Post Job Free
Sign in

Engineer Design

Location:
Sunnyside, NY, 11104
Posted:
April 19, 2010

Contact this candidate

Resume:

Koray Cinar

Page

Title per EOI: Civil Engineering Task Leader

Education: Master of Engineering, Civil Engineering; Yildiz Technical University, Turkey (2004)

Bachelor of Science, Civil Engineering; Yildiz Technical University, Turkey (2002)

Training&Skills: AutoCAD, AutoCad Land Desktop, Civil 3-D, MicroStation, InRoads, Vectorworks, HydroCAD, StormCAD, Pond Pack

Membership: American Society Civil Engineers

Mr. Cinar is a civil engineer with proven experience providing engineering design, including site layout drawings, construction documents for transportation, industrial, educational facilities, and commercial facilities, as well as site development projects. He has over 8 years experience with site layouts, utility layouts, field surveys, sanitary and water service design, grading and drainage design, structural design. Mr. Cinar has expertise in hydraulics and hydrogeology, stormwater management, erosion and sediment control and associated permitting.

Project Experience

PA NY/NJ World Trade Center/Hub Station - Project Engineer/Task Leader

Conducted project coordination with Port Authority, general contractors, architects and other disciplines for the design development of proposed Hub Station. Providing grading and drainage design for proposed Hub Station, utility connection design including water, fire, sanitary and storm sewer for the new towers and the proposed Performing Art Center in downtown Manhattan. He has also prepared associated specifications and provided shop drawings review for this project. (2008-2010)

NJTA Patcong Creek Bridge over Garden State Parkway- Senior Project Engineer/Civil Engineering Task Leader

Conducting civil/highway engineering design tasks including Grading&Drainage, Profiles, Cross- Sections, Erosion and Sediment Control, Stormwater Management, MPT, Retaining Walls for the development of Patcong Creek Bridge Project. He is also coordinating with NJ Turnpike Authority Program Management, Environmental and Structural Sub-Consultants, NJDEP, US Coast Guard. He is also responsible for budget control, quality control, invoices and other outstanding deliverables.(2010)

LIRR Little Neck Parkway Quiet Zone/Railroad Crossing Zone- Project Engineer

Providing site layouts and construction details for the design development of Little Neck Parkway Quiet Zone in Queens,NY. (2008)

TBTA Marine Parkway Gil Hodges Memorial Bridge Drainage Improvements - Project Engineer/Task Manager

Providing drainage design for the Marine Parkway Gil Hodges Memorial Bridge Facilities Building near Rockaway Inlet in Brooklyn, NY. Mr. Cinar coordinated the work with TBTA Engineers and the contractor. He also prepared construction documents along with associated specifications for this project. He also provided construction support to the contractor during construction phase of this project. (2008)

NYCDDC Roma and Hett Avenue Area Improvements - Project Engineer

Providing roadway profiles for the final design and conducting sustainable drainage solutions for alleyways in the New Dorp Beach area in Staten Island, NY. (2008)

NYSDOT Maintenance and Repair of 40 Bridges - Civil Engineer

Providing Maintenance and Protection of Traffic Plans for 40 bridges in Manhattan, the Bronx and Richmond County, NY. Mr. Cinar also conducted construction staging studies and prepared construction staging charts for this project. (2008)

NYSCA Spring Creek School - Civil Engineer

Providing site layout design, field surveys, and stormwater management design for this school in Brooklyn, NY. Mr. Cinar is providing sanitary, gas, and water (domestic and fire protection) design layouts and connections; grading design; and sidewalk layout. He is also coordinating with NYCDOT, NYCDEC, NYCDEP, and all applicable utility companies. He also prepared sustainable design report for the Leed Certification of this project. Mr.Cinar also prepared specifications for this project. (2008)

Metro-North Office Facility Renovation - Engineer

Providing civil design for the renovation of the Northern wing of a multi-level, 1950s-era building. STV is providing programming and architectural and engineering design services for the renovation, which involved architectural, structural, civil, HVAC, and electrical design including fire alarm, communications, security, plumbing, and fire protection systems. The facility will include operation and control centers, a power control area, operational support facilities, office and conference space, systems and services space, and an extensive computer center. (2008)

SUNY Stony Brook Research and Development Campus Master Plan - Design Engineer

Providing grading design and stormwater management plans for the site development and roadways for a proposed 308-acre Research and Development (R&D) campus at SUNY Stony Brook in Stony Brook, NY. The master plan seeks to provide an efficient and attractive use of the site, respecting its topography and planting, and relating the future use of the site to its present appearance as a largely undeveloped parcel. The site is organized around a new internal road, which generally follows the shape of the property. (2008/2009)

NYCT Subway Station Condition Surveys - Team Leader

Inspected and provided condition ratings for 109 subway stations throughout New York City. Mr. Cinar also assisted in the development of condition guidelines for all stations. (2006/2007)

Troy LLC Troy Subdivision Development - Project Engineer

Provided site plan, grading, utility, and stormwater management design for this residential development in Westchester County, NY. Mr. Cinar also conducted site inspections and obtained NYSDEC and Westchester County Health Department permits. (2006)

WN Weaver Street, LLC Cherry Lawn Subdivision - Project Engineer/Technical Manager

Provided site plan, grading, utility, and stormwater management design for this 26-lot residential development in New Rochelle, NY. Mr. Cinar also conducted site inspections and obtained NYSDEC and Westchester County Health Department permits. In addition, he provided construction cost estimates. (2005/2006)

Private Client Town and Country Senior Apartment Complex - Senior Project Engineer

Coordinated architectural design, including stormwater management and grading and utility designs, for this 75,000-sf senior housing complex in Mount Kisco, NY. The facility included indoor parking, libraries, a fitness center, and restaurants. (2006)

Tryko Holdings, LLC Basher Kill Subdivision - Senior Project Engineer

Provided engineering design for sanitary sewer pump stations, grading, and road profiles for this 385-lot subdivision on 635 acres in Orange County, NY. Mr. Cinar provided earthwork reports and coordinated the design of 24 extended detention ponds on the site. (2005)

Lowes Various Retail Site Developments - Design Engineer

Provided site plan, grading, stormwater management, and sanitary sewer design plans and assisted in permit preparation for Lowes hardware store sites in Riverhead, Hempstead, Islip, and Brookhaven, NY. (2004)

CCB Holdings 10100 Bevans Lane Residential Development - Design Engineer

Conducted hydrology studies as part of a feasibility and due diligence study for the development of a 16-acre site located at 10100 Bevans Road in Middle River, MD, to accommodate a large residential subdivision of 31 single-family lots. (2003/2004)

Forest City EBDI Infrastructure Master Plan - Engineer

Prepared construction documents for water and sanitary sewer design to support the preparation of an infrastructure master plan for an 80-acre urban inner-city mixed-use development known as East Baltimore Development Inc. (EBDI) in Baltimore, MD. This master plan requires evaluation and reworking of existing systems to accommodate the new infrastructure and development. (2003/2004)

Baltimore Development Corporation Hollander Ridge Business Park - Project Manager

Conducted grading and earthwork for a 52-acre business park campus of flex and warehouse sites along the I-95 corridor in Eastern Baltimore, MD. The site involved extensive earthwork and engineering, but is located in an ideal location for visibility and access. (2004)

Land Development Services King Avenue at Franklin Square Drive - Design Engineer

Conducted hydrology studies for the development of 90 townhouses in White Marsh, MD. The project site included layout of stormwater management, roads, and landscaping. (2004)

Struever Bros. Eccles & Rouse American Can Building - Design Engineer

Conducted water meter and clear water connection design for a 12,000-sf retail building for the American Can Company in Baltimore, MD. The site consisted of 195,000 sf of two major industrial buildings and a connecting structure which formerly housed the company’s boiler house. The design team had to work within the constraints of both an urban renewal plan and a planned unit development. The Can Company was the first project completed under the new brownfields legislation of Maryland’s nationally acclaimed Smart Growth initiative. (2004)

Rolling Oaks II Development Residential Subdivision - Design Engineer

Prepared Public Works Administration exhibits “A” and “B” and cost estimates for the development of this 14-acre residential site for the development of 33 houses in Baltimore County, MD. (2004/2005)

Struever Bros. Eccles & Rouse Gunther Headquarters Design Development - Design Engineer

Conducted grading and computer-aided drafting and design (CADD) work for the design development of the Gunther headquarters in Baltimore, MD. (2004)

Monmouth County Red Banks Storm Drain and Conceptual Storm Water Management Design - Design Engineer

Prepared storm drain design and conceptual storm water management for the bid design of the 4-building commercial facility in Red Bank, NJ. (2004)

NCA Calverton National Cemetery Gravesite Expansion and Columbarium - Engineer

Revised roadway profiles and the main water design for the expansion of the Calverton Cemetery Gravesite in eastern Long Island, NY. The expansion included a new cemetery entrance, a public restroom with a gravesite locator, completion of the roadway system, site furnishings, site signage, grading and drainage, utility distribution system, irrigation system and water sources, and landscape plantings. (2004)

Cowan Systems Inc. 1910 Halethorpe Farm Road - Engineer

Conducted field studies and prepared earthwork estimates and hydraulics for the design development of a proposed trucking facility at 1910 Halethorpe Farm Road in Baltimore County, MD. The client is investigating the possibility of utilizing another site, and this project has been placed on hold. (2004)

Silo Point LLC Silo Point Phase II - Design Manager

Provided conduit design, computer-aided drafting and design (CADD) documents, and hydraulic study information for the master plan of an adaptive reuse of an existing 297-foot-tall grain elevator and silo structure on a 15-acre abandoned industrial site in Baltimore, MD. The site development includes a 1,100-car parking garage within the preserved shell of the silo building; a mix of condominiums, offices, hotel, and a restaurant in the grain elevator; and a new 15-story building. The southern half of the site includes 116 new townhouses designed to complement the existing residential fabric of the Locust Point neighborhood. A 3-acre linear park links the various uses on site, provides outdoor gathering spaces appropriate for each building and use, and establishes a physical connection for public use between North Locust Point, Fort McHenry National Monument (a popular recreational destination for area residents), and the city’s waterfront promenade. (2003/2004)

Associated Jewish Charities of Baltimore Park Heights New Social Services Building - Design Engineer

Provided design for stormwater management and utilities for a new 3-story, 45,000-sf Social Services building to replace the 30,000-sf Greenstein Building on the agency’s 6.8-acre Park Heights campus in Baltimore, MD. STV provided a stormwater management master plan, which was key to this design. The firm designed one uniform system to handle runoff of the JCC addition, the new Social Services building, and the future redevelopment of the Baltimore Hebrew University. (2004)

Private Client Rodgers Forge Condominiums - Designer

Conducted field work and prepared construction documents for the Rodgers Forge Condominiums in Towson, MD. This project involved the renovation of 119 buildings, each with 4 to 5 units, and was divided into separate phases. (2003/2004)

A&R Development Breco Condominium 309 East Saratoga Street - Project Engineer

Provided water meter design, cost estimates, utility profiles, and computer-aided drafting and design (CADD) documents for an 8-story renovated building with 38 residential units and parking in the lower level, located at 309 East Saratoga Street in Baltimore, MD. (2003)



Contact this candidate