JOHAN J. HARDY
**** ***** ******** ****** #*-***
Anaheim, CA 92807
email: *****@*******.***
Objective
To obtain Civil/Environmental Engineer position which will utilize my
experience,
education and skills, yet allowing opportunities for growth within
your
organization.
Qualifications
Over 9+ Years Professional Work Experience
Demonstrated Experienced with Water and Wastewater Projects
Proven Experience In All Phases of Engineering
Proven Experience In Project Management Experience
Masters in Civil / Environmental Engineering
Strong Communication Skills
Team Player
Summary of Related Experience
Design Experience
. Water Pipeline Design. The water pipeline design (8" to 18") was
prepared based on the hydraulic analysis and feasibility study
report. The design also included specifications prepared for the
construction bidding. Examples include pipelines extension for:
< Service District (BBCCSD)
< County Service Area
o CSA 70J
o 70L
< Town of Apple Valley Recreational and Park.
< Riverside Highland Water Company
< Running Springs Water District
< West Valley Water District
. Sewer Pipeline Designs. Responsibilities included field data
verification, prepare the propose alignment, tributary area
estimate, pipe sizing, detailed design, cost estimate and
specification preparation. The pipeline designs were prepared
for:
< North Navajo Road trunk sewer (8" to 12") - Victor Valley
Wastewater Reclamation Authority (VVWRA)
< North Apple Valley Interceptor sewer (8" to 24") - Combined
project between Town of Apple Valley, San Bernardino County
and City Victorville.
< Apple Valley Sewer Pipeline Extension - Town of Apple Valley
. Pre-Design Feasibility Studies. In charge for water/sewer
facilities planning (feasibility studies). The water feasibility
studies are using both Kentucky Pipe and H2O Net Program for the
water hydraulic analysis. The sewer feasibility studies are using
the In-house hydraulic program. Both water and sewer feasibility
studies involved a report preparation, generation of water or sewer
demand, siting of on-site/off-site facilities as required,
construction cost, and connection/buy in fee for the new proposed
project. The feasibility studies were prepared for:
< San Bernardino County Special District (County Service Area)
o (CSA)-64
o CSA-70L
o CSA-70J
o CSA- 70B/C
o CSA -53B
< Crestline Sanitation District
< Victor Valley Water District (VVWD)
< Baldy Mesa Water District
< Town of Apple Valley
< Thunderbird Water District
< City of Hesperia
< City of Adelanto
< Big Bear City Community Services District
< City of Big Bear Lake -DWP
< West Valley Water District
< Young Homes
< Soboba Country Club
. Water and Sewer Plan Check and Shop Drawings. Perform a plan checks
and shop drawing reviews for water and sewer improvements:
< Town of Apple Valley
< Victor Valley Water District
< Thunderbird Water District
< City of Big Bear Lake - DWP
< City of Huntington Beach
< Running Springs Water Districts
< West Valley Water District
. Pump Station Upgrade. In involved with a pump station analysis.
Projects included Pump station (both water and sewer) capacity
analysis, preparation for system curve development, pump selection
and station modification of an emergency bypass pump station and
lift station. Also conducted detailed pump station piping design
drawings for uranium removal process.
. Well Equipping - Prepare engineering calculation, engineering
plans, engineering cost estimate and coordination of the
specification:
< City Big Bear Lake - DWP
< City of Loma Linda
. Assist the Project Engineer with a plant expansion feasibility
study at Pilot Rock Conservation Camp for the Crestline Sanitation
District
. Preliminary Design for Plant Expansion. In charge for wastewater
flow analysis increase from the existing plan flow and future flow
(future flow ranging from 3 MGD to 5 MGD).
< Marine Corps Air Ground Combat Center in Twenty-nine Palms,
California
< Victor Valley Wastewater Reclamation Authority (VVWRA)
Master Planning and Other Experience
. Water Master Plan, Responsibilities included field data
verification, gathering database and set up computer hydraulic
modeling (H2O Net and KY Pipe) for evaluation of water distribution
system and calibration. Also prepared the cost analysis for the
capitol improvements programs, connection fee review and report
preparation. The water master plans were prepared for:
< Marine Corps Air Ground Combat Center in Twenty-nine Palms,
California
< City of Hesperia
< Baldy Mesa Water District
< City of Adelanto
< Joshua Basin Water District
< City of Big Bear Lake Department Water and Power
. Sewer Master Plan, Responsibilities included field data
verification, gathering database, land use verification and set up
computer hydraulic modeling (In-house Model) for evaluation of
sewer system capacity and calibration. Also prepared the cost
analysis for the capital improvements program, connection fee
review and report preparation. The sewer master plans were prepared
for:
< City of Big Bear Lake (CBBL)
< Big Bear City Community Service District (BBCCSD),
< Big Bear Area Regional Wastewater Authority (BBARWA),
< City of Hesperia
< City of Adelanto
. Preparation of Urban Water Management Plans
< San Bernardino County Special District - County Service Area
(CSA)-64
< San Bernardino County Special District - County Service Area
(CSA)-70L
< Victor Valley Water District (VVWD)
< Big Bear City Community Services District (BBCCSD)
< Baldy Mesa Water District
< Running Springs Water District
. Plan of Service and Water Supply Assessment Reports
< West Valley Water District
. Schedule, organize and prepare report submittal for Sewer System
Overflow (SSO) and Sewer System Management Plan (SSMP)
< Big Bear Area Regional Wastewater Authority (BBARWA),
. Monthly Inflow and Infiltration Monitoring for City Big Bear Lake
Department of Sanitation. Responsibilities include assisting the
City Engineer to update monthly flow data in graphic form,
inputting data and running the sewer modeling for the system
Agreements
. Reimbursement Agreement. Prepare the cost estimate to be
reimbursed to the developer if any other parcels or new
developments are benefit from the new improvement (water or sewer
pipeline improvement). The credit will be based on the acreage of
each parcel. The report format will then submitted to the client.
The agreements were prepared for:
< County Service Area (CSA)-70J,
< CSA-70L
< Town of Apple Valley.
. Other Agreements
< Service Agreement. The agreement was prepared between the
Agency (BBCCSD) and Developer (new tract housing) regarding
the new infrastructure and service will be maintained by the
agency.
< Entitlement and Special Utility Easement Agreement. City of
Huntington Beach.
. Yearly Connection Fee Review. Prepare the annual adjustment
connection fee review based on Engineering New Records (ENR) for:
< BBARWA
< San Bernardino County Special District - County Service Areas
< Big Bear City Community Services District
< Crestline Sanitation District
Other Experience
Research for Master thesis: Cleaning Effluent Gas Stream through
Biograding -- Using Biofilter. Evaluation of concentrations of toxic
liquid, 1,2-Dichloroethane; heavily used in aviation (most notably as
degreaser) and in industry generally. Appraoch: Constructed apparatus
whereby liquid 1,2-DCA was converted to gas. Gas then passed through
Granular Activated Carbon (GAC) containing phenol substrate and
specially GAC-phenol-grown bacteria inside biofilter. Had good
success. The analysis were done by using a few different laboratory
instrumentation and analysis, such as: Gas Chromatography (GC), UV-
Visible Spectrophotometer, Liquid Chromatography (HPLC), Ion
Chromatography (IC), Titration test, Heterotrophic Plate Count
(Bacterial Growth), pH test and Chloride test.
Education
M.S. Environmental Engineering, Oklahoma State University, Oklahoma
1998
B.S. Chemical Engineering, University of Tulsa, Oklahoma 1995
Professional Activities
California Water Environment Association Desert / Mountain Section
Treasurer (2000-2001)
Secretary (2001-2002)
Treasurer (2002-2008)
High Desert Mountain Water Association (HDMWA)
American Society of Civil Engineer
Water Environment Federation
Trainings
H2ONET Training Course, Sewer System Management Program (SSMP)
Training and Peerless Pump Training.
Publications
"Removal of Air-Phase 1,2-Dichloroethane In a Biofilter; A Comparison of
Cometabolism Using Pre-Loaded Phenol and Concurrent Phenol Addition",
Journal of Environmental Science and Health, Part A, Vol.34, No. 8, 1999.