Greg Prater
McMinnville, Tn. **110
abn5ne@r.postjobfree.com
OBJECTIVE
Seeking a challenging and rewarding opportunity with a growing, diversified and result-
oriented organization.
PROFESSONAL SUMMARY
• 3 Plant Start up’s. • 10 years Automotive
experience.
• Troubleshooting/repair of presses - 25 to 3500 ton • Fine Blanking presses - 250 to
1000 ton.
• Hydraulic presses from 250 to 1500 ton. • Injection Molding presses - 45
to 1000 ton.
• Wintress • Toledo Press Controls
• Operations Management • Screw Compressor
• Switchgear • JIT Scheduling
• Allen Bradley • Project Management
• Robotics • Electrical
• Hydraulics • Pneumatics
• Welding • SAP, CMS Systems
• P&L • Microsoft Office
PROFESSIONAL EXPERIENCE
L&W Engineering Nov. 2011 – Present
Engineering Manger / Safety / EMR
• New Program Launch: APQP, FMEA, PPAP, SPC, MSA, Control Plans, ISO17025, TS16949
• TPM Implementation
• Upgraded integrated Press Controls and Drives
• 12 Maintenance, 6 Tooling, 3 MFG Engineers, 2 Weld Engineers and 1 Controls Engineer for
support group.
• Cost Reductions: Added Scrap Shaker to Prog. Press for a reduction of head count in
stamping, this was a 35 K year savings. Reduction of destructs using non destruct method, this
resulted in a 100 k savings, Changed from Lincoln to Hyundai weld wire, this resulted in 45k a
year,
• Increased sph in stamping process, with hph boards and leading lean teams for change over,
tooling and equipment issues, these were daily end of shift meetings.
• Cycle Time improvements: UV cycle time from 66 sec. to 36 sec., Monitoring robot moves,
improving the weld timing process.
Martinrea Inc. Hopkinsville, Ky. Nov. 2010 to Nov. 2011
Engineering / Maintenance Manager
• Reporting to me 32 Maintenance Techs, 4 Manufacturing Engineers, 1 Weld Engineer, 4
Weld Techs., 12 Jig and Fixture, 4 Controls Engineers, 5 Supervisors, in a 24/7 day operation
Stamp and Assembly plant.
• Managed DT through data, Root Cause Analysis, Countermeasures, thru Action Plans.
• Managed MRO, consolidated drives, valves, cylinders, light curtains, to reduce inventory
by 500k.
• Revamped PM system by prioritizing PM to help drive DT by 10% Monthly.
• Cost savings projects: Re lamped plant from HPS to T5, Air Management. This savings
150K a year.
• Cycle Time improvements, Theta 1, Theta 2 to reduce from 92 to 72 seconds, illuminated
3 weekends a month.
• New Line Launches.
• Project Manager on BMW project.
• New Program Launch.
EAGLE BEND April 2009 – Nov. 2010
Maintenance Manager
• Reporting to me: 85 automated process lines, with Resistance and Mig Robotic Welding,
32 Service Lines, 30 Maintenance Techs, 3 Supervisors, 3 Weld Engineers, 3 Controls
Engineers and 12 Jig Repair.
• Manage the MRO for maintenance, implemented consolidation of parts.
• Improved the PM system by data collecting and trending emergency downtime.
• Implemented TPM system for production.
• Started the MTTR and MTBF and set targets.
• Operating Budget, R&M. forecasting.
• Monitored and Implemented Corrective actions for the following: Safety, Quality, OEE,
Environmental and Delivery.
SEWON AMERICA August 2008 – March 2009
Tier 1 Supplier to KIA
OPS / Engineering Manager
• New plant start up.
• Managed 200 In Service Dies
• Managed 4 Production Group Leaders, 42 Production associates.
• Managed manufacturing engineers and maintenance engineers.
• Equipment includes 22 weld assembly cells (Resistant and CO2), 4 tandem
press lines, 2 transfer press lines and 2 blank lines.
• Preventive, Predictive maintenance and TPM program for the equipment and
facility.
• Coordinated training for 22 team members in maintenance department.
• Coordinate spare parts, assembly and stamping process improvements.
• Engineering changes.
• Jig maintenance.
• Operating Budget, R&M forecast.
• Training of Production associates.
• Monitored and Implemented Corrective actions for the following: Safety,
Quality, OEE, Environmental and Delivery.
Kingston ASFC/BERKSHIRE HATHAWAY CO. October 2007 – Aug. 2008
Global supplier for Appliance Industry Whirlpool/G.E.
ISO Certified
Manufacturing Engineering Manager / OPS Manager
• Managed a Team of Design, manufacturing engineers, maintenance supervisors, process
engineers and maintenance team members.
• Planning and implementation of product development, process development, equipment
specifications and equipment purchasing.
• P&L, quotations of new business.
• Responsible for the budget for maintenance repair, engineering, design and for indirect
labor charged to the manufacturing line.
• Monitored and Implemented Corrective Actions for the following: Safety, Quality, OEE,
Environmental and Delivery.
• Facility programs.
• Implemented an aggressive campaign on downtime utilizing root cause analysis.
• Implemented a predictive maintenance program.
• Implemented 5 S programs, along with lean manufacturing.
• Implemented cost reductions in the product, by material changes, process improvements
and automation of the product lines.
HYUNDAI MOTOR MANUFACTURING October 2003 – October 2007
Global top 5 Automotive Manufacturer.
Maintenance Manager / Training Coordinator
• Directed a team of engineers and maintenance technicians for new plant start up.
• TS-16949 Certified.
• Tasked with preparation of T1, T2 and Mass Production.
• Coordinated all spare parts.
• Preventive Maintenance for 2 turnkey 5400 ton cross bar lines including Destack and
Palletizing units, 500 ton Blanking Line including Piler Unit, 2 ASRS systems, 12 Fanuc
Stacking Robots, 2 EMS systems, Tryout Press with a Die Setter and all the automated scrap
system including baling unit.
• Implemented the training program for the plant engineering department.
• Tasked with the team member technical development which included Control Logix,
Device Net and Control net there was a 45% gain of technical skills after the completion of the
Multi-craft Skills Development Program.
• Worked with, AIDT and local collages to develop technical programs for engineering
technicians.
• Submitted the budgetary for the Plant Engineering Department.
• Monitored the budget through the ERP system and CMMS system.
• Participated in continuous improvement by the retro fit the 500 ton Blanking Line with
Reliance RPM AC motors and Power Flex 700S Drives.
• Removed costly DC motors and drives, and was completed in 10 days.
• Maintained a down time rate for the plant below 3% for the maintenance breakdowns by
using root cause analysis, FEMA and breakdown counter measure reports.
BATESVILLE CASKET CO. 2002 – October 2003
Direct Supplier to the Funeral Industry.
Maintenance Supervisor/Tool Room Supervisor
• Implement, coordinate pm’s in day-to-day operation in a J.I.T. facility.
• Union environment.
• Supervised tool room department and maintenance.
• Assisted in troubleshooting of mechanical presses, injection mold presses, jig and fixture
welding, roll forming, static paint system and high-speed conveyor systems.
• Root cause analyses, developing preventive measures and increasing productivity using
continuous improvement events.
STAMTEC, INC. November 2000 - 2002
Mechanical press manufacturer and service.
Service Manager/Project Engineer
• Assisted with the management and supervision of the service department.
• Inventory control, estimating installations and repairs.
• Advanced to Project Engineer, overseeing complex installations of mechanical
presses ranging from 25 ton high speed to 2500 ton rolling bolster and transfer
presses,
• Integrations of press controls such as Link 5000, Allen Bradley, Toledo and
Wintress controls.
• Installed various types of auxiliary equipment, such as tonnage monitors, light
curtains, feeder systems, quick die change units, robotic transfer systems and
straightners.
FEINTOOL, INC. October 1998 – November 2000
Tier 1 and 2 automotive supplier for Ford, Johnson Controls, Delphi, Chrysler, TRW and various
fine blanking companies.
Maintenance Supervisor : Antioch
• New Plant Start up.
• Directed, trained, maintenance personnel and coordinated preventive maintenance.
• Coordinated the installation of all the new equipment.
• Set up vendors.
• Maintained inventory for replacement parts,
• Assisted troubleshooting automated process lines.
• Shuler hydraulic fine blanking presses 250 to 800 ton and Kaiser FFS 500 ton link motion
press.
Maintenance Supervisor: Grooms Road, Blue Ash
• Selected to relocate to start up fine blanking and training.
• Closed Grooms Rd. facility.
• Extensive training in fine blanking technology (tooling, presses).
• Rebuilt two 250 Osterwalder presses, including adding new press controls (Total Control)
pc based system and coordinated the preventive maintenance system and spare parts list.
• Installed, troubleshot and disassembled automated process equipment, fine blanking
presses 250 to1000 ton presses and coordinated the shipment.
WHIRLPOOL February 1997 – October 1998
OEM Appliance Manufacture
Maintenance Shift Supervisor
• Directed third shift maintenance department.
• Assigned projects.
• Assisted with troubleshooting, installation, program changes, of various types of
mechanical and hydraulic presses ranging from 300 to 800 ton presses and automated
process lines.
AG SIMPSON 1992 – February 1997
Tier 1 automotive mfg. for Nissan, Toyota, Honda and Saturn.
Maintenance Technician/Team leader
• Installed, repaired, modified and troubleshot various types of automated and
robotic process equipment.
• CNC pipe bending machines, robotic (ABB) transfer and welding cells, 1200
watt CO2 robotic laser and various types of mechanical and hydraulic presses
150 to 600 ton.
USARNG 1992 - 2005
Corp. 19 K : Abrams M1 A1 Tank Crew Member
• Responsible for the up keep and crew member maintenance to this state of
the art weapon.
• Driver, Loader, Gunner and Tank Commander.
• Utilized GPS navigation systems, as well maneuvering with compass and
map reading.
• Qualified expert in M16 and M9 Berretta.
• Skills in electronics, hydraulics and servos.
• Troubleshoot problems in field to expedite recovery of vehicle.
UNITED STATES NAVY 1988 - 1992
GMG3: Gunners mate Technician
• Maintenance, operations and repair of shipboard gun mount systems.
• Troubleshot, modified electrical systems (servo’s, gyro’s and motor controls),
Pneumatics and hydraulics.
• Preventive maintenance of the shipboard sprinkler systems (wet, dry).
• Trained and supervised new individuals on the operation and the pm’s on gun mount
systems.
EDUCATION/TRAINING
• BSME - Glendale University.
• ABB Robotics.
• Siemens.
• Allen Bradley.
• Link press controls.
• Motion.
• 5S.
• Lean Manufacturing.
• Root Cause Analysis