Post Job Free
Sign in

Maintenance Project

Location:
Red House, WV, 25168
Posted:
April 09, 2010

Contact this candidate

Resume:

Luke Carney

Route * Box ***-*

Red House WV, ****8

**********@*********.***

304-***-****

OBJECTIVE

To obtain a position in a dynamic environment which will allow me to

use my past experience and develop new skills in order to continue my

professional growth.

WORK EXPERIENCE

Toyota Motor Manufacturing West Virginia-Buffalo, WV (June

1999~Present)

Maintenance Group Leader (Oct. 2006-present))

o Manage Maintenance Activity for ZR/GR Cam, Crank, Conrod, and

Piston Pin lines. Supervise 16 hourly maintenance team

members. Reasonable for all fascists of maintenance activity

for these 8 lines.

o Started up 478F GR Cam and Crank lines after model change,

achieved 90% operational availability.

o TPM system designed and implemented in these areas. Daily

maintenance task for all machines in these areas made (aka

Daily Maintenance Cards). Production T/M's reasonable for

checking and maintenance T/M's reasonable for auditing and

teaching if not correct.

o PM STW Project (Preventive Maintenance Standardization

Project)-Responsible for making and assigning PM's to new

global machines and standardizing older machine PM's.

Maintenance TPS implemented.

Maintenance Specialist/Project-Production Specialist (Dec. 2001-Oct.

2006)

o (Aug. ~ Oct. 2006), Controls Leader for 478F (New 3.5L 6

Cylinder Engine) Robotic Gantry Loader to Grinders Project.

Total project 1.5 Million dollar. Designed & programmed from

ABB IRB2400 robots to Grinder and conveyor PLC's. I/O

Communication completed through device net.

o (Dec 2004), Assigned to Automatic Transmission Plant for

special project support. Projects included AT

Reconstruction, 20M project. 407F Gear Project Automation

Engineer. Responsible for implementation of automation

equipment for greater quality control and labor cost

reduction.

o Responsible for maintenance budget of ZZ Cam, ZZ Crank, MZ

Cam, and MZ Crank. Approximately 3.5M dollars/yr.

o Analysis of machine performance and breakdowns to determine

problems. Countermeasures taken as needed to prevent

reoccurring breakdowns and short stoppages through

preventative maintenance and or design changes to machine(s).

o Kaizen implementation throughout the lines.

o Predictive Maintenance Program Implantation at Toyota, WV

Location. (2001-present).

o Spare parts recommendation for machines, and new machines

after installations.

o Program and troubleshoot PLC's, CNC, Robots, and Servo

Drives

o Troubleshoot mechanical, electrical, hydraulic, and

pneumatics systems

Skilled Maintenance Team Member/Leader (June 1999-Dec 2001)

o Manage daily maintenance activities of 5 team members on 2nd

shift for 6 (MZ) cylinder machining.

o Problem solving and supervising maintenance

o Program and troubleshoot PLC's, CNC, and Servo Drives

o Troubleshoot electrical systems, hydraulic systems, and

pneumatics systems

o Continuous improvement on machines and processes

Yokohama Tire-Salem, VA

Associate Engineer (August 1997-June 1999)

Engineering projects and continuous machine improvements.

Design Control layouts.

Installation and start up of Akron Standard TUO, Yokohama PR703 Tire

machine, ITW Micropoise tire balancer, Spadom White Wall Tire Buffer, and

Mitsubishi Tire Presses.

Program and troubleshoot PLC's.

Install, set up, and troubleshoot AC/DC drives and motors.

EDUCATION

Bachelor of Science, Electronic Engineering Technology, December 1996

West Virginia Institute of Technology

SKILLS

6. Predictive Maintenance-- Level I Cert. Ultrasonic, Level I

Vibration Analysis, Thermograph

7. Control layout of electrical panels

8. TPS (Toyota Production System), Lean Manufacturing

9. PLC ladder programming and NC programming

10. Mechanical and electrical knowledge very strong

11. Electrical schematic and print reading

12. Unidraf and AutoCAD

References available upon request



Contact this candidate