Post Job Free

Resume

Sign in

Project Manager Engineer

Location:
Morrow, OH, 45152
Posted:
April 20, 2010

Contact this candidate

Resume:

PROFESSIONAL SUMMARY

Robert E. Anderson

**** ****** **.

Morrow OH 45152

513-***-**** (cell#)

SUMMARY OF EXPERIENCE:

All relevant experience was gained during twenty-six years

of employment in the Engineering and Engineering Support Fields. This

includes over 1 year with Jedson Engineering, two years with Parsytec,

over four years with Gem City Engineering, eight years with Wright

Industries, four years with The Fairfield Engineering Company, and seven

years with the Babcock & Wilcox Company.

SIGNIFICANT EXPERIENCE:

JEDSON ENGINEERING (2008- Present)

CONTROL SYSTEM PROJECT ENGINEER

Manage and execute control system projects which include identifying and

specifying instruments, controls (stand-alone, PLC, and DCS based).

Create drawings and software programs to represent various machines and

manufacturing processes. Oversee manufacturing, installation and start-up

of systems. Participate in reviews involving clients and sub contractors.

Interface with clients via email, phone and various drawings,

spreadsheets, and databases. I have recent experience in the Power

Generation, Pulp & Paper, and Family Care Product Industries. I have

experience specifying, designing, configuring, programming, and starting-

up many different PLC Systems (Allen-Bradley, Siemens, Omron, Modicon,

etc.) and DCS's (Honeywell, ABB, Foxboro, Emerson, etc.). I have also

specified, designed, configured, and started-up many HMI's (Human Machine

Interfaces) such as Wonderware, PanelView, Panelmate, etc. I am very

experienced with Combustion, Burner Management, and Material Handling

Controls.

PARSYTEC, INC. (2006 - 2008)

TECHNICAL MANAGER FOR AMERICA

Managed four Field Service Engineers and managed multiple projects which

included the technical oversight of installing and servicing Inspection

Systems for the Metals and Paper industries. Upon receipt of a purchase

order, a meeting is scheduled to transfer the project from sales to me

as a project manager. Arrange a Kick-off Meeting (KOM) with the customer

and provide the technical information required for the customer to

mechanically and electrically integrate the system into the process line.

Insure that the system is manufactured to the customer's specifications

and accompany the customer to the Factory Acceptance Test (FAT) in

Germany. Monitor progress, initiate invoices, and insure on time

delivery to the customer's site. Schedule and manage the Field Service

Engineer's that oversee installation and commissioning at the customer's

site. Once a system is installed, support sales of spare parts and

service of the systems. I have implemented a 24/7 telephone support

group. Coordinate all functions with headquarters in Germany and provide

upper management with various reports on the status of business in all of

the Americas (North, Central, and South).

THE GEM CITY ENGINEERING COMPANY (2002 - 2006)

BUSINESS DEVELOPMENT MANAGER

Project Manager/Applications Engineer on Process and Assembly Machine

Projects

Completed cost estimates, schedules, and proposals. Upon receipt of a

purchase order, assume the project manager role and manage material,

equipment, financial and human resources required to execute design and

build projects in the industries we service. Personally, developed

accounts with 1st tier automotive suppliers like GECOM, Aisin, and

Holley. These accounts have generated over $8 million dollars in revenue

for GCE over the last four years and have lead to significant profit

margins. Overseen the projects, provided mechanical,

electrical/controls, and software design concepts for the machines and

systems, provided controls schematics and written software when other

resources have not been available. Completed mechanical designs,

conducted project design and post-mortem reviews of projects to improve

the company's capability and profitability. Developed the GECOM account

starting with the design and build of one test machine to designing and

building 48 machines (3 different assembly lines) within a 20 week window

over the Thanksgiving and Christmas Holidays. For Aisin, developed the

account from nothing into 2 assembly lines for two different products.

Developed the Holley account from a trade show bingo card to a multi-

million dollar business deal which included 2 assembly lines and EOL (End-

of-Line) Test Machines.

RTS WRIGHT (1994 - 2002)

CONTROL SYSTEMS PROJECT ENGINEER

Project Engineer on Process and Assembly Machine Projects

Engineered a tractor- trailer box loader and a pre-form heating &

handling system. Engineered, built and installed a roll resurfacing

machine, two battery assembly machines, two roll handling machines, an

air bag inflator assembly machine, auto body assembly line, and three ink

jet pen assembly machines. All of these machines have used PLC based

machine controls, PC base supervisory controls, robots, vision systems,

numerous servo controls, pneumatics and hydraulics.

THE FAIRFIELD ENGINEERING COMPANY (1990 - 1994)

VARIOUS

BUSINESS DEVELOPMENT MANAGER

Responsible for business development of bulk and unit material handling

systems, civil/structural engineering, and electrical/controls

opportunities. Specific duties included marketing plans and activities,

sales, application engineering, estimating, pricing, proposal

preparation, and lead-finding qualified inquiries. Starting with only my

own contacts, expanded client database to include over 250 potential

customers and called upon them regularly. In less than a two year period

secured bidding opportunities for ten million dollars of equipment and

services and was successful in closing orders for over two million

dollars.

SR. ELECTRICAL & CONTROLS PROJECT ENGINEER

Responsible for the post-order execution of electrical and controls

projects. Analyze application and specification requirements to develop,

implement, and oversee encompassing execution plans that lead to the

successful completion of the projects.

BABCOCK & WILCOX COMPANY (1983 - 1990)

VARIOUS

Held the following positions and successfully mastered the

responsibilities described below. I have managed projects for the

following companies; Ohio Edison Company (Edgewater Plant), Orlando

Utilities Commission (Stanton Energy Station, Unit #1), Duke Power

(Belews Creek), Dayton Power & Light (Stewart Station), Georgia-Pacific,

International Paper, Champion Paper, and others. My projects included

replacement of water walls, superheater, reheater, and economizer tube

sections, burners, pulverizers, coal tubes, and control systems. At

Champion Paper, removed two entire Process Recovery Boilers inside of the

building and built new ones in their place; control systems and support

equipment were also removed and replaced. Developed the execution plans

within budget and schedule restrains. Oversee mechanical, electrical,

controls, and manufacturing engineers to complete the projects. Intercept

and resolve customer requests and issues.

CONTRACT MANAGER

Responsible or post-order management of multi-discipline projects and

resources required to provide deliverables to the customer as defined by

the specifications, project proposal, purchase order, as subsequent

correspondence. Projects included Department of Energy (DOE) "Clean

Coal" Programs, Utility, Process Recovery (Pulp & Paper), and Industrial

Boiler systems and components. Duties included cost management,

reporting, oral and written correspondence between internal personnel,

suppliers, and the customer. The position required good product

knowledge, computer skills, manufacturing process awareness, leadership,

personnel management and other resource management skills.

INSTRUMENTATION AND CONTROLS ENGINEER

Project Engineering duties including process control system design.

Typical project tasks include, the design of analog control loop logic,

control cabinet layouts, equipment specification, and cost evaluation.

These tasks were applied to Burner Flame Safety Systems, Boiler

Combustion Control Systems, Motor Control Centers, and other auxiliary

control systems used in the Utility and Industrial segments of Power

Generation Industry. Programming and configuration experience with

Programmable Logic Controllers (PLC) based systems and larger Distributed

Control Systems (DCS) based systems were acquired.

DIAGNOSTIC SYSTEMS ENGINEER

Responsible for Project Engineering, Product Development, Field Service,

and Marketing of turnkey projects for SYSTEM 140 (TM) products. SYSTEM

140 products provide on-line real time performance analysis of boiler and

power plant components using dedicated desktop computers. Hewlett-

Packard Series 9000 (Models 800, 500, & 300), Series 80, Bailey Network

90, Westinghouse WDPF, and Foxboro I/A experience. Hewlett-Packard

Certification for HP-UX operating system. Experience in BASIC, C, and

FORTRAN programming languages.

MILITARY EXPERIENCE:

2002 - 2004 Director of Operations, Group 3, TN Wing, CAP

1999 - 2002 Commander 183rd Nashville C.A.T.S., TN Wing, CAP

1998 - 2001 Pilot/Officer in the Missouri Air National Guard

1995 - 1998 Pilot/Officer in the Tennessee Air National Guard

1988 - 1991 Pilot/Officer in the Missouri Air National Guard

1983 - 1988 Pilot/Officer in the Ohio Air National Guard

1979 - 1983 Pilot/Officer in the United States Air Force

In addition to piloting duties, responsible for overseeing Department of

Defense (DOD) projects which included aircraft systems modifications.

Visit contactors to inspect and verify deliverables and performance were

in compliance with the specifications of the project.

EDUCATION:

Electrical Engineering, Ohio State University

College of Electronic Engineering Technology, Community College of the

Air Force



Contact this candidate