Post Job Free
Sign in

Engineer Manufacturing

Location:
James Creek, PA, 16657
Posted:
April 12, 2010

Contact this candidate

Resume:

david summers

**** ***** **** ***** *****, PA *665 717-***-****

******@**********.***

MANUFACTURING ENGINEER

Production Management / New Product Development / Operations & Process

Improvement / QA

Equipment Installation / ISO-QS 9000 / Change Leadership / Team Building /

Consulting

I have managed manufacturing operations for companies that produce a

variety of products from specialty paper goods to heavy construction

equipment, solving complex problems and dramatically improving

productivity. By aligning people and tasks in a way that inspires

confidence, I built and led winning production line teams.

o Gaining trust and respect of operations personnel at every level.

o Conducting root cause analysis of problems at the human/machine

interface.

o Identifying and analyzing defects in supplier/contractor products and

processes.

o Building and leading high-performance manufacturing teams.

o Reducing failure rates and optimizing productivity.

I earned an MBA from Frostburg State University and a BS in Manufacturing

Technology from California University of Pennsylvania. As an operations-

oriented leader, I take a hand-on approach to both management and problem

solving. I am a confident decision maker and a strategic thinker who takes

a whole-system process view.

SELECTED ACCOMPLISHMENTS

Isolated persistent packaging problems and reduced failure rate. Christmas

card packages sealed at the factory were mysteriously falling apart in the

warehouse. In-depth analysis over months, including process testing,

revealed that blister board supplier was the problem. Changed suppliers,

reducing failures from 21% to 0.1%.

Led program of corporate culture change, dramatically improving

productivity. Paper Magic Group suffered from quality problems and hide-

bound production practices. Hired to improve bottom line, conducted focus

groups, drove evolution of "learning organization" and developed

productivity tracking system. Productivity rose 22%.

Implemented process improvements that cut set-up time in half. As leader

of Rapid Exchange of Tooling Team, discovered that Gilmour machines sat

idle for twelve hours while dies were changed out. Videotaped entire

process, conducted brainstorming sessions with all lead personnel and cut

die change time to six hours.

Gained employee trust and built effective teams to reduce overtime and

improve productivity. Tokico USA was faced with excessive employee overtime

and persistent failure to meet production schedules. Spent first year with

company building trust and helping staff solve multiple problems, improving

productivity 21% by year end.

CAREER SUMMARY

Process Engineer, Volvo Construction Equipment, 2008 to Present. Act as

liaison between the manufacturing departments and design engineering on

product development teams. Facilitate cross-functional teams on multiple

projects, such as MT 2000 road milling machine. Lead problem resolution

processes.

Manufacturing Engineer, Case New Holland / CNH America, LLC, 2004 to 2008.

Coordinated projects between departments and other company plants.

Delivered troubleshooting and engineering expertise to manufacturing floor.

Served as alternate supervisor, managing day-to-day processes on shop floor

with over 30 employees.

Plant Manufacturing Engineer / Quality Manager, CSS Industries / Paper

Magic Group, 2001 to 2004. Led company-wide efforts in problem analysis,

team building and process improvements. Coached supervisors on workflow and

line balancing. Developed and supervised quality control staff. Directed

maintenance team.

Production Engineer, Tokico USA (a $15M auto parts supplier), 1998 to 2001.

Facilitated process improvement, cost reduction and quality initiatives for

this Tier 1 supplier of automotive brakes and vacuum boosters. Performed

process capability studies and root cause analysis. Collaborated with

operators, quality engineers and supervisors.

Manufacturing Engineer, Gilmour Manufacturing Company, 1992 to 1998.

Performed line layout, purchased and installed manufacturing equipment and

managed outside contractors for this 550 employee manufacturer of hoses,

hose-end and related product. Streamlined processes and procedures.

Personal: I enjoy a variety of activities including gardening, bicycling,

target shooting and orchard cultivation.



Contact this candidate