Post Job Free

Resume

Sign in

Engineer Project Manager

Location:
New Haven, KY, 40051
Posted:
April 19, 2010

Contact this candidate

Resume:

Education: Bachelor of Science, Mechanical Engineering

**** ********, ********** ** **********, Speed Scientific

School

Skills:

. Precision Machine and Tool Design utilizing 3D solid modeling and

Finite Element Analysis (FEA) of structures, and other components.

. Management of large projects from customer quotation to final process

acceptance.

Computer Skills Current:

. 3d Modeling Systems including Pro-Engineer releases 18 - Wildfire,

Autocad release 2-2008, Solid Works, Inventor

. FEA analysis utilizing Mechanica, Cosmosm, and Nastran

. Various Operating Systems including Window NT, 2000, XP

. Various software packages including Window Back Office products, MS

Word, Access, Excel, Project, PowerPoint

. MRP software including JD Edwards, SCALA

Additional Computer Skills Not Current:

. Operating Systems - Linux, SCO Unix, DOS

. Programming Languages - Cobol, Basic, Fortran, C/C++, Visual Basic

Experience:

2/05-Present Joseph R. Clark LLC

Engineer - Sole Proprietor Company

Providing Mechanical Design and Build for precision machine

tools. Machine provided included Large Gantry Style 5 axis high-

speed routers, Multi Head Waterjet cutting systems. Final

customers included Boeing, and Mitsubishi Heavy Industries for

new 787 aircraft.

2/01-2/2005 Synergy Tool and Gage, Cox's Creek, Ky

Sr. Design Engineer - Responsible for Mechanical and Electrical

Design of automated process equipment and check fixtures to

Automotive Manufacturers and Tier 1 & 2 suppliers. This

included weld equipment both automated and robotic, and other

process equipment Daily duties included Customer Contact,

Quotation, Project Management, Total Design Mechanical &

Electrical, Equipment Procurement, Assembly, Machine Debug,

Customer Installation and Runoff.

11/00-2/01 Advanced Chemtech, Louisville, KY

Sr. Design Engineer - Responsible for the mechanical design,

fabrication assembly and debug of a computer controlled 32-servo

axis production lab, which produced peptides for pharmaceutical

development.

2/90-11/2000 Flow Robotics (certified ISO 9000 & 9001),

Jeffersonville, IN

Sr. Project Engineer-Responsible for the computer analysis, design

and fabrication of large precision multi-axis CNC machine tools.

This includes the concept, design and implementation of process

lines utilizing designed equipment. Work included: 1) Finite

Element Analysis (FEA) of large complex machine structures

utilizing Mechanica, Cosmosm and Nastran analysis software,2)

Precision design of machine tool utilizing Pro Engineer, and

Mechanica. 3) Management of large national and international

projects exceeding $1,000K, and 4) Precision component drive

train design. Customers included Boeing, Northrup, Saab

Aerospace, Lockheed and General Dynamics.

8/89 - 2/90 ANDERSON-RUFFRA CO., Louisville, KY

Project Manager/Structural/Electrical Engineer/

Network Manager

Responsible for the electrical design, development of PLC

software and debug of all systems sold.

Responsible for the structural analysis, design, and manufacture

of all crane and conveyor systems sold.

4/84 - 6/89 INTERLAKE INC., Material Handling Division, Shepherdsville, KY

Design Engineer/Advanced Manufacturing Engineer

Design Engineer - Responsible for the design, testing, equipment, and

literature necessary for the production, sale and maintenance of

new products. This included the entire line shaft drive product

conveyors and a power and free conveyor system.

Advanced Manufacturing Engineering - Responsible for development and

implementation of short and long term strategic plan. This

included, development and monitoring the manufacturing plant

budgets, and overseeing the capital program for the facility.

Increase the plant manufacturing capacity from $15M to $50M on a

single shift basis by the implementation of roll forming and

stamping process.

4/84 - 5/85 BATESVILLE CASKET CO., Campbellsville, KY

Automation Engineer

Responsible for the analysis, design, installation, software

programming,

and debug of plant automated process equipment. This included the

installation and debug of robotic painters, the design,

installation and debug of automated weld cells with automated

part loading equipment, the design installation and debug of

servo controlled casket finishing machines and the development

of custom software for servo controlled weld cells.

12/82-4/84 Consulting Engineer (Self Employed), Louisville, KY

Principle Engineer

Owned and operated a consulting engineering firm employing nine

personnel of which 3 Engineer and 6 drafts people. Principle

work involved State and Federal Permitting and Overall Design

for chemical plants. This included the design of Hazardeous

Waste treatment facility completing Ky. Division of Waste

Management RCRA application, Ky. Division of Air Pollution

Emitter Application and Ky. Division of Water Quality Discharge

Application.

10/78-11/82 AIRCO CARBIDE INC., Louisville, KY

Process Engineer/Maintenance Superintendent/Process Superintendent

Process Engineer - Primary responsibility for the engineering design,

fabrication and installation of capital projects up to

$1million. My responsibility started with the request for

capital expenditure and ended with signoff by production and

subsequent monitoring of cost and savings. Major projects

included startup of calcium hydroxide reclaim and barge loading

facility, design and installation of a robotic furnace taping

system.

Maintenance Superintendent - Responsible for total plant mantenance.

Work force contained 60 mechanical and 13 electrical with two

separate union bargaining units. Responsibility included

monitoring and controlling cost accounts and overseeing special

projects. Initialized a plant wide preventive maintenance

program establishing regular maintenance on all equipment.

Process Superintendent- Responsible for total plant engineering

including capital projects, energy conservation and

environmental affairs. Personnel report to me included three

engineers, two drafts persons and two consulting firms. Major

projects included the design and installation of a 50MW calcium

carbide furnace (mechanical, structural, and electrical

components), automated material handling system for raw and in-

process material, the design and installation of a coke storage

and processing facility and the installation of finished pad and

warehouse storage.

12/74-9/78 Consulting Engineer (Self Employed), Louisville, KY

Owner Senior Test Engineer - Testing firm involved in the Pollutant

Emission testing of facilities for compliance with State and

Federal Clean Air Standards. Report submitted and testimony

provided as required on emissions for each specific location

tested. Testing included all EPA air standards as of that date.

5/74-11/74 Ford Motor Company - KY Truck Plant

Industrial Engineer - Industrial Engineering Department responsible

for labor allowances for special units, Establishing line speeds

and labor tasks based on required throughput

.



Contact this candidate