Rafael A. Rios
PO Box *** Trujillo Alto, Puerto Rico 00977 787-***-****
************@*****.***
SR. MANUFACTURING / OPERATIONS MANAGEMENT PROFILE
Results-producing management career spanning 10+ years demonstrating year-
over-year improvements in Quality, Cost and Productivity in the
Pharmaceutical Industry. Decisive operations leader with excellent
analytical, organizational, team building and planning skills. Strong
reputation of commitment & integrity, focused on developing a results-
oriented organizational culture through the deployment of lean six-sigma
and other continuous improvement initiatives. Disciplined manager with
success in leading & challenging cost reduction initiatives, planning and
scheduling, finance & budget management (operations and capital),
personnel administration, process engineering and capital improvements
projects. Ability to handle complex planning and coordination's in a high-
pressure environment. Fully computer literate, including Windows OS,
Microsoft Word, Excel, Power Point, MS Project, Minitab, GxPharma, SAP,
Kronos, TIMS as well as other proprietary applications. Bi-lingual in
English & Spanish, Available for travel and relocation.
PROFESSIONAL STRENGHTS
. Operations Management
. Process Engineering & Redesign
. Aseptic Fill/Lyophilization
. Project Management
. Safety Standards and EH&S
. Lean Six-Sigma Green Belt Certified
. Eng./Production Maintenance
. Cost Containment & Reduction
. Regulatory & Compliance
PROFESSIONAL EXPERIENCE
PFIZER - Carolina, Puerto Rico (2002-2010)
Manager, Production Operations
Manager, Engineering / Production Maintenance
Directed all aspects of the manufacturing operations (formulation,
filling, sanitation, lyophilization, sealing, packaging, production
maintenance and process engineering / improvements). Established
performance indicators (KPI's), operating goals, transformation
initiatives, training plan, coaching and development, productivity
improvements, cost reduction program and capital project management.
Temporarily assumed Director / Leadership PPU responsibilities. Managed
staff of 4-8 direct reports and 100+ indirect reports. Developed and
administered a $12 million operating budget.
ACHIEVEMENTS:
. Led Green Belt Project (Tygacil Yield Improvement), re-designed
process, reduced product waste, improved yield 10.5%, applied DMAIC,
Kaizen workshops and other Lean Six-Sigma methodologies and ideas
generated by cross-functional team (supervisors, engineers, operators
and technicians).
. Restructured and synchronized PPU resources (Tygacil Flexibility
Project); achieved 21% reduction in standard cost, reduced 80% Job
Descriptions, integration to line-profile manufacturing operators /
technicians, achieved cost reduction of $750K in operating costs.
. Led-Couch-Mentor PPU Green Belt Candidates; project scope &
development, DMAIC methodology, Kaizen workshops, Standard Work, 5S,
Lean Six-Sigma tools, Projects update & presentations.
. Reduced 85% equipment mechanical interventions and improved overall
OEE up to 65% by initiating, implementing and managing new PM / PdM
activities.
. Improved First Time Quality; reduced 82% events (MIR's) and 93% in job
performance.
. Zero (0) FDA / MHRA observations (manufacturing & packaging) for the
last two years.
. Secured bottom-line savings of $800K through headcount reduction, by
optimizing manufacturing processes as well as instituting controls and
accountability.
. Drove forward productivity improvement initiatives that allowed
significant efficiencies and cost reduction including but not limited
to: Yield improvements 10.5% and cost savings $2.4M, improved
customer service levels up to 99.7% and schedule adherence 98%,
Reduced; overtime by 50%, cycle time 40% and downtime 85%, mfg.
supplies expenses $600K, batch record errors 80%, manufacturing
documentation simplification (MES) and SOP harmonization, Zero (0)
loss time safety incidents (2006-2009), etc.
. Awards: Three-Time Best Site Project (2009, 2005), Two-time Wyeth
TOP&S Best Practices Global Recognition (2009), Wyeth TOP&S
Presidential Award (2009).
BRISTOL MYERS SQUIBB - Manati, Puerto Rico (2001-2002)
Sr. Supervisor, Manufacturing & Lyophilization
Led and oversaw the effective utilization of people, equipment's and
materials; for safety and discipline, product quality, compliance,
manufacturing efficiency schedules adherence and cost improvement. Manage
the Aseptic Filling & Lyophilization Operations (24 Hrs./ 7 Days
Operation); Lead all Lyophilization and Mfg. Process investigations.
Managed 35 direct reports.
ACHIEVEMENTS:
. Optimized productivity by 15% through development and implementation
of continuous product flow line using lean manufacturing
methodologies.
. Drove forward productivity improvement initiatives that yielded a 20%
in syringe line efficiency.
AMGEN - Juncos, Puerto Rico (1999-2001)
Assoc. Manager, Manufacturing
Managed aseptic filling operations (vials & syringes), assure effective
management and utilization of resources; equipment's and materials;
safety and discipline, product quality, compliance, manufacturing
efficiencies, schedules adherence and cost improvements. Managed 4
direct reports and 60 indirect reports.
ACHIEVEMENTS:
. Implemented process improvements to reduce product waste, improved
yield by 2% for low volume lots and establish inventory controls that
resulted in cost saving of manufacturing supplies ($100K).
. Implemented process and equipment improvements to eliminate product
rejection (particles).
. Outstanding compliance record during FDA / MHRA inspections.
Wyeth-Ayerst Lederle, Carolina, Puerto Rico (1992-1999)
Production Maintenance & Lyophilization Superintendent
Production Supervisor
Extensive supervisory background in overall manufacturing & Packaging
operations (Component Preparation, Aseptic Filling, Sealing,
Lyophilization, Clean Rooms (Class 100) & Sanitation, Visual Inspection
and Packaging Process), management of process engineering / improvements,
production maintenance team and shutdown management. Managed 45 direct
reports (operations & technicians).
ACHIEVEMENTS:
. Led the maintenance re-organization, staffing justification to manage
increased volumes and 24/7 coverage, oversaw process engineering /
improvements of major equipments, repairs and overhaul, production
shutdown, CAL, PM and PdM's. Reduced equipment downtime by 20%; zero
(0) associated events (MIR's) due to equipment malfunctions or
deviations.
. Project Management; Administered PPU Capital improvement Projects;
identified, justified, budgeted, developed, planned, scheduled and
monitored for on-time execution and completion, reduced process
vulnerabilities & gaps.
. Drove forward productivity improvement initiatives to improve step
yields 3-5%, reduced department overtime over 50%, reduced mfg.
supplies expenses > $150K and PPU MIR's reduction > 50%.
. Glass Particle Reduction Team - Project Leader; Awarded Best Practice
Site Project - Carolina Plant & participated TOP&S Global Recognition;
identified /eliminated glass particulate sources, equipment re-
designed and controls implemented, re-established supply domestic /
Japan Market, eliminated product backorders and improved Quality -
eliminated associated events / investigations.
EDUCATION & TRAININGS
MASTER BUSINESS ADMINSTRATION (MBA): University of Phoenix, Guaynabo
Puerto Rico
BACHELOR OF SCIENCE, ELECTRICAL ENGINEERING (BSEE): Polytechnic
University of PR, Hato Rey, Puerto Rico
Black Belt Training completed - Rath & Strong, Maintenance Excellence
Training's; Lyophilization Technology (Lyophilization Theory, Freeze
Dryers Maintenance & Troubleshooting), Mindset & Behaviors, Change
Management and Couching & Development.