Ali Humayun Shah
abn3c4@r.postjobfree.com
**** ******* ****, *********** ** 47111 ( (347) 659 - 8843
EDUCATION
GIK INSTITUTE OF ENGINEERING SCIENCES AND TECHNOLOGY - SWABI, June 2010
PAKISTAN
Bachelor of Science in Engineering Sciences, Full-Time Program
Concentration in Project Management and Semi-conductors;
Other major courses: Instrumentation, Thermodynamics and Engineering Drawing
(CAD)
EXPERIENCE
D.A Inc, Charlestown IN Jan 2012-
Engineering Tech (Contractual) Present
Main Responsibilities:
Assisting the Quality Engineer for part development for the 150A
project (Toyota Corolla)
Evaluation of parts on checking fixtures, compiling reports and
comparing with master part
Creating standard documents for part evaluation on CFs and
manufacturing line, QIS, MQC, FMEA and process flow charts
Process Audits for ongoing production
Part evaluation (level 3) for 420A project (Toyota RAV4)
Toyota Manufacturing, Karachi, Pakistan Oct 2011-Sept
2012
Indus Motor Company Ltd.
Trainee Engineer (Quality Engineering Projects)
Main Responsibilities:
Study Drawings for new parts and analysis for currently used parts; PFC (Process
Flow Charts), MQC (Manufacturing Quality Charts), DPU (Defects per Unit) study
Supplier Coordination during product development phase of project
Approval of Part Inspection Standard(PIS), CF Concept and CF
PPAP, Evaluation and approval of Off-tool Sample (OTS).
Support line side Execution Activities for new Projects (Assembly Quality
Coordinator during projects)
Responsible for Evaluation (Static and Dynamic) of Trial Vehicles as per
Evaluation Schedule
FMEA, Study Problems and analyze the root cause and suggest countermeasures
Raise QIR (Quality Improvement Report)/DIR (Defect Information Report) and
follow up responsible person in charge for closure
Maintain Problem Follow up Sheets and monitor for Closure
Part of Supplier Part Tracking Team (SPTT), visit supplier and suggest
Improvement to meet the Part Quality Standard
Prepare Complete Vehicle Inspection Standard (CVIS) and Check Sheets for line
side inspection
Prepare Change points sheets
Study Marketing Specs and prepare Change points sheets to focus new specs for
evaluation point of view
Coordinating with the project manager to ensure the schedule is met and goals
are achieved (daily).
Brief Quality Evaluation Plan in Asakai Meeting
Communicate Evaluation results in Yuichi Meeting and discuss root cause and
countermeasures (QIR/DIR)
Participate in Project Kick Off Meeting in IMC and with TMAP (Toyota Motor Asia
Pacific)
Support and Join Shipping Quality Confirmation Meeting in IMC (Indus Motor
Company)
Responsible for Evaluation of Radio, Back Camera, Navigation Software and other
Special Accessories
Main Projects
TOYOTA HILUX- D CAB (VIGO CHAMP) and TOYOTA HILUX SUV (FORTUNER)
Following Project Preparation Activities were performed for above projects
during my period in IMC
Perform Quality Evaluation Activities during SKK, 1A, MPTA as per schedule
Studied Local Part Dwg, PIS and evaluated locally developed parts
Study CPL and segregate common local parts between B Cab and D Cab
Confirm the current OK rate of Common parts of B Cab and made plan for level up
the accuracy rate where required
Coordinated with Product Development regarding part related issues and requested
production engineering to issue ECIs where required.
Worked with the Anzen Japan for Setting the Tester Line Parameters
Updated the TVECS Software for Evaluation
Studied the Wire-harness design on a CBU SUV and proposed a re-designing for
back camera compatibility
Small Projects
TOYOTA COROLLA Navigation & Back Camera introduction
Evaluated different audio systems with NAVIGATION Software compatibility and
developed check sheet for judgment
Conducted a road test to ensure GPS coverage (map detail)
Coordinated with TMAP regarding back camera Quality Standards for reference.
Designed and support manufacturing of the vibration test bench for durability
confirmation of back camera. Also designed the jig for camera installation and
GPS antenna fitment
Confirm Back Camera and Navigation according to Toyota Inspection Standard
US Embassy Fleet & Pakistan Army Orders
Study Project Specs and prepare change point details
Prepare Main Quality KPI and made one voice for all the stakeholders
Lead this Project with a team of two engineers and two team leaders, conducted
root-cause analysis, electrical function check, also held meetings at the end of
the day to ensure the target been achieved (daily)
Worked at supplier's facility to design and confirm local drawings for unique
parts. Also evaluated the parts at vendor facility before making the proto
vehicle.
Other Activities
Worked on Toyota HILUX SURF (D-Cab) and Toyota HILUX GRAND CABIN (B-Cab) project
Evaluated the exhaust pipe (new catalytic convertor) for EURO-II compliance
Presented weekly quality (project) updates in Obeya meetings. Updated a "project
update" board daily for inter-department presentations
ADDITIONAL INFORMATION
Skills: MS Word, MS Excel & MS PowerPoint; CATIA V5; Delcam Power INSPECT for
FARO Arm; ISO 9001:2800
Professional Trainings: Toyota Production System; Toyota Way; QCC (Quality
Control Circles); PDCA (Plan Do Check Act); FST (Fundamental Skill Training
Shop wise);
Status: Green Card Holder