Post Job Free
Sign in

Maintenance Electrical

Location:
Raceland, LA, 70394
Posted:
April 30, 2010

Contact this candidate

Resume:

TRACY J. HEBERT

*** * ***** ***** ********, LA **394

Cell Phone: 985-***-**** Home Phone: 985-***-****

abmwkh@r.postjobfree.com

PROFILE

Twenty Four years of combined experience with Instrumentation, Controls,

3

Electrical/Electronics, Computers(Hardware/Software), Business Management and Sales.

Strong Troubleshooting and Supervisory skills

4

Familiar with all phases of the offshore oil and gas industry and Refineries.

5

EDUCATION

Nicholls State University Thibodaux, LA

Pursuing a Bachelor of Science in Electrical/Software Engineering January 2008 –

Present

CERTIFICATIONS AND TRAINING

PLC School Diploma, George Brown University 2010

5

Certified on Powell Switchgear/MCC by Powell in 2004

6

Licensed Electrician since 1995

7

Licensed Satellite Installer in 2000

8

PEC Certified 2009

9

T 2 Certified, Crane and Rigger Certified 2009

10

Electrician School Diploma, I.C.S. Scranton PA 9/1997

11

EXPERIENCE

Shamrock Management

SR. I & E Technician/Omni PLC Technician/I & E Inspector/ September 2008 – Present

Installed remote PLC for Shell pipeline and upgraded communications to Ethernet on Booster

1

Pump PLC’s. Ran tubing for new pneumatic panels on Black Elk platform. Built Generator and

Measurement Skid packages in shop.

Did hurricane repair work for Noble Energy, Energy XXI, Mariner Energy. Repairs consisted of

2

rewiring MCC’s, Living Quarters, Generators and controls, PLC’s, Lighting,

Air Conditioners, Gaitronics, Nav Aids, Motor Starters, Fire pump controls, Pipeline pump motors,

3

and charge pump Motors on LACT units.

Also did service calls consisting of troubleshooting Omni flow computers, PLC’s, Generators,

4

pneumatic engine controls on Compressors, Pipeline pump motors, charge pump motors,

pneumatic level and pressure controllers, Temp.&Press. Transmitters, Samplers, and 4 way

valves on measurement skids. Did quarterly tests of Fire and Gas systems and Nav Aids.

Acted as I/E Inspector for Chevron Pipeline in Upgrading of Omni/Scada systems for Forked

5

Island Gathering system.

Portrait Du Monde

Photography Studio

Business Manager August 2002 – September 2008

Software Designer, Network Administrator, Electronic/Electrical Maintenance, Book Keeping &

6

Accounting, Supplies & Sales, Photographer, Carpenter, Internet Website Constructor and

publisher.

Greystar

Maintenance I & E Tech on B.P. Thunder horse PDQ January 2004 – September 2004

Supported commissioning in all phases of start up on topsides.

12

Worked with Robicon representative on VFD’s.

13

Worked with Dresser Rand reps. on turbine control panels.

14

Witnessed and signed off on running of 13.8kv motors and switchgear.

15

Helped implement critical training protocols for Thunder horse I/E equipment.

16

Integrated topsides onto the hull.

17

Deepwater Specialists Inc.

Commissioning of B.P. Mad Dog Platform 2/10/03 – 12/20/03

14 Commissioning of all electrical equipment including but not limited to 4160V Switchgear controls,

Line Starters for 4160V motors, 480V motors and starters, 4160V X formers controls, battery

chargers, nav aids, PLC’s and UPS systems.

15 Did Loop checks on all platform control systems, fire water pump controls, pipeline pump controls,

motors for pumps on VRU skids, chemical injection skid, Helifuel skid, Omnipure system, etc.

Oilfield Production Contractors Inc.

Maintenance I & E Tech. for Devon Energy March 2002 – January 2003

21 Troubleshooting and repaired power modules on compressors, throttle link on generators, 2301

controls on generators

22 Soldered parts for generators and switched generators over every Sunday

23 Troubleshooting and repaired pipeline pump controls, adjusted vibration switch for PAX pumps,

put indicator lights on PAX pumps.

24 Repaired System 3 fire alarm panels, Gaitronics, Nav Aids, Battery Chargers, Lighting, fuel

aviation pump controls, A/C units for living quarters.

25 Coordinated with vendors to get material and parts fixed.

26 Conducted quarterly inspection on fire and gas systems, worked on all MMS compliance issues in

a field of about 30 platforms.

27 Ran tubing for equipment where needed, also helped operators do well tests, shake outs, sample

pot readings and get production numbers from LACT meters and Gas meters etc.

C&D Production

Maintenance Electrician on Shell Auger January 2000 – February 2002

Dried or changed out bad generators, troubleshoot and repaired HVAC controls, elevator controls

28

Calibrated and tested gas detectors, UV/IR detectors, nav aids

29

Conducted dead bus test on E Gen as required by U.S.C.G.

30

Ran E Gen and put on load bank every Sunday.

31

Conducted PM’s and CM’s on Power Modules, MCC’s Generators, VFD’s every day, changed out

32

bad x mitters on BGC,

33 Conducted Pilot testing on LI’s and PI’s for MMS etc.

34 Worked a (14 14) rotation.

Automation USA

I & E Tech/Control Panel Specialist/ Job Supervisor February 1996 – January 2000

38 Ran cable tray, pulled cable, cut in and glanded cable, mounted panels, x formers, disconnects,

ordered parts, built control boxes, ran conduit, drew up schematics for control wiring for Williams

Energy.

39 Installed and terminated PLC’s and annunciator panels for Ocean Energy.

40 Ran tubing for and installed new bs & w probe and sampler on LACT skid and also installed 2

SCADA systems for Apache in Black Bay.

41 Bid on fire & gas alarm job for Dynegy in Venice, LA. and supervised crew for installation.

42 Supervised crew for power generation package installation for Dominion Oil at S.S. 242.

43 Refurbished 2 compressors for El Paso in Eunice by rewiring all instruments, valves, turbos,

running new conduit, running new tubing for PT rack.

44 Ran 1 inch tubing on new WHRU for Kerr McGee Boom Vang.

45 Demoed Solar Turbines for Chevron at E.I. 152.

46 Upgraded SCADA units for Chevron South Timbalier 52.

47 Laid out stud run for instruments using P & ID Prints on Kabinda in Shaw yard.

Excel/ISC

Electrician February 1994 – January 1996

Ran cable tray, pulled cable, hooked up 13.8 X formers installed new 4160V switchgear

43

Installed new variable frequency drive and DC drive starters with PLC controls.

44

Hooked up lighting and fans

45

Installed new PLC cabinets

46

Installed, hooked up and loop checked and calibrated field instruments at Texaco Refinery, Orion,

47

Carbide, Monsanto.

P.M.C.S

Jr. Tech. /Instrument Tech. December 1991 – January 1994

Ran tubing (auto clave, SS, copper 1/4"to 1") for compressors

51

Ran conduit for compressors

52

Wired up compressors and M.O.V.’s.

53

Pulled cable and ran cable tray

54

Terminated PLC J.B.’s, lighting, motors, battery chargers, instruments.

55

56 Tubed up wells, put up stanchion lights, ran all the tubing for Popeye skid in Green Canyon.

57 Terminated annunciator panels.

58 Did construction, commissioning and maintenance on Shell Auger.

U.S. Air force

Civil Engineering 12/15/87 – 12/15/91

52 Conducted regular maintenance and construction on base and on deployments.

TRACY J. HEBERT

235 B Laris Drive Raceland, LA 70394

Cell Phone: 985-***-**** Home Phone: 985-***-****

abmwkh@r.postjobfree.com

REFERENCES

Mr. Curt Chiasson

Chevron Field Control Systems Technologist

Raceland, LA

985-***-****

Mr. Brian Minchew

L.D.W.F. Agent

Raceland, LA

985-***-****

Mr. Roddy Ponson

Chevron I & E Tech.

Raceland, LA

985-***-****



Contact this candidate