WUSU J. SESAY
Cedar Rapids, IA 52402
abmwc0@r.postjobfree.com
PROFESSIONAL QUALIFICATIONS
Offer twenty-three years of manufacturing supervision, supply chain
management, assembly, packaging operations, 3PL logistics, and classical-
industrial-engineering role in manufacturing, distribution, food and
beverage. Possess the ability to approach manufacturing and distribution
operations with sound scientific/engineering and team methodologies.
Computer systems: MS Word, Access, Excel, Outlook, PowerPoint, Project,
Visio, AS400, AutoCad, Arena, i2, ILOG, CPLEX, and LINDO.
ACCOMPLISHMENTS
UPS (5 years) Industrial Engineer:
. Significantly improved district effectiveness to 99.998% using time
studies and work standards development.
. Improved resource utilization and operating efficiency.
. Initiated effort for freight consolidation from small to large
shipments showing cost savings of $1, 275, 000 per year.
Coca-Cola Bottling Company/Production (2 years) Production/Inventory
Control Analyst: Managed production team using continuous process
improvement (CPI) to design or improve work methods to maximize
productivity.
. Maintained and distributed daily production schedules to reschedule
and expedite open work orders
. Resolved issues with work orders and delivered material and/or
product on time.
Results: Increased production by 15%.
Foster Food Products (13 years) Production Supervisor:
. Analyzed and determined work measurement and methods
. Analyzed and determined inventory requirements in a multiple
plant/warehouse environment.
. Used Distribution requirements planning (DRP) to work directly with
material requirements planning (MRP) to facilitate continuous
improvement methods.
Results: Increased productivity and line efficiency by 12% and reduced
operating costs by 5% ($7.5 million) per year with an annual operating
budget of $150 million.
PROFESSIONAL HISTORY
WORLEY WAREHOUSING, Cedar Rapids, IA (12/2009 - Present)
Packaging Engineer: Contract Position
. Assigned priority and resources to production initiatives.
. Managed and monitored production operations and efficiency to ensure
highest quality, productivity, and efficiency standards are
maintained.
. Kept close track of incoming products and outgoing shipments.
. Checked quantities, for damage and filled out damage reports if
necessary.
. Maintained expected inventory levels and accuracy.
. Established standards of process design and developed action plans.
QUAD CITY HOSE, Davenport, IA (01/ 2008 - 09/ 2009)
Production/Quality Control Analyst: Contract Position
. Managed and controlled the production and operating activities to
ensure optimum utilization of personnel, materials, and equipment.
. Ensured adequate resources were available to manufacture product
(equipment, supplies, and labor).
. Observed, analyzed, and made adjustments to specifications, material
methods and equipment as required by the Society of Automotive
Engineers (SAE) of America.
. Reviewed standard practice to determine and publish the tolerances and
dimensions which apply to the materials to be prepared, equipment set
up, cure press and mold setup.
. Analyzed inbound and outbound movements of materials and finished
products.
. Performed continuous process improvement and focused on quality, cost,
delivery, and people.
. Developed a strategy for pick and pack and analyzed inventory of
materials and finished products.
. Inspected the products if required for defects and quality.
. Project management - Utilized ILOG Gantt with Gantt charts for
planning and scheduling delivery dates of final products, assemblies,
or subassemblies.
. Applied excellent knowledge in continuous improvement techniques and
analytical tools such as lean manufacturing, Six Sigma (DMAIC) and SPC
to achieve improved business results.
. Used geometric dimensioning and tolerancing (GD&T) to read and
interpret dimensioning systems related to manufactured products.
VOLT SERVICES GROUP
CATERPILLAR INC, Irving, TX (12/2006 - 12/2007) Contract Position
Materials Specialist:
. Developed inventory strategies and continuous process improvement
(CPI) to support picking and packing parts to meet deadlines.
. Inventoried, labeled parts, and controlled physical supply system and
physical distribution system.
. Determined material handling equipment to support lean manufacturing
parts delivery.
. Planned, implemented, and controlled the efficient, effective flow and
storage of materials, services, and related information from point of
origin to point of consumption.
. Experienced with Statistical Process Control philosophies and
methodologies for tracking materials and parts.
. Reviewed quality systems, process capability, and production part
approval process (PPAP) on materials and parts.
COCA-COLA BOTTLING COMPANY/PRODUCTION, San Leandro, CA (11/2004 - 11/2006)
Production/Inventory Control Analyst: Contract Position
. Supported line operations to achieve production results, continuous
process improvement (CPI), computerized maintenance management system
(CMMS), and total productive maintenance (TPM) tools.
. Maintained the process to execute material requirements planning (MRP)
to plan and schedule shop orders to be released by computer modeling
software - SAP R/3 MM & PP.
. Planned production capacity and accurate scheduling of customer
orders.
. Maintained timely shipment of finished goods to distributors.
. Managed the transactional process of inventory adjustments in the ERP
system to ensure accurate perpetual inventory.
. Gathered and reported established inventory metrics: metrics included
day's on-hand, dollars on-hand, and inventory turns.
. Resolved inventory transaction errors that resulted in inventory
balances negative, identified root cause and resolved through
appropriate transactions in the ERP and WMS systems.
. Utilized ILOG Planner and CAPS LOGISTICS TOOLKIT for modeling and to
develop comprehensive decision-support for dynamic dispatching, route
planning, supply chain analysis and shipment planning in logistics and
distribution.
. Analyzed statistical data and product specifications to determine
labor and performance standards for the warehouse distribution center
in unionized environment.
. Recommended methods for improving utilization of personnel, material
and utilities.
UNITED PARCEL SERVICE (Supply Chain, Logistics & Transportation)
Oakland Int'l Airport/Richmond Hub, CA (03/1999 - 10/2004)
While working for United Parcel Service - Completed my Engineering Degree
Industrial Engineer: Full Time Position
. Established Incentive Standards using Watch Studies, standard Palm
PDAs, Standard Data, MTM, and MOST.
. Analyzed and developed Standard Data elements for a variety of
operations such as process improvement, ergonomic studies, work
measurement, simulation, and lean concepts.
. Developed and maintained labor and time standards.
. Maintained workflow by drawing and studying process flowcharts.
. Evaluated new or improved operating methods, technology, and
equipment.
. Adjusted standards and procedures, and designed facility layouts as
needed to reflect changes in business requirements, policy and special
projects management- AutoCad.
. Experienced with initiatives to optimize package-picking locations for
improved productivity and hub services - utilized Critical Path Method
(CPM) and cause-and-effect analysis.
. Collected and analyzed data with application of i2, ILOG and CPLEX for
modeling, network optimization and/or supply chain redesign purposes
as a result of new business opportunities or existing customer
requests.
. Developed and managed guidelines for placing packages in hubs.
. Utilized cost reduction techniques and proven track record for
accuracy and excellent interpersonal communication skills that
contributed to effective teamwork.
. Performed Classical I.E. duties as needed.
FOSTER FOOD PRODUCTS (Further Processing)
Turlock, CA (06/1985 - 02/1999) Full Time Position
Production Supervisor:
. Managed and motivated 35 union personnel to increase productivity by
14%.
. Maintained line balancing and plant layout.
. Planned materials to align with customer requirements.
. Addressed materials forecasting needs and priorities for specific
customer orders making revisions as needed - Infor PM Forecasting
Software, LINDO for modeling and optimization, SCM and MS Excel.
. Planned and expedited purchases and production in all aspects of the
manufacturing process to ensure timely building and shipping of
products.
. Investigated and resoled shortages and any material issues.
. Audited transactions for production receipts, incoming materials and
inventory transactions.
. Planned, organized and executed annual physical inventory process.
. Generated and implemented process improvements to increase control and
effectiveness of material flow.
. Continued monitor of the Hazard Analysis and critical control Point
(HACCP) program including staff training for the manufacturing
facility.
. Worked very closely with USDA employing GMPs, CMMS, TPM and various
other governmental policies and procedures.
KEYWORD SUMMARY
Production Supervisor, Quality Control Analyst, Logistics Engineer,
Materials Engineer, Supplier Quality Engineer, Inventory Control Analyst,
Cost, Delivery, 6 Sigma, Continuous Process Improvement, Good Manufacturing
Practices, Hazard Analysis Critical Control Point, Inbound and outbound
Analyst, Packaging Engineer, Production Control Analyst, Industrial
Engineer, Production Planner, Scheduling, Transportation, Lean
Manufacturing, Problem Solving, Project Management, Shop Floor, Safety,
Ergonomics, Most, and Warehousing.
EDUCATION
BS in Engineering
June 2003
California State Univ.-East Bay (formerly Hayward), Hayward, CA
Major in Engineering with concentration in Industrial Engineering and minor
in Economics
BS in Business Administration
December 1988
California State Univ. - Stanislaus, Turlock, CA
Concentration in Production operations Management