Post Job Free
Sign in

Project Manager Engineer

Location:
Greer, SC, 29650
Posted:
May 10, 2010

Contact this candidate

Resume:

Kirkland L. Miller

*** ******* **** 864-***-****

Greer, South Carolina 29650-2820 abmudv@r.postjobfree.com

SUMMARY

Strategic Project Manager / Engineering Leader with a broad background in

strategic planning, team building and decision making skills, focused on

achieving profitable growth consistent with business strategies and

objectives. Recognized for project cost reduction and on-time delivery,

through strategic and technical hands-on leadership. Motivated by the

challenge and leveraging the tools of Lean and SixSigma. Knowledge of

diverse cultural backgrounds. Expertise in the following areas:

Project Management FMEA Product Development

Product Design DFSS Lean Manufacturing

Six Sigma (DMAIC) RCCA Global Quality Assurance

Written, Oral & Computer ISO 9000 ISO Compliance Auditor

Communication

Customer Centricity KAIZEN Supplier Management

PROFESSIONAL EXPERIENCE

GOODRICH - ENGINE COMPONENTS 2005 - 2010

Project Manager - New Products (Hodges SC) (Greenville, SC)

2008 - 2010

Evaluate new product for manufacture and provide quotes, process sequence

development and engineering services. Develop and manage detailed project

plans, resolve customer and supplier technical issues. Evaluate strategic

5-year and business development plans for new technology improvements.

Manage and mentor Engineering team through professional growth and

development of intellectual property designs, equipment and processes.

Perform ISO certification compliance audits.

. Instituted Goodrich Project Plan template and update existing NPP to LPI

in line with Least Waste Way (LWW) project development.

. Completed six existing projects lagging customer required date,

generating millions in sales.

. Initiated and completed 11 new strategic projects to 100% on time

delivery to customer required date, through Value Stream Mapping process

and new LPI procedures.

. Restructured team objectives and empowered 11 Engineers achieving 100%

group trained as Lean Practioners.

. Authored White Paper for Chrome Plate on irregular shape surfaces,

resulting in customer revisions to specifications and acceptance

requirements, saving over $100K in unnecessary rework costs per year.

. Directed and developed three intellectual property designs through

coordinating customer and supplier technical interface reviews and

substantiated supplier qualifications through performance metrics.

. Led Team to improved first pass yield throughput of thermal barrier

coating from 83% to 93%, through application of Continuous Improvement

manufacturing events.

Program Manager-New Products/Engineering Team Leader -

Thermal Coatings and Machining (Hodges SC)

2005-2008

Evaluated new product for manufacture and provide quotes, process sequence

development and engineering services. Developed and facilitated detailed

project plans, and led development team on new products from design to

delivery of mature product. Evaluated strategic 5-year and business

development plans for new technology improvements. Critiqued existing

processes for improvements. Structured team objectives and mentored

engineers toward professional growth. Performed ISO certification

compliance audits.

. Initiated and completed 10 new product projects, leading to an increase

in annual sales by 9%.

. Developed and qualified four new sub-tier suppliers which led to improved

cycle and reduced cost through competitive bids.

Independent Consultant Services 2004 - 2005

Consulting Services for Quality Assurance Engineering, Quality Systems,

Manufacturing Engineering, Program Management, SixSigma Tools, Lean

Manufacturing, and Supplier audits/surveys.

. Developed new processes and implement control processes and procedures to

guarantee conformance to ISO documents. Developed and maintained metrics

to manage programs.

. Reduced manufacturing losses on AGT1500 Compressor Airfoils from 90% to

less than 5%, through the use of Lean and SixSigma strategies, and

reducing the human element.

. Completed 9 Project Qualifications in four weeks. Each project

consisting of Process and Quality Plans, Metallurgical and dimensional

evaluations, and CoC's with customer acceptance.

GENERAL ELECTRIC

GE GAS TURBINE LLC Greenville, SC 1987 - 2004

Advanced Product and Process Engineer NPI - (APPE)

(AME, Sourcing Quality Engineer and Project Manager) Evaluated designs

and managed Compressor Airfoil new product introduction programs. Prepared

MS Project plans and assured operational performance to cost and schedule.

Perform design-to-manufacture capability and developed proposals with

should-cost estimates. Participate in supplier negotiations. Authorized

and tracked appropriation requests for investment and expense items. Led

manufacturing team in design reviews for manufacturability and cost

evaluations.

. Extensive travel including Americas, Europe and Asia.

. Directed multiple concurrent project qualification teams, consisting of 5-

7 engineers, to complete over 500 high-technology and export-controlled

NPI qualifications.

. Reduced Start-up cost by 40% on New Products through competitive supplier

negotiations.

. Co-designed and managed a critical project that attained $42MM in sales

the first year which drove a customer operational loss avoidance of $30K

per hour. Granted a Patent and honored with Intellectual Property Award

of the year for GE Energy.

Advanced Manufacturing Engineer - (AME)

. Developed new CNC Single Spindle High Speed 5-Axis Airfoil Milling

process to reduce manufacturing cost and cycle, improved quality, first

pass yield, and capability enabling new 3D Aero Airfoils manufacture.

Minimized handwork and manufacturing reduced cycle by two days.

. Developed new processes to reduce manufacturing cost and cycle.

Manufacturing Engineer - (ME)

. Using SMED, developed and implemented single generic tooling across 9

types of equipment (28 machines), reducing set-up and lot size and

enabling rapid off machine set-up, resulting in cycle reduction from 14

weeks to 3 weeks and reducing WIP by over 50%.

. Led manufacturing transition team that enabled non-stop manufacturing

during site change. Completed the site transition in 14 months, two

months ahead of schedule.

. Led the $34 million, two-year equipment purchase and installation team to

on-time start-up and provided an integral role in facility expansion

addition.

EDUCATION and PROFESSIONAL TRAINING

B.S., Mechanical Engineering - Union College (Schenectady, NY)

Unigraphics Hybrid Lean Practioner Goodrich People Philosophy

Modeling

Statistical Design Six Sigma Greenbelt Managerial Skills and

Methods Development

PCC Investment Casting Design for Compressor Aerodynamics

Six-Sigma

AWARDS

Intellectual Property Award for Patent Managerial Award - 1991

- 2003

Patent Award - 2003 Merit Award - 1992

SixSigma Greenbelt Project of the Month Power Generation Award - 1993

- 2000

PROFESSIONAL CERTIFICATIONS

Certification GE Global Sourcing Quality Certification Six Sigma

Engineer - 2002 Greenbelt - 2001

American Heart Association - Heart First

Aid Certification



Contact this candidate