CURRICULUM VITAE

ZIVOTA STEVANOVIC, BE Chem. Eng

(CONSTRUCTION/COMMISSIONING & START-UP ENGGINEER)

Areas of expertise: Oil & Gas industry

Professional experience: 28 Years

Skills set:

- Project Management Consultancy experience.

- Review Contractor pre-commissioning and commissioning packages.

- Site Management and Process Construction Supervision.

- Contractor document review.

- Production supervision (onshore Oil &Gas plants).

- Plants Test run and handover.

- Steam Reformer Specialist (SYNGAS and/or H2 and CO production).

- Management of pre-commissioning/commissioning activities within the

respect of

OPERCOM/ICAPS methodology.

- Extensive experience with process streamline and bottle-neck removal.

- Problem solving and analytical skills.

- PTW system trained.

- Process Risk Management Policy implementation.

-Training course and support program delivery (system training).

Personal details:

Date of birth / age: 30-11-1954 / 58

Nationality: Serbian

Civil Status: Married

Education: Technology and Metallurgical Faculty,

Petrochemical Industry Dep.,

University of Belgrade

(Serbia). Graduated in 1984.

Mobile: +336********/+381-**-*******

E-mail address: *******************@*****.***;

**************@*******.***

Skype: zivota8581

Work History:

Date: 12/2012- present

Location: TOTAL Refinery de Normandy, Le Havre, France

Company: Tecnimont KT, Italy

Position: Commissioning Manager.

Description: Heater Inspection and Heater make RFSU: FD/ID Fans

preparation for start Up, FG,NG,

OFF/SWS gas Systems make ready for Start Up;

Heater Dry-Out;

Heater inspection after dry-out;

Heater Start Up.

Date: 5/2011- 12/2012

Location: Ahmadi, Kuwait

Company: SAIPEM, Italy

Position: Commissioning and Start up Co-coordinator.

Description: Gas Booster Station Construction Completion surveillance

and Pre-commissioning/

Commissioning activities doing. Provide RFSU and

Plant Start up.

Ensure best practice construction considerations and

methods are delivered to the

project for EPC and related activities.

Act as an advisor on construction best practice to

senior onshore team members as

required from time to time.

Provide an interface between construction and

engineering by supporting discipline

engineers during constructability reviews for both

company and contractor.

Date: 12/2010- 3/2011

Location: Ras Laffan, Qatar

Company: Pearl GTL/TOYO-Hyundai Consortium/KTI-Technip, USA

Position: KTI Vendor representative

Description: Steam Reformer refractory dry-out prepare and execute.

Provide RFSU.

Date: 5/2009- 4/2010

Location: Mohammedia, Morocco

Company: Snamprogetti, Italy

Position: Commissioning and Start up Supervisor

Description: Commission Hydrogen plant with associated units

(Hydrocracker, Hydrotreater unit,

Amine regeneration unit). Pre-commissioning,

commissioning and start up

of Steam Reformer(Hydrogen production),

Hydrotreater, Hydrocracker, H2S removal

Unit, Amine washing Unit, Vacuum distillation (

Rotating equipment test run, Systems

dry out, Inertization, Initial start up and start

up, H2 production, Diesel and gasoil

production /low sulphur content-5 ppm/ monitoring,

Operational service test ). Provide

necessary operations for Hydrocracker pre-

commissioning jobs (pipes hydro tests, air

blowing, flushing, punch points list making,

rotating equipment checks, static equipment

inspection prior box-up )

Date: 10/2008- 12/2008

Location: Blok Songo, Sumatra, Indonesia

Company: Hydro-chem, Atlanta, USA

Position: Plant Start up Supervisor;

Description: Hydrogen production and PSA (Pressure Swinging Absorption)

purification, Steam

Reformer based on biogas, commission and Start up

- Handover documentation review;

- P&ID checks and plant inspection;

- Mechanical, Electrical and Instrument completions check and

functional test;

- Equipment inertizing and leak testing;

- Initial Start up on LPG (feed and fuel) for catalyst

reduction and then turn to biogas(feed).

- Final tuning process data as per PFDs.

- Local staff training

Date : 08/ 2006. - 05/2008

Location: Ahmadi - Kuwait

Company: Kuwait Oil Company/ AMEC Global Resources PTE Ltd

Position: Construction /Process/Commissioning Eng

Description: - Project Management Consultancy for the Project of the

Plant Capacity Upgrade

and relocation of underground pipes to above

ground at 12 Oil/Gas Field (Gathering

Center) and 3 Gas Stations.

- Witness pre-commissioning (hydro and pneumatic

leak testing), and commissioning

activities such as Vessels, Pipes, Gas-Scrubbers,

Separators and Desalinators

flushing and inertizing, Motor solo run test of

rotating equipment, Firefighting system

checks and more.

- Supervise Construction activities (mechanical,

electrical and instrument) with function

tests;

- Review Contractor pre-commissioning packages and

site activities approved.

- Review completions status, SAT, FAT and Acceptance

Criterion Definition

- Start- up & observation.

- Data analysis and final system tuning.

- Review performance test data.

Date : 08/ 2005. - 12/ 2005.

Location: Corinth - Greece

Company: Motor Oil Hellas / Technip KTI SpA,Roma

Position: Commissioning & Start up Co-orinator

Description: - Steam Reformer start up preparation (flushing, air blowing

and leak test of equipment)

- Start up Hydrogen Production Unit -Steam reformer

naphta based,7500 NCMH;

- Plant inspection (SAT)

- Hydrogen purification by PSA (Linde procedure-

Germany);

- DCS control system;

- Local staff training;

- Process bottleneck removal.

- Production process final tuning.

Date: 02/ 2005. - 06/ 2005.

Location: Nanjing - China

Company: BASF-YPC/Technip - Benelux

Position: Commissioning and Start-up Eng.

Description: Steam Reformer NG based Preparation for start up and Start

up;

- Plant inspection;

- Equipment (mechanical, electrical and instrument)

testing;

- Vessels, Pipes, Reactors, Scrubbers, Tanks and

Rotating equipment inspection;

- Remove CO2 (Absorbing and Stripping CO2);

- CO and H2 recovery unit - Cold Box (Air Liquide-

France procedure);

- Compression CO (45 bars) and H2 (150 bars) and

export to Battery Limit;

- Compression OXO gas (50 bars) gas and export to

Battery Limit;

- DCS system control;

- Local staff training and troubleshot problem

solving

Date: 12/2000- 2/2005.

Location: PANCEVO, SERBIA

Company: HIP Petrohemija, Pancevo

Position: Manager for Health, Safety and Fire protection

( including 9 petrochemical plants and more then

3000 employees)

Description: - Organization work for Health, Safety and Fire

protection on following plants:

Ethilen, HDPE,LDPD,VCM and Chloralkaly plant;

- Contact with outside Institutions, like

Ministries, Agencies, Companies;

- Implementation of work low and fire protection

procedure;

- Physical and chemical pollution Control on work

places;

- Technical equipment used control in different

process of work.

Date: 1996- 2000

Location: Pancevo, Serbia

Company: HIP Petrohemija, Pancevo

Position: Lead engineer for implementation QS

Description: Implementation of JUS/ISO 9002:96 and JUS/ISO 14000

standards at Chlor-alcaly

plant

Date: 1989-1996

Location: Pancevo, Serbia

Company: HIP Petrohemija, Pancevo

Position: Senior Process Engineer

Description - Chlorine production process controlling in Chlorine-alkali

plant

- Crawford -Russell/Olin procedure-(USA)

- Hydrogen separation, purification and

transportation.

- HCL plant Pre-commissioning/commissioning and Start

up.

Date: 1984-1989

Location: Belgrade - Baric, Serbia

Company: Basic Chemistry Complex

Position: Senior Process Engineer (Start up & Process engineer)

Description: Steam reformer Commission and Start up;



Contact this candidate