Richard S. Gulley
Portland, OR 97202
Email: **********@***.*** Mobile: 503-***-****
summary:
RESOURCEFUL SELF-STARTER, WHO EFFECTIVELY COMMUNICATES PRIORITIES, BUILDS
WORKING RELATIONSHIPS AND IS RESULTS FOCUSED ON DELIVERING AND EXCEEDING
BUSINESS GOALS.
Accomplishments:
. COORDINATED AND MANAGED $1.6 MILLION TOOL INSTALL FOR CLIENT.
. FINISHED TOOL INSTALL PROJECT 40% UNDER BUDGET.
. COMPLETED RAMP FOR 746 TOOLS, INCLUDED DEMO, CONVERSIONS AND INSTALL.
. MANAGE 12 MILLION DOLLAR PRODUCT PORTFOLIO.
. MANAGE GLOBAL SUPPLY CHAIN BOTH DOMESTIC AND INTERNATIONALLY.
. EMPLOYEE MENTOR FOR NEW HIRES.
. MANAGED SAFETY STOCK REDUCTION PROJECT AND REDUCED 1.3 MILLION DOLLARS
IN FY.
. CREATE WORKABLE PLANS AND HELP DRIVE INVENTORY REDUCTIONS BY OVER 1.5
MILLION DOLLARS IN FISCAL YEAR.
. Worked on new product introduction teams from design to market launch
for products that range from 50K to 120K.
. IT and Systems functional expert for planning department. Responsible
for data integrity, testing system changes before roll-out.
. Develop planning tools to support new SSPL Lean Cell environment.
. Streamline distribution process between customer and supplier that cut
inventory-holding cost by $250,000.
work experience:
CH2M HILL PORTLAND, OR AUGUST
2008-PRESENT
CH2M HILL is a global leader in full-service engineering, consulting,
construction, and operations.
Project Coordinator-
. Lead a project team in delivering solutions for customer using the
appropriate business measurements adhering to terms and conditions for
the project, according to the project charter, and project contract.
. Develop Project Plan to include, goals and objectives, scope,
assumptions, constraints, and project timeline.
. Manage all project resources, including subcontractors, work schedule
and materials cost and establish an effective communication plan with
the project team and the client.
. Coordinate construction activities and act as single point of contact
between client and subcontractors.
. Operate in clean room environment, under client's clean room protocol.
. Work though all necessary points of contact to ensure milestones are
met.
. Read and facilitate daily work off of blue print drawings.
. Create daily works schedule and determine priorities from master
construction schedule.
. Incorporate safe work practices are in place and work with trades to
ensure they are working in a safe manner and all PTP are in place
daily.
. Responsible for managing scope, cost, schedule, and contractual
deliverables, which include: applying techniques for planning,
tracking, change control, and risk management.
Tektronix Inc. Beaverton, OR February 2005-
August 2008
Tektronix designs produces and distributes test and measurement equipment
for electronic and electrical industries.
Production Planner-Global Supply Chain
. Manage all planning aspects of new product introductions through
global supply chain. This includes systems and materials.
. Work directly with Tek-Japan in product transition of build out phase-
over products to minimize obsolescence.
. Develop material management strategies and plans that support customer
needs and align with material, production, and business operating unit
strategies
. Create and execute the product master schedule/production plan, and
communicate development of the customer orders forecast.
. Participate as influential member of continuous improvement project
teams and Kaizens.
. Help manage product lifecycle strategies; including new product
introductions, last time buys, lifetime build plans, and product phase-
over.
. Develop monthly S&OP to align manufacturing with a workable build plan
by aligning material and shipments with marketing forecast.
Blount Inc. Oregon Cutting Systems Division, Portland, OR
December -2002- February-2005
Oregon Cutting Systems is the world's leading manufacturer of cutting
chain, guide bars, and accessories for chainsaws and mechanical timber
harvesters.
Production Planner
. Develop plans for product and material availability through SAP.
. Control inventory levels using JIT and assure integrity of inventory
records.
. Coordinate planning activities with shop floor and sales personnel.
. Use lean manufacturing tools to develop efficiencies for the shop
floor.
The Boeing Company, Everett, WA August 2001-
December 2002
Boeing is the world's leading aerospace company and the largest
manufacturer of commercial jetliners and military aircraft combined.
Industrial Engineer/Methods Analyst
. Provide technical and process support for commercial airplanes.
. Generate monthly budget for shop floor based on hours per part, labor
loss, overtime, and head count. Compiled labor and work requirements
data to develop labor forecasts.
. Coordinate, analyze, and present performance data to manufacturing
management for resource allocation decisions.
. Conduct process flow improvements and capacity planning to support
manufacturing processes using lean principles.
education:
OREGON STATE UNIVERSITY, CORVALLIS, OR
Bachelor of Science: Business Administration
Option: General Business
Minor: Pre Law
Pursing Project Management Certificate: Portland State University
core competencies:
PROFICIENT IN MS WORD, EXCEL, ACCESS, INTERNET RESEARCH, ORACLE 11I, SAP,
BAAN ERP, AND MAINFRAME APPLICATIONS. APICS: MASTER PLANNING OF RESOURCES
AND DETAILED SCHEDULING AND PLANNING, MICROSOFT SHAREPOINT, OSHA 10 PROLOG.