Ali Humayun Shah

abn3c4@r.postjobfree.com

**** ******* ****, *********** ** 47111 ( (347) 659 - 8843

EDUCATION

GIK INSTITUTE OF ENGINEERING SCIENCES AND TECHNOLOGY - SWABI, June 2010

PAKISTAN

Bachelor of Science in Engineering Sciences, Full-Time Program

Concentration in Project Management and Semi-conductors;

Other major courses: Instrumentation, Thermodynamics and Engineering Drawing

(CAD)

EXPERIENCE

D.A Inc, Charlestown IN Jan 2012-

Engineering Tech (Contractual) Present

Main Responsibilities:

Assisting the Quality Engineer for part development for the 150A

project (Toyota Corolla)

Evaluation of parts on checking fixtures, compiling reports and

comparing with master part

Creating standard documents for part evaluation on CFs and

manufacturing line, QIS, MQC, FMEA and process flow charts

Process Audits for ongoing production

Part evaluation (level 3) for 420A project (Toyota RAV4)

Toyota Manufacturing, Karachi, Pakistan Oct 2011-Sept

2012

Indus Motor Company Ltd.

Trainee Engineer (Quality Engineering Projects)

Main Responsibilities:

Study Drawings for new parts and analysis for currently used parts; PFC (Process

Flow Charts), MQC (Manufacturing Quality Charts), DPU (Defects per Unit) study

Supplier Coordination during product development phase of project

Approval of Part Inspection Standard(PIS), CF Concept and CF

PPAP, Evaluation and approval of Off-tool Sample (OTS).

Support line side Execution Activities for new Projects (Assembly Quality

Coordinator during projects)

Responsible for Evaluation (Static and Dynamic) of Trial Vehicles as per

Evaluation Schedule

FMEA, Study Problems and analyze the root cause and suggest countermeasures

Raise QIR (Quality Improvement Report)/DIR (Defect Information Report) and

follow up responsible person in charge for closure

Maintain Problem Follow up Sheets and monitor for Closure

Part of Supplier Part Tracking Team (SPTT), visit supplier and suggest

Improvement to meet the Part Quality Standard

Prepare Complete Vehicle Inspection Standard (CVIS) and Check Sheets for line

side inspection

Prepare Change points sheets

Study Marketing Specs and prepare Change points sheets to focus new specs for

evaluation point of view

Coordinating with the project manager to ensure the schedule is met and goals

are achieved (daily).

Brief Quality Evaluation Plan in Asakai Meeting

Communicate Evaluation results in Yuichi Meeting and discuss root cause and

countermeasures (QIR/DIR)

Participate in Project Kick Off Meeting in IMC and with TMAP (Toyota Motor Asia

Pacific)

Support and Join Shipping Quality Confirmation Meeting in IMC (Indus Motor

Company)

Responsible for Evaluation of Radio, Back Camera, Navigation Software and other

Special Accessories

Main Projects

TOYOTA HILUX- D CAB (VIGO CHAMP) and TOYOTA HILUX SUV (FORTUNER)

Following Project Preparation Activities were performed for above projects

during my period in IMC

Perform Quality Evaluation Activities during SKK, 1A, MPTA as per schedule

Studied Local Part Dwg, PIS and evaluated locally developed parts

Study CPL and segregate common local parts between B Cab and D Cab

Confirm the current OK rate of Common parts of B Cab and made plan for level up

the accuracy rate where required

Coordinated with Product Development regarding part related issues and requested

production engineering to issue ECIs where required.

Worked with the Anzen Japan for Setting the Tester Line Parameters

Updated the TVECS Software for Evaluation

Studied the Wire-harness design on a CBU SUV and proposed a re-designing for

back camera compatibility

Small Projects

TOYOTA COROLLA Navigation & Back Camera introduction

Evaluated different audio systems with NAVIGATION Software compatibility and

developed check sheet for judgment

Conducted a road test to ensure GPS coverage (map detail)

Coordinated with TMAP regarding back camera Quality Standards for reference.

Designed and support manufacturing of the vibration test bench for durability

confirmation of back camera. Also designed the jig for camera installation and

GPS antenna fitment

Confirm Back Camera and Navigation according to Toyota Inspection Standard

US Embassy Fleet & Pakistan Army Orders

Study Project Specs and prepare change point details

Prepare Main Quality KPI and made one voice for all the stakeholders

Lead this Project with a team of two engineers and two team leaders, conducted

root-cause analysis, electrical function check, also held meetings at the end of

the day to ensure the target been achieved (daily)

Worked at supplier's facility to design and confirm local drawings for unique

parts. Also evaluated the parts at vendor facility before making the proto

vehicle.

Other Activities

Worked on Toyota HILUX SURF (D-Cab) and Toyota HILUX GRAND CABIN (B-Cab) project

Evaluated the exhaust pipe (new catalytic convertor) for EURO-II compliance

Presented weekly quality (project) updates in Obeya meetings. Updated a "project

update" board daily for inter-department presentations

ADDITIONAL INFORMATION

Skills: MS Word, MS Excel & MS PowerPoint; CATIA V5; Delcam Power INSPECT for

FARO Arm; ISO 9001:2800

Professional Trainings: Toyota Production System; Toyota Way; QCC (Quality

Control Circles); PDCA (Plan Do Check Act); FST (Fundamental Skill Training

Shop wise);