Wayne Derek Carr LEED A.P.
Reno, NV. 89511
abmvie@r.postjobfree.com
LEED accredited Mechanical Designer with 25 years experience in the building construction
i ndustry upon graduation from Cal Poly State University-San Luis Obispo, CA. Autocad
experience includes version 12 in 1989 through version 2010 with 3 rd party Building Information
Modeling software. Proficient with Trane, DOE and Carrier HAP Load calculation software.
WORK H ISTORY
Savage and Son I nc. : M echanical Designer & Coordinator, CAD System Manager
(June 2005-November 2009)
Design/Build Projects: Eldorado Casino boiler, laundry, and Baldini’s Casino Expansion,
Northern Nevada Concrete office and warehouse buildings, Champagne Dental office, Pinocchio’s
Restaurant.
Mechanical Coordinator/Piping Fabrication Detailer- Plan and Spec Projects: Peppermill Casino
Hotel Tower, Atlantis Casino Expansion and Spa, Renown Regional Medical Center Tower,
U niversity of Nevada Reno; Joe Crowley Student Union, Nye Hall ADA remodel and Molecular
Medicine Laboratory and Medical Office buildings.
X NT H, formerly GRG I nc. Consulting Engineers : M echanical Designer/Project
M anager (June 2001-May 2005)
Projects: Veteran’s Administration- Reno MRI site prep., steam plant system analysis, AHU
replacements, DDC upgrade, OR/ICU remodel, Inpatient Pharmacy remodel, Angiography room.
T ruckee Meadows Water Treatment Facility Lab remodel, Washoe County Jail- laundry and
housing heat exchanger, South Valleys L ibrary, City of Sparks Library-boiler replacement, City of
Sparks Engineering-Mechanical System upgrade, Northern Nevada Community College- boiler,
chiller and AHU replacement, University of Nevada Reno parking garage, Necropsy Lab, Getchel
L ibrary Data Center. Other projects include office buildings, warehouses and retail centers.
L & L P lumbing I nc .: M echanical Designer/ CAD System Manager (June 1998-May 2001)
Design/Build Projects: Bently Nevada R&D facility, Minden, NV, retail centers, strip malls,
warehouse buildings, dental offices, machine shops, brew pub, and medical R&D buildings.
T r i State Surveying : F ield Technician ( March 1997- May 1998)
Job responsibilities: Boundary, topographic and RTK surveys using either conventional or
T rimble GPS equipment.
Projects: Housing subdivisions, topographic survey of H ighway 89-Sand Harbor to South Lake
Tahoe, H ighway 80-Nightingale area. GPS survey for the Alturas to Reno power line.
D inter Engineering : M echanical Designer (February 1993-February 1997)
P rojects: Nevada Air National Guard Avionics Building, Underground fuel storage tank
replacement, jet fuel system upgrade, Flight Simulator Building, University of Nevada Reno Nye
H all laundry, Chemistry building, Northern Nevada Community College-Winnemucca, and
I ndian Springs Conservation Camp. Office buildings: Bureau of Land Management at Elko,
OTAG building at Carson City, Washoe County M.I.S. building. Industrial projects: Kal Kan
p lant, Tracy, NV.
Western Nevada Supply: M echanical Estimator (June 1992 – February 1993)
Job responsibilities – project cost estimates, over the counter and phone HVAC equipment sales,
mechanical system selection and drawings.
Montgomery and Roberts Consulting Engineering: Mechanical Designer (April 1989 -
J une 1992)
Projects: Acalanes, Mi ramonte, and Los Lomas schools. Hospital projects: Delta Memorial Cath
L ab and AHU replacement project. M t. Diablo hospital bulk oxygen relocation, new
E mergency/Cancer Center wing and Labor, Delivery, Recovery, Procedure facility.
F rederi ksen Engineering: M echanical Designer (September 1988 – April 1989)
Projects: Lawrence Livermore Lab S.D.I. expansion project, including 200,000 sq. ft. lab
s tructure with interstitial f loor for mechanical equipment. Designed the mechanical system for
t he U.P.S. building at the Oakland In ternational Ai rport and acted as the purchasing agent for
equipment for the ICI Chemical Fertilizer plant in Richmond, CA.
T ed Jacob Engineering Group, I nc: Mechanical Designer ( March 1988 – August 1989)
Projects: Kaiser Santa Teresa Medical Center HVAC deficiency study and bathroom upgrade,
K aiser Redwood City Medical Center HVAC study, Kaiser Oakland Teletraining and Computer
room, and 3rd f loor remodel, U.C. Santa Cruz Assembly Hall remodel.
Bentley Engineering Company: Mechanical Designer/Project Manager (September 1984
– February 1988)
Projects: Commercial buildings, hotels, postal facilities, computer centers, and warehouses.
U nited States Navy shore power facili ties for USS Missouri at Hunter’s Point and destroyer f leet
a t Treasure Island. Project manager for the following high r ises: Clorox Building, Oakland, CA.
444 Market Street and 101 California, San Francisco, CA.
United States Navy – Shipboard Electrician
Education: B .S., Engineering Technology, California Polytechnic State University, San Luis
Obispo. Concentration: Air Conditioning and Refrigeration.