Post Job Free
Sign in

Manager Project

Location:
Wake Forest, NC, 27587
Posted:
April 19, 2010

Contact this candidate

Resume:

Anne K. Russell

**** ********* ***** **** ****** NC 27587 919-***-****

abmwi9@r.postjobfree.com

http://www.linkedin.com/in/annekemprussell

OBJECTIVE

Hard driving and focused individual with sound academic credentials.

Facilitates the supply / demand balance process and Import/Export of

equipment and supplies. Aggressively pursue Continuous Improvements.

Seeking new opportunities to contribute to the efficiency and

effectiveness of a performance driven organization.

Areas of proficiency include:

. Conducting Kaizen Events

. Production Planning/Scheduling

. Document Control

. Inventory Management

. Quality Control in cGMP

. Import/Export

EXPERIENCE

PROJECT COORDINATOR PBM Graphics Durham NC 2/09-6/09

Layout manufacturing area for new robotics equipment included a secured

area. Set-up and formatted a new per piece rate system for the temporary

labor force.

INDUSTRIAL ENGINEER Covidian Mallinckrodt Raleigh NC 12/07-

7/08

Time Studies for the packaging department that manufactures API. Cycle

time for optimal productivity. Set-up a training program for Supervisors

on Lean Manufacturing. Facilitated Kaizen events. Participated in

Customer Audits.

. Set-up results from a QIP in MS Project for follow through

requirements

. Use BPCS & Time Studies proved Standards were 20% higher than actual

. Worked with Operational Excellence group to perform 5S and PDCA

OFF-RAMPED Raleigh NC

5/03-11/08

Finished Thesis for Masters program. Project manager for rare antique

automobile restoration. Published two articles in National Magazines.

Volunteer with the elementary school math program. Lead Planner for a

WWII Reunion in 2010. Historical research for the Daughters of American

Revolution (DAR). Ran a daycare co-op.

SUPPLY CHAIN MANAGER Nycomed, RTP NC 8/00-4/03

Maintained and monitored inventory of $1 million for a start-up MRI

research site using cGMP and pcMRP version 7.04B. Maintained Monthly

financial reports to corporate within +/- 0.75%. of actual.

. Developed and managed the inventory strategy for an on going balance of

component parts, demand for quality, scope, time and cost. Fixed asset

budget.

. Lead the effort to evaluate, plan, and implement construction of a new

larger warehouse, doubling the space.

. Layout new Lean manufacturing area for an increased production of over

50%.

. Coordinated delivery of $10 million of MRI equipment and Chemicals to 5

Global locations.

LOGISTICS MANAGER Ferro Ceramics Niagara Falls NY 3 /96-

1/99

Monitor inventory control in a 75,000 square foot JIT warehouse for both

inbound and outbound stock orders with appropriate carriers for an

ISO9001 company. Coordinated the joining of two separate computer

software systems. Served in start-up phase of new computer bar coding

system activated with JD Edwards system.

. Supervised and trained warehouse personnel. Perform technical writing

and implementation of Standard Operating Procedures (SOPs).

. Integrate all item master, planning, scheduling, execution, quality,

change order, and cost information into one management system.

. Deployed warehouse bar code system

. Batch processing, configuration management, supplier release

scheduling, lot tracing and tracking.

Process Control

6/95 -2/96

Product Manager Assistant 3/93-5/95

Physical Process Control 1/91-

2/93

Fujisawa Pharmaceutical Corporation, Grand Island, NY

In-process Quality Control of manufacturing. Evaluated and monitored

finished product reserve samples. Promoted to write and perform equipment

qualification test. Wrote SOPs under cGMP and FDA guidelines. Interacted

with Metrology and Microbiology Departments for development and

calibration of production equipment and sterilizers. Interacted with

manufacturer's representatives to ensure production line equipment

integrity. Promoted to tracking and time studying production on a daily

basis for the VP of Finances.

. Selected for start-up project phase of new $10.5 million Becton-

Dickinson pre-filled glass syringe manufacturing line in a clean room

environment.

. Established and performed IQ, OQ, and PQ testing of new equipment

. Provided time study analysis for syringe production lines; Calculated

and evaluated rates of output

. Identified and tracked Materials In Process. CAPA.

MARKETING MANAGER Opportunities Unlimited Niagara Falls NY 4/85-12/90

Supervision of group leaders and employees. Solicit, develop and

implement subcontract and prime manufacture of goods or services from

business, industry and government. Formalized bid, time studies and

scheduling of work for two subcontracting workshops for the mentally

handicapped. Successfully increase production from the preceding year,

each year by over 40%.

EDUCATION

SUNY Binghamton NY M.S., Industrial Engineering 2003

SUC Buffalo NY B.S., Industrial Technology Engineering

1985

SUNY Alfred NY A.A.S., Business Administration

1982

computer Skills

MS Office, MS Access, MS Project, Visio and MS Outlook. Arena Simulation,

Netsuite, JD Edwards, Peoplesoft, ERP, SAP, BPCS and pcMRP.

ACTIVITIES

Restoration of Antique Automobiles, Sewing, Historical Research (DAR)



Contact this candidate