and monitored SPC charting at all machines to insure only quality

products were being produced. I also made many customer visits for advanced

quality planning for new job launches and any mass production quality

concerns.

Sept. 1994 - Oct. 1995 EPCO - Fremont, Ohio Remanufacturer of plastic

injection molding and die cast machinery.

Project Manager / Master Scheduler Duties included working closely

with Ford Motor Company's Manufacturing Engineers on all their machines, in

house, to insure they were remanufactured to their specifications, to keep

them updated on the progress of each machine and help coordinate projects

internally with Engineering, Purchasing, Sales and shop Supervisors.

As Master Scheduler, my responsibilities were to update and publish

the shop schedule, which I developed an a Lotus spreadsheet, with the help

of shop personnel.

June 1994 - Sept. 1994 Fastener Equipment Corp. Chicago, Illinois Broker

of new E.W. Menn thread roll machines and Asahi Sanuc cold headers and

remanufacturers of cold heading and thread roll equipment.

Remanufacturing Manager - Responsible for quoting, scheduling and

purchasing for the remanufacturing side of the business.

Jan. 1994 - June 1994 Manufacturing Consultant For three small businesses

in the Tiffin area.

Jan. 1992 - Jan. 1994 Form Forge Machinery Inc. Findlay, Ohio

Remanufacturer of hot, cold and warm forming equipment.

Manufacturing Manager - Responsible for all shop personnel and

scheduling all jobs according to customer specifications. Also worked with

Engineering and shop personnel on new design concepts to insure the on time

delivery of each project.

June 1976 - Jan. 1992 National Machinery Co. Tiffin, Ohio. Manufacturer

of new and remanufacturer of used, hot, cold and warm forming equipment.

Machine Assembly - I stared on the assembly floor where we built

machines up to the 1/2" size. As experience was gained, I was moved to all

other assemble departments, building cold formers, presses, bolt makers and

forging machines.

Service Technician - Worked on machines in customer's plants for

warranty or repair work. Also worked closely with Engineering,

Manufacturing and shop personnel to build many newly designed machines.

Technical Assistant - Worked with assemble personnel, Engineering,

Mfg. Engineering, Sales and Supervisors through the company to insure

quality products were manufactured and built in a timely fashion. Was also

used to "fill in" for any Supervisor that was on vacation or sick, in any

department through out the shop. Was then assigned to work in the expanding

CNC Machining departments to work with Product Engineering, Mfg.

Engineering Programming and machining Supervisors to help improve machine

efficiency and establish machining standards for the new Formax Formers and

Thread Rolling machines.

Sept. 1974 - June 1976 T.D.C. Construction - Fostoria, Ohio.

Worked part time during High School and full time during the summer

months for a General Contractor and was involved with all aspects of

building and remodeling homes and businesses.

Education;

Hopewell-Loudon High School graduate, Bascom, Ohio.

Attended various seminars and workshops, including Product,

Financial, SPC, Johnson Thread Gauging, 8=D problem solving, Equipment R&M

Planning through Ford Motor Company, Quality and Productivity Improvement,

Supervisor update classes and several computer training classes.

Completed courses in ISO 1101 Geometric Dimensioning & Tolerancing

and Leadership training.

Previously Certified for Adult CPR and Standard First Aid.

Hobbies include woodworking, cabinet making, restoring old vehicles and

woodworking equipment and home improvements for myself, friends and

relatives.

References available upon request.



Contact this candidate