Post Job Free
Sign in

Engineer Process

Location:
New Kensington, PA, 15068
Posted:
April 27, 2010

Contact this candidate

Resume:

Domenic E. Verdini (email- abmwqh@r.postjobfree.com)

**** ********* ***. ******, **. 15068 Home Phone 724-***-****

Cell 412-***-****

VP of Operations at Dielectric Solutions

**** ** **** (College)

. Salem College, West Virginia ( Accounting)

1973 to 1977 (PPG/GRTL)

. Formed and laminated fiber glass mat for Azdel

1977 to 1985 (PPG Fiber Glass Research)

Group Supervisor/Furnace Operator -

. Supervised a crew of five people maintaining furnace and forming

operations.

1985 to 1993 (PPG Fiber Glass Research)

Process Technology Transfer Engineer - Working closely with the

Chemist, was responsible for the successful Technology Transfer of all RP

and Textile products to the Shelby and Lexington Manufacturing facilities.

Products successfully transferred include the following:

. 5509/5524/5538 SMC

. Hybon 6100/6700 Gun Roving

. 7812 Panel Roving - High split (80 to 100%) forming process from 2-way

to 8-way splits with acceptable payout and thin tube waste.

. MPM forming process

. Double package Direct Draw Process.

. Shimatzu winder optimization.

. 690 G75 Textile product

. Responsible for all Technology Transfers for Reseach to the

Manufacturing facility in Shelby, N.C.

1993 to 2001(PPG Fiber Glass Research/Shelby)

Senior Process Engineer for RP

. Commercialized a 125 lb forming package for the remote Wet chop

process.

. Commercialized Multi-end Direct Chop Process for M-fiber, K-fiber, and

G-fiber.

. Improved binder JE by 7% ($2.5MM savings) through optimization of

Binder Delivery Ratios at Shelby.

. 80 hours of Sigma Logic Training

. International travel experience to England and the Netherlands

2001 to 2003 (Dielectric Solutions)

Process Engineer

. Responsible for forming and roving departments. Also have customer

relation responsibility for promoting our new roving product.

. International travel experience to China

2003 to 2007 (Dielectric Solutions)

Director of Operations

. Responsible for all Plant production operations that include forming,

warping, prep, weaving, and maintenance. Also oversee the Process

Improvement Department. (Total of 52 people).

2007 to Present (Dielectric Solutions)

VP of Operations

.

. Same as above with Company Board decision input.



Contact this candidate