Phone: 269-***-****
E-mail: *******.*.******@*****.***
Zeeland, MI 49464
Education
Bachelor of Science in Engineering - Graphics & Design Technology with
Automotive Option
Western Michigan University, Kalamazoo Graduation: April 2008
Senior Design Project: A cabinet flipper door was re-designed using
design for manufacture and assembly methodology. The overall design of
the door was simplified and cut assembly time by 80% and increased design
efficiency by 30%. A comparative cost analysis was performed between the
first design and our redesign which showed a savings of $4 per door.
Software
Pro/E, Catia V5, I-DEAS, AutoCAD, Microsoft Words, Excel and PowerPoint,
Lotus Notes and Campfire
Training
DFMEA, Lean Manufacturing, Geometric Dimensioning & Tolerancing,
Time Management, DVPR, Kaizen, A3
Experience
Project Engineer
Summit Polymers, Inc
March 2008-Oct. 2009
2011 Jeep Grand Cherokee Air Vents
> Design Phase
. Review feasibility of new company design standard
. Create 2D drawings from 3D design
. Create tooling layouts with parting lines for tool shop
. Review tool data to verify proper tool layout
2010 Cadillac SRX Air Vents
> Pre-Production Phase
. Review purchased components to verify parts are within
specifications
. Tune parts using Kaizen process to meet strict customer
specifications
. Correct fit and attachment issues to satisfy customer
2011 Ford Taurus Air Vents
> Production Phase
. Review parts from production tooling
. Tune production quality parts to fit customer specifications
. Oversee production of assembly equipment
. Work with manufacturing engineer to correct process and assembly
issues
. Prepare parts for extensive testing per customer requirements
. Travel to customer plant for prototype vehicle builds
2011 Nissan Infiniti QX Console Lid
> Pre-Production Phase
. Review production tooling to verify parts meet specifications
. Build production quality parts and verify all parts meet
operating specifications
. Review and approve gage design
. Work with SPI production plant to create operator instructor
sheet
2012 Volkswagen NMS Air Vents
> Prototype Phase
. Create prototype tooling layouts
. Review prototype tool data
. Travel to overseas tool shop to tune parts to customer
specifications at tool shop
. Manage tool shop employees to build prototype parts to send to
customer
. Review mold flow analysis on all components
> Design Phase
. Review prototype parts and fix design issues
. Direct designers on new design direction
. Create DVPR for new customer
. Create DFMEA for new customer
. Review SPI checklist to verify all company standards are
followed
. Review 3D data daily
. Review FEA analysis to verify parts will pass requirements
. Run mold flow analysis on all components
Activities/Volunteer
Theta Tau Professional Engineering Fraternity
. Treasurer - correct financial books and create spreadsheet for
tracking all account transactions
. New Initiate Instructor - create quizzes and booklets for new
initiates and plan all events
. Voted Outstanding Student Member by chapter members
Foundation Fighting Blindness
. Volunteered for Live/Silent Auction for 10 years
. In charge of all student volunteers and organizing items for
checkout