Post Job Free
Sign in

Project Manager Engineer

Location:
Hastings, MN, 55033
Posted:
April 27, 2010

Contact this candidate

Resume:

Jeffery T. Davis, PE

Principal/Senior Project Manager

General Background

More than 20 years of experience in management, development, design and

construction of industrial, water resources and municipal related projects.

His management experience includes large site development, dams, flood

control, municipal utilities and streets. Construction costs on projects

range from $15,000 to $900 million. Former consulting city engineer for the

cities of Stillwater and Bayport.

Responsible for project management, civil engineering design, cost

estimating, hydrologic and hydraulic modeling of a large variety (both in

scale and scope) of industrial, water resource, flood control, and

municipal projects. As a Project Manager, responsible for staffing,

management, coordination of all stakeholders, quality assurance and

coordination of the project team along with the following

competencies/qualities:

1. Management of a broad range of projects including local, county,

federal and private clients.

2. Consistently produces results that meet/exceed project goals and

working standards.

3. Achieves results by problem solving and setting priorities.

4. Posses, acquires and maintains technical and professional expertise.

5. Demonstrates good communication through active listening, presentation

skills and correspondence.

Experience

Project Manager for:

Itasca County - Public Support Infrastructure for MSI - Nashwauk,

Minnesota. Conduct an investigation for the public support infrastructure

including preliminary engineering, site evaluation, high pressure gas

supply and highway, and railroad for the first U.S. fully integrated sheet

minimill that incorporates a new taconite iron ore mine, concentrator,

pelletization plant, direct reduction iron (DRI) facility, melting furnace,

and a thin-slab caster and hot strip mill to produce high quality hotrolled

sheet steel. Estimated cost: $1.6 billion. (2005)

Mesaba Energy IGCC Project - Hoyt Lakes, Minnesota. Business and strategic

planning, preliminary engineering, site selection, high voltage

transmission interconnect, environmental permit and development strategies

for proposed 2000 MW Integrated Gasification Combined Cycle (IGCC) coal

gasification facility with additional 1000 MW capacity to be provided by

wind energy, biomass, fuel cell and/or pumped storage. Estimated cost: $2

billion. (2010)

Tower Harbor - Tower, Minnesota. SEH developed a concept plan, conducted an

economic feasibility study to define and justify associated with the

project. This project also includes strategic planning to develop the

funding sources to support the harbor and highway/bridge improvements.

Estimated cost: $16 million. (2004)

Crookston Flood Control, Stage 2 - U.S. Army Corps of Engineers, St. Paul

District. Assisted in the development of a feature design memorandum to

address interior drainage and update the overall project costs. SEH staff

discovered geotechnical and civil inaccuracies and performed the remedial

design to keep costs within the Federal Appropriated Project budget. Based

on the revised design, SEH developed plans and specifications for 8,500 LF

of clay levee, five pump stations, 2,500 LF of street and utility

reconstruction, 2 major road raises and high flow cutoff channel 3.

Approximate construction costs: $4 million.

Little Calumet Flood Control, Stage VIII - U.S. Army Corps of Engineers,

Chicago District. Assisting in the development of plans, specifications and

estimates for a 1.5-mile reach of the Little Calumet River through an area

that is presently commercial and residential in nature. Main features

include: 8,600 LF of clay levee; 7,000 LF of floodwall; 10,000 LF of

recreation and maintenance trail; modifications to 6 pump station

structures; coordination with 10 major utilities representing more than 90

utility crossings in the project reach; one pedestrian bridge; and interior

drainage and utility design. Approximate construction cost: $12 million.

Phase 1 & 2, State of Minnesota Storm Sewer - Middle St. Croix Watershed

Management Organization (WMO). Assisted the WMO in the design and

construction of 4,500 LF of 36-inch, 42-inch, and 48-inch trunk storm sewer

from the Minnesota Correctional Facility - Stillwater to the St. Croix

River. Project requirements/features include: excavation to 26-foot depths;

well point dewartering; extensive coordination including storm sewer

construction across the railroad right-of-way during the Allen King Power

Plant maintenance shutdown; traffic control for two Mn/DOT highway closures

and one Washington County Highway Closure; temporary reconstruction of 800

LF of City street to accommodate construction; easement descriptions and

property surveys by stack land survey. Construction cost approximately $1

million.

Phase 3, State of Minnesota Storm Sewer - Middle St. Croix Watershed

Management Organization (WMO). Assisted the WMO in evaluating the

feasibility of constructing an alternate outlet for Perro Creek through the

City of Bayport, Minnesota. Project consists of 1,400 LF of 48-inch to 54-

inch storm sewer, inlet and outlet structures, street and utility

reconstruction, railroad track removal and replacement and definition of

easements. Discharge capacity of the system is 120 CF per second. Project

costs are estimated at $1.3 million.

Crookston Stage 3, Flood Control Reauthorization Study, Sampson and

Chase/Loring Additions, Crookston, Minnesota. Developed the local flood

control feasibility report supplement to address the features within the

Sampson's and Chase-Loring neighborhoods. Based on the re-evaluation,

improvements within these neighborhoods exceed a B/C ratio of 1.0 when

viewed as a combined project. This provides the ground work for the City of

Crookston to pursue expanding the flood control project from about $11

million to $25 million.

CNW Levee Closure, St. Paul, Minnesota - Chicago and North Western

Railroad. Assisted in evaluating three conceptual designs and final design

for a double track skewed structural closure through the Metropolitan

Council Environmental Services' flood control levee at the Metro WWTP.

Final design eliminated construction impact on the Superfund site, located

just north of the closure.

St. Paul Stage 2 Flood Control, Mississippi River, St. Paul, Minnesota -

U.S. Army Corps of Engineers, St. Paul District. Assisted the Corps in

developing plans and specifications for raising 8,700 feet of floodwall and

levee. Project included five closure structures and extensive utility and

agency contact including Mn/DOT, FAA, and Chicago and North Western

Railroad.

Long Lake Watershed Study, Phase II Construction Staging Plan - Stillwater,

Minnesota. Provided a hydrologic and hydraulic analysis of existing

conditions on the 2,200-acre Long Lake Watershed. Project includes

evaluation of flooding potential and recommendations for improvements.

Phase II includes a review of future conditions and design solutions to

Phase I concerns. SEH was able to secure a Flood Hazard Mitigation Grant

for the City as part of this project.

Perro Creek Minor Watershed Study, Bayport, Minnesota - Middle St. Croix

River WMO. Analyzed runoff from 1,700-acre watershed and performed

preliminary hydraulic and structural design multiple control structures.

Partial funding was provided through a MDNR Flood Hazard Mitigation Grant.

County Road 21 Pond Outlet, Washington County, Minnesota - Middle St. Croix

River WMO. Analysis, design and construction of an outlet structure for

Prison Pond in coordination with CR 21 Reconstruction and recommendations

for the Middle St. Croix River WMO.

Hydraulic Analysis Browns Creek WMO - Washington County, Minnesota.

Assisted in evaluating capacity of hydraulic structures throughout the

watershed. Updated mapping based on evaluation.

Flood Hazard Mitigation Grant, Washington County, Minnesota - Browns Creek

WMO. Assisted the WMO in writing a Flood Hazard Mitigation grant. SEH was

able to use background data collected over the years to develop the

successful submittal. The Browns Creek WMO received approximately $30,000

in matching funds to update the Watershed hydrology/hydraulic study.

Lake Altoona Sediment Reduction, Altoona, Wisconsin - Lake Altoona Lake

Association. Assisted in the development of plans and specifications for

310,000 CY of dredging from the Eau Claire River and Lake Altoona. Also

included in the design is a 60-acre disposal area. Responsibilities

included plans, specifications, quantities and civil design.

Metro Wastewater Treatment Plant - St. Paul, Minnesota. This project

included many different tasks. SEH developed master specifications, design

guidelines, master details, inspection of 12 separate utilities and

development of computer models for simulation of existing and future

conditions.

Churchill and Pine Street - Stillwater, Minnesota. Reconstruction of 5,800

feet of Municipal State Aid (MSA) street though existing neighborhoods.

Project included street, sidewalk, storm sewer and restoration.

Project Engineer for:

Stage 1A-1 Flood Control, Zumbro River, Rochester, Minnesota - U.S. Army

Corps of Engineers, St. Paul District. Assisted the Corps in developing

plans and specifications for a rip rap lined channel on the South Fork

Zumbro River.

Rochester Stage 1B-1 and 1B-3 Flood Control, Zumbro River, Rochester,

Minnesota - U.S. Army Corps of Engineers, St. Paul District. Assisted the

Corps of Engineers in developing plans and specifications for

rehabilitation of the Silver Lake Dam and 5,300 feet of riprap and

retaining wall lined river channel. Project duties also included estimating

the $15 million projects.

New Richmond Dam Reconstruction - New Richmond, Wisconsin. Developed plans

and specifications for the reconstruction of the dam including three 24-

foot tainter gates, rock anchors, automated controls, and equipment

building. Duties included project management, contract administration,

civil design and cost estimate.

Diversion Channel, Grand Forks, North Dakota - U.S. Army Corps of

Engineers, St. Paul District. Assisted in development of the Plan

Comparison Letter Report for the 22-mile diversion channel west of the City

of Grand Forks. Project duties included development of the $900

construction estimate.

Levee and Flood Control Wall, Grand Forks, North Dakota and East Grand

Forks, Minnesota - U.S. Army Corps of Engineers, St. Paul District.

Assisted in the development of the Plan Comparison Letter Report for

approximately 30 miles of levee and flood control wall. Project duties

included development of the $300 million construction estimate.

Education

Bachelor of Science

Civil Engineering

University of Minnesota

Associate of Arts District One Technical Institute

Eau Claire, Wisconsin

Introduction to AutoCAD St. Paul Technical College (1993) Unsteady

Flow Modeling Using DAMBRK and DWOPER University of Texas, Austin

Team Building College of St. Thomas

Project Manager Advanced Skills College of

St. Thomas (2000)

Supervisory Leadership Wilson Learning (2000)

Systematic Development of Informed Consent (2004)

Situational Leadership (2006)

OSHA 10 Construction Safety (2008)

Professional Registrations

Professional Engineer in Minnesota, Wisconsin, North and South Dakota

Previous Employment

Short Elliott Hendrickson Inc. Principal

Contact Information:

Home: 715-***-****

Mobile: 651-***-****

Email: **************@*****.***

Address: 387 Young St. S.

Prescott, WI. 54021

References:

Dave Pillatzke, PE

612-***-****

Al Geisen

1-701-***-****

Chuck Michael, PE

612-***-****



Contact this candidate