Professional Experience
. Develop and integrate new manufacturing processes or improve current
process capability into existing plants.
. Part of the manufacturing team that launched and build of the two (2)
new assembly plants- Jeep Liberty and the 45RFE Transmission plants
. Responsible for improving efficiency and productivity on new and
existing products.
. Recommendations for equipment needed for plant operations including
plant flow and layout requirements.
. Ability to develop solutions to engineering and manufacturing problems
with the use of data collection, analysis, product design, equipment,
sequence of operations and tooling.
. Troubleshoot processes and equipment issues using 5 Why and FMEA's to
determine root cause of failures.
. Ability to give high level presentations to management along with
weekly reports on project issues, progress and process improvements.
. Full knowledge of all Microsoft office programs- excel, word, power
point and projects for timelines.
. Manage all project issue meetings and timelines during the design,
build, ensure plant safety, debug, install and launch/pilot build
phases of a program.
. Responsible to ensure that the supplier is conforming to all corporate
specifications.
. Interfaced with cross functional team this included manufacturing
engineering, product design, purchasing, production, suppliers and
installation contractors.
. Coordinated contractor trades during the design, build and
installation of tooling/automation equipment.
. Managed the mechanical design and controls design for the
manufacturing tooling for lean manufacturing process and cost
effectiveness.
. Responsible for writing all quote packages, running bid meetings and
quote/supplier review for all assigned projects.
. Use of Nachi and ABB robots; Cognex and Perceptron vision systems;
Nordson urethane and primer dispense units; Atlas-Copco and Stanley
nut runners
. Ability to write and debug PLC software.
. Ability to troubleshoot controls panel wiring
. Ability to reconfigured cells and plant layouts to accommodate new
products with automation equipment or assist operators.
. Responsible for preparing the cost justification for equipment and
plant facility requirements and managed all financial cost tracking of
projects.
. Ability to train operators on new equipment and process improvements.
. The use of Six Sigma repeatability tests to ensure the tooling meets
the proper dimensionally correct GDT and KanBan to ensure part
orientation requirements for the highest quality.
. Lead the DFMEA and PFMEA reviews on the equipment to determine
potential problems and create corrective actions if necessary.
. Ability to use Catia V5 to review parts, AutoCAD to create plant
layouts, Microsoft Projects to create/update timelines, PowerPoint,
Excel and Word
. Able to travel and work overtime as necessary. Passport acquired.
____________________________________________________________________________
__
Companies, Positions Held, Projects
Chrysler Corporation- Auburn Hills, MI 1995-2009
Advance Manufacturing Engineer
Truck Platform-Body-in-White Group
. 2009 Dodge Ram - St. Louis North Assembly plant
o Box Outer line automatic robotic welding system
. 2008 Chrysler Aspen and Dodge Durango - Newark, Delaware assembly
plant
o All tooling needed for the Fender assembly robotic weld cell
upgrade, Fender setter automatic cell, Hood install, lift gate
install and door install.
Minivan Platform- Trim/Chassis/Final Group
. 2004 Stow and Go - St. Louis South and /Windsor, Canada Assembly
Plants
o Tub insertion automatic robotic cell and Prime automatic robotic
cell
o This system eliminated 12 operators from each plant for a $1.2
million savings per year.
Jeep Platform - Trim/Chassis/Final Group
. 2003 Jeep Cherokee / 2004 Jeep Commander - Jefferson North Assembly
Plant Detroit, MI
o Reconfigured windshield, quarter glass and roof glass
installation cell to accommodate the 2003 Cherokee, 2004
Commander and 1998 Cherokee.
. 2001 Jeep Liberty - Jeep Assembly Plant Toledo, Ohio
o Automatic robotic windshield and quarter glass install cell
o All tooling and assist arms to install the Lift gate glass,
wiper modules and washer system
o Temperature Compensation Units for Transmission fill
. 1998 Cherokee - Jefferson North Assembly Plant Detroit, MI
o Managed the concept design team for the temperature compensation
transmission fill units. These units would determine the
temperature of the ATF transmission fluid and then automatically
fill the transmission to the correct level.
Power train Platform - Transmission Group
. 1997 45RFE transmission - Indiana Transmission Plant Kokomo, Ind.
o Responsible for coordinating the plant layout and installation
of the sub-assembly and final assembly areas.
ABB Robotics Corporation-Auburn Hills, MI 1993-
1995
Program Manager
. Automotive tooling supplier that design, build and install
manufacturing equipment.
. 1996 Chrysler minivan glass cells for the Windsor, Canada and St.
Louis South assembly plants.
Douglas and Lomason Company- Farmington Hills, MI 1989-1993
Program Manger/Manufacturing Engineer
. Tier 1 supplier of automotive seating and exterior body side moldings
. 1992 Chrysler Intrepid / Concord - Bramelea Assembly Plant -Bramelea,
Canada
o Production of the "B" and "C" pillar
. 1992 General Motor's full size truck built in the Arlington Assembly
Plant -Arlington, Texas
o Production of the rear jump seat
. Manufacturing Engineer based out of corporate head quarters for 13